更多“Release the ()(制动器)when letting go the anchor.A、stopperB、brakeC、lockerD、derrick”相关问题
  • 第1题:

    Before letting the anchor go, you should check that the ______.

    A.chain is clear

    B.anchor is clear of obstructions

    C.wildcat is disengaged

    D.All of the above


    正确答案:D
    抛锚前,你应该检查:锚链清爽、锚没有阻碍、锚机持链轮脱开。

  • 第2题:

    起货机出故障时,水手要去叫电工来修理。()

    • A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.
    • B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.
    • C、When the winch is in trouble, the sailor must go and call the electrician to repair it.
    • D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.

    正确答案:C

  • 第3题:

    ()do you want the derrick adjusted?

    • A、What
    • B、Where
    • C、How
    • D、When

    正确答案:C

  • 第4题:

    I am ()up anchor.

    • A、weight
    • B、heaving
    • C、have
    • D、aweigh

    正确答案:B

  • 第5题:

    When the derrick is topped, the guys must be ().

    • A、slacked off
    • B、send away
    • C、taken in
    • D、send out

    正确答案:A

  • 第6题:

    单选题
    起货机出故障时,水手要去叫电工来修理。()
    A

    When the windlass is in trouble, the sailor must go and call the electrician to repair it.

    B

    When the derrick is in trouble, the sailor must go and call the electrician to repair it.

    C

    When the winch is in trouble, the sailor must go and call the electrician to repair it.

    D

    When the winch is in trouble, the sailor must go and call the carpenter to repair it.


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().
    A

    string

    B

    stand

    C

    joint

    D

    standpipe


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().
    A

    dock

    B

    hold

    C

    pedestal

    D

    machinery space


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    The rotating unit of a spilt windlass consists of a() with shaped snugs to grip the anchor cablea mooring drum for paying out or letting go of mooring wires and warp end for warping duties.
    A

    cranes

    B

    mooring barrel

    C

    capstans

    D

    cable lifter


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    Tell your men ()the rules and procedures of working when dismantling the equipment.
    A

    not to go against

    B

    don’t go against

    C

    not go to against

    D

    to not go against


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Which sequence is correct when launching a lifeboat stowed in gravity davits?()
    A

    Release gripes,turn on emergency disconnect switch,release frapping lines

    B

    Release tricing pennants,turn on emergency disconnect switch,release frapping lines

    C

    Operate limit switches,release gripes,lift brake

    D

    Release gripes,lift brake,release tricing pennants


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    Which safety check(s)should be made before letting go the anchor().
    A

    See that the anchor is clear of obstructions

    B

    See that the chain is all clear

    C

    See that the wildcat is disengaged

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第13题:

    When the derrick changes its ()(角度), its lifting capacity changes correspondingly.

    • A、angel
    • B、length
    • C、height
    • D、angle

    正确答案:D

  • 第14题:

    When the derrick is stopped, the guy must be ()(收好).

    • A、taken in
    • B、slacked off
    • C、adjusted
    • D、stowed

    正确答案:D

  • 第15题:

    Could you show me ()to operate the derrick?

    • A、which
    • B、what
    • C、how
    • D、when

    正确答案:C

  • 第16题:

    吊杆停用时,稳索必须要收起来。()

    • A、When the derrick is stopped, the guy must be stowed.
    • B、When the derrick is stopped, the guy must be topped.
    • C、When the derrick is stopped, the guy must be lowered.
    • D、When the guy is stopped, the derrick must be stowed.

    正确答案:A

  • 第17题:

    When the order “Let go the anchor” is received ,you should ().

    • A、release the brake
    • B、hoist the anchor ball
    • C、turn the windlass over slowly
    • D、A and B

    正确答案:A

  • 第18题:

    单选题
    Before letting the anchor go,you should check that the().
    A

    chain is clear

    B

    anchor is clear of obstructions

    C

    wildcat is disengaged

    D

    All of the above


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    Release the ()(制动器)when letting go the anchor.
    A

    stopper

    B

    brake

    C

    locker

    D

    derrick


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    When the derrick is stopped, the guy must be().
    A

    take in

    B

    slacked off

    C

    stowed

    D

    taken


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    In securing a towing cable,consideration must be given to letting go in an emergency. The possible whip of towlines when released can be overcome by().
    A

    increasing the shaft RPM prior to release

    B

    using a pelican hook for quick release

    C

    using preventers

    D

    using a short chain for the lead through the stern chock


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    An on-load release system on a survival craft means the cable can be released().
    A

    only when the load is taken off the cable

    B

    only when there is a load on the cable

    C

    only when activated by the controls at the lowering station

    D

    at any time


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    把吊杆甩向码头。()
    A

    Please swing the derrick to wharf side.

    B

    Just go down the derrick , please.

    C

    Just a moment , please.

    D

    Please swing the derrick to inboard.


    正确答案: A
    解析: 暂无解析