143 Quality attributesA. are used to determine how effectively the organization accomplishes its goalsB. can be objective or subjective in natureC. are specific quality characteristics for which a product is designed, built, and tested.D. A and B.E. B and

题目

143 Quality attributes

A. are used to determine how effectively the organization accomplishes its goals

B. can be objective or subjective in nature

C. are specific quality characteristics for which a product is designed, built, and tested.

D. A and B.

E. B and C


相似考题
更多“143 Quality attributesA. are used to determine how effectively the organization accomplishes its goalsB. can be objective or subjective in natureC. are specific quality characteristics for which a product is designed, built, and tested.D. A and B.E. B and”相关问题
  • 第1题:

    ● Performing (74) involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

    (74)

    A. quality planning

    B. quality assurance

    C. quality performance

    D. quality control


    正确答案:D

  • 第2题:

    The Relaxacisor is mentioned as_______.

    A. a product which was designed to produce electricity

    B. a product whose distributor was involved in a legal case

    C. a successful advertisement of a beauty product

    D. an example of a quality beauty product


    正确答案:B

  • 第3题:

    175 Quality assurance

    A. refers to the prevention of product defects

    B. is an auditing function that provides feedback to the project team and client about the quality of output being produced.

    C. is the technical process that include the construction of control charts which specify acceptability limits for conforming output.

    D. A and B.

    E. B and C


    正确答案:B

  • 第4题:

    172 Variables quality data are:

    A. quantitative or qualitative data

    B. quality data for which the product or service is designed and built

    C. reflect measurements on a continuous scale of a characteristic of the produce or service

    D. Indicate management's understanding of the concept of variability

    E. B and C only


    正确答案:E

  • 第5题:

    98 Which of the following statements about the cost of quality are true?

    A. the cost of quality is the expense of nonconformance to requirements and specifications.

    B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.

    C. quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D. A and B.

    E. A and C


    正确答案:A

  • 第6题:

    ● Project Quality Management must address the management of the projecand the (72) of the project. While Project Quality Management applies to alprojects, regardless of the nature of their product, product quality measureand techniques are specific to the particular type of product produced by thproject.

    A.performance

    B.process

    C.product

    D.object


    正确答案:C

  • 第7题:

    Project Quality Management must address the management of the project and the ()of the project.While Project Quality Management applies to all projects, regardless of the nature of their product,product quality measures and techniques are specific to the particular type of product produced by the project.()A.performance B.process C.product D.object


    正确答案:C

    项目质量管理必需专注于对项目和项目产品的管理。当所有的项目在运用项目质量管理时,无论项目产品的本质如何,都要依据项目所产生产品的类型明确产品质量的度量和技术。

  • 第8题:

    Quality management ensures that an organization , product or service is ( )。

    A. guaranteed

    B.sustain

    C.good

    D.consistent


    正确答案:D

  • 第9题:

    Project Quality Management must address the management of the project and the(72)of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.

    A.performance

    B.process

    C.product

    D.object


    正确答案:C
    解析:项目质量管理必需专注于对项目和项目产品的管理。当所有的项目在运用项目质量管理时,无论项目产品的本质如何,都要依据项目所产生产品的类型明确产品质量的度量和技术。

  • 第10题:

    Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance. () is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.

    A.Cost-Benefit
    B.Control charts
    C.Quality function deployment
    D.Cost of quality analysis

    答案:D
    解析:
    质量分析成本(Cost of quality analysis)是对产品或服务进行需求一致性分析所产生的成本;成本效益分析(Cost-Benefit analysis)是通过比较项目的全部成本和效益来评估项目价值的一种方法;控制图(Control charts )是项目质量控制方法;质量功能展开(Quality function deployment)是把顾客或市场的要求转化为设计要求、零部件特性、工艺要求、生产要求的多层次演绎分析方法。因此选D。

  • 第11题:

    The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()

    • A、executedin
    • B、inspectedin
    • C、check-in
    • D、look-in

    正确答案:B

  • 第12题:

    单选题
    The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()
    A

    executedin

    B

    inspectedin

    C

    check-in

    D

    look-in


    正确答案: C
    解析: 该题的关键词为"planned、designed、built in",其关键的语句结构为"quality(主语)is planned,designed and built in,not()(谓语)",含义为"质量是通过计划、设计、制造而得到的,不是什么",易知此处应该选择与计划、设计、制造方式相反的观点,结合四个选项,CD首先可以排除,因为从形式上应该选择过去分词形式。选项A的含义与built in相似,排除法可以得到选项B,其实这句话是质量管理中一个非常著名的说法,原文可译为:项目组成员应该知道现代质量管理的一个基本原则,即质量是通过计划、设计和制造得到的,而不是通过事后检查得到。

  • 第13题:

    89 Cost of quality is:

    A. associated with non-conformance to specifications and requirements.

    B. primarily caused by poor workmanship of workers who are building or manufacturing the product. C. used to determine whether a quality management program is suitable for a given project. D. negligible for most large projects.

    E. A and B


    正确答案:A

  • 第14题:

    16 Which of the following statements about the cost of quality are true?

    A. the cost of quality is the expense of nonconformance to requirements and specifications.

    B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product. C. quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D. A and B.

    E. A and C


    正确答案:A

  • 第15题:

    164 Attributes quality data are:

    A. quantitative or qualitative data

    B. quality data for which the products or services is designed and built.

    C. reflect measurements on a continuous scale of a characteristic of the product or service

    D. indicate management's understanding of the concept of variability

    E. A and B only


    正确答案:E

  • 第16题:

    25 Quality attributes

    A. are used to determine how effectively the organization accomplishes its goals

    B. can be objective or subjective in nature

    C. are specific quality characteristics for which a product is designed, built, and tested.

    D. A and B.

    E. B and C


    正确答案:E

  • 第17题:

    54 Variables quality data are:

    A. quantitative or qualitative data

    B. quality data for which the product or service is designed and built

    C. reflect measurements on a continuous scale of a characteristic of the produce or service.

    D. Indicate management's understanding of the concept of variability

    E. B and C only


    正确答案:E

  • 第18题:

    Performing( )involves monitoring specific project results to determine ifthey comply with relevant quality standards and identifying ways to eliminate causes ofunsatisfactory results。 A.quality planning B.quality assurance C.quality performance D.quality control


    正确答案:D
    执行质量控制(quality control)指监控具体的项目结果,确定其是否符合相关的质量标准,并判断如何杜绝造成不合格结果的根源。

  • 第19题:

    Performing(74)involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

    A.quality planning

    B.quality assurance

    C.quality performance

    D.quality control


    正确答案:D
    解析:执行质量控制指监控具体的项目结果,确定其是否符合相关的质量标准,并判断如何杜绝造成不合格结果的根源。

  • 第20题:

    Quality management ensures that an organization,product or service is (1).It has four main components:quality planning,quality assurance,quality control and quality (2).

    A.guaranteed

    B.sustain

    C.good

    D.consistent@@@SXB@@@A.improvement

    B.change

    C.spiral

    D.evolution


    正确答案:D,A

  • 第21题:

    Quality?mangement ensures that an organization,product or service is consitent.It has four main components;quality planing,quality assurance( )and quatily improvenment.

    A.quality obiective
    B.quality policy
    C.quality control
    D.quality system

    答案:C
    解析:

  • 第22题:

    Performing()involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.

    • A、qualityplanning
    • B、qualityassurance
    • C、qualityperformance
    • D、quality control

    正确答案:D

  • 第23题:

    单选题
    You can trust our product as we have ______ control over its quality.
    A

    strict

    B

    limited

    C

    little

    D

    natural


    正确答案: B
    解析:
    句意:你可以信任我们的产品,我们对质量是严格把关的。本题考查形容词词义辨析。根据句意可知,这里指的是对质量的把关十分严格,只有strict“严格的”符合题意。故A项正确。limited有限的,受限制的。little少量的。natural自然的。