Which of the following are included as part of a scope statement?
A.Project justification
B.Project deliverables
C.Project objectives
D.All of the above
E.B and C
第1题:
Formal written communication is mandated for which of the following?
A scope changes not part of the original project
B taking exception to a specification
C procurement of raw materials
D All of the above.
E A and B only
第2题:
177 Formal written communication is mandated for which of the following?
A. scope changes not part of the original project
B. taking exception to a specification
C. procurement of raw materials
D. All of the above.
E. A and B only
第3题:
140 In which of the following scope management processes are subject matter experts used? A. Initiation
B. Scope planning
C. Scope Definition
D. Scope change control
E. Scope verification
第4题:
144 Which of the following is not a scope management process?
A. Initiation
B. Scope planning
C. Scope Definition
D. Scope change control
E. Scope verification
第5题:
● Which of the following are included as part of a scope statement?
A Project justification
B Project deliverables
C Project objectives
D All of the above
E B and C
第6题:
White box testing of software testing is a test for software structurE.Which of the following item should not be included in the content of white box?
A.boundary value analysis
B.statement testing
C.branch testing
D.path testing
第7题:
The inputs of developing project management plan do not include(72). A.project charter B.stakeholder management strategy C.project scope statement D.outputs from planning processes
第8题:
White box testing of software testing is a test for software structure. Which of the following item should not be included in the content of white box?(75).
A.boundary value analysis
B.statement testing
C.branch testing
D.path testing
第9题:
第10题:
第11题:
第12题:
第13题:
160 Which of the following is not an input to quality planning?
A. scope statement.
B. regulations.
C. work results.
D. standards.
E. quality policy
第14题:
42 Which of the following is not an input to quality planning?
A. scope statement.
B. regulations.
C. work results.
D. standards.
E. quality policy.
第15题:
143 In which of the following scope management processes is the scope management plan prepared?
A. Initiation
B. Scope planning
C. Scope Definition
D. Scope change control
E. Scope verification
第16题:
146 Which of the following are included as part of a scope statement?
A. Project justification
B. Project deliverables
C. Project objectives
D. All of the above
E. B and C
第17题:
●Where box testing of software testing is a test for software structure.Which of the following item should noe be included ing the content of white box? (75) .
(75) A.boundary value analysis
B.statement testing
C.branch testing
D.path testing
第18题:
The Develop Project Management Plan Process includes the actions necessary to define,prepare,integrate,and coordinate all constituent plans into a(75). A.Project Scope Statement B.Project Management Plan C.Forecasts D.Project Charter
第19题:
Which of the following is not a part of reports?
A: catalogue
B: title
C: conclusion
D: methodology
第20题:
● Which of the following Project Scope Management processes involves subdividing the major project deliverables into smaller, more manageable components? (74)
(74)
A. Scope Planning
B. Scope Verification
C. Scope Change Control
D. Scope Definition
第21题: