Formal written communication is mandated for which of the following?
A scope changes not part of the original project
B taking exception to a specification
C procurement of raw materials
D All of the above.
E A and B only
第1题:
Which of the following would most likely increase the accuracy of estimating the project cost?
A . Pricing out the work at lower levels in the work breakdown structure.
B . Using historical data.
C . Talking to people who have worked on similar projects.
D . All of the above.
E . A and C only.
第2题:
Which of the following areas are addressed in risk identification:
A environmental
B technical
C legal
D All of the above.
E A and B only
第3题:
Which of the following is equivalent to a lump sum contract:
A fixed price contract
B price fixing contract
C purchase order
D All of the above.
E B and C only
第4题:
Which of the following are part of the purchasing cycle:
A define need
B prepare and issue purchase order
C inspect incoming goods
D All of the above.
E A and B only
第5题:
132 Which of the following is an element of procurement management:
A. inspection
B. purchasing
C. estimating
D. expediting
E. A, B and D only
第6题:
42 In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.
A. unit price
B. cost plus incentive fee
C. cost plus fixed fee
D. firm fixed price
E.B and D only
第7题:
76 Formal written correspondence is mandated in which of the following situations:
A. Product undergoes casual in-house testing
B. Client requests additional work not covered under contract
C. Project manager calls a meeting
D. B and C only
E. None of the above
第8题:
146 Which of the following are included as part of a scope statement?
A. Project justification
B. Project deliverables
C. Project objectives
D. All of the above
E. B and C
第9题:
● Configuration (baseline) control monitors performance against the
A scope baseline
B original schedule
C original budget
D All of the above.
E None of the above.
第10题:
● The scope baseline once established and approved, is used:
A as the basis for making future decisions.
B to accomplish verification measures.
C to evaluate potential changes.
D All of the above.
E A and C only.
第11题:
When one connection to a host fails in a full mesh network, which of the following is true?()
第12题:
A system administrator has backed up the datavg volume group using the savevg command. There are several raw logical volumes and some unmounted jfs filesystems in datavg. Which of the following statements is true about this backup?()
第13题:
Formal written correspondence is mandated in which of the following situations:
A Product undergoes casual in-house testing
B Client requests additional work not covered under contract
C Project manager calls a meeting
D B and C only
E None of the above
第14题:
In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.
A unit price
B cost plus incentive fee
C cost plus fixed fee
D firm fixed price
E B and D only
第15题:
Which of the following is an element of procurement management:
A inspection
B purchasing
C estimating
D expediting
E A, B and D only
第16题:
116 Which of the following are part of the purchasing cycle:
A. define need
B. prepare and issue purchase order
C. inspect incoming goods
D. All of the above.
E. A and B only
第17题:
Which of the following is an element of procurement management:
A. inspection
B. purchasing
C. estimating
D. expediting
E. A, B and D only
第18题:
177 Formal written communication is mandated for which of the following?
A. scope changes not part of the original project
B. taking exception to a specification
C. procurement of raw materials
D. All of the above.
E. A and B only
第19题:
88 The scope statement provides
A. A basis for future decisions about a project.
B. A baseline to accomplish verification measures.
C. A baseline to evaluate potential scope changes.
D. All of the above
E. B and C only
第20题:
● Which of the following are included as part of a scope statement?
A Project justification
B Project deliverables
C Project objectives
D All of the above
E B and C
第21题:
● The scope management provides:
A A basis for future decisions about the project.
B A baseline to accomplish verification measures.
C A baseline to evaluate potential scope changes.
D All of the above.
E B and C only.
第22题:
第23题:
Which of the following defines memory interleaving?()