更多“24 A comparison of completion status to baseline is referred to as _____.A. Earned value measurement.B. Percent complete.C. ACWP.D. BCWSE. None of above”相关问题
  • 第1题:

    A budget estimate should give the manager cost data accurate to within:

    A . -5 to +10 percent of actual cost

    B . -25 to +75 percent of actual cost

    C . -30 to +75 percent of actual cost

    D . -10 to +25 percent of actual cost

    E . None of the above


    正确答案:D

  • 第2题:

    The difference between the BCWS and the BCWP is referred to as the:

    A . Schedule variance

    B . Cost variance.

    C . Estimate of completion

    D . Actual cost of the work performed

    E . None of the above


    正确答案:A

  • 第3题:

    A graphical display of accumulated costs and labor hours for both budgeted and actual costs, plotted against time, is called a(n) _____.

    A . Trend line.

    B . Trend analysis.

    C . S curve.

    D . Percent completion report.

    E . Earned value report.


    正确答案:C

  • 第4题:

    58 A graphical display of accumulated costs and labor hours for both budgeted and actual costs, plotted against time, is called a(n) _____.

    A. Trend line.

    B. Trend analysis.

    C. S curve.

    D. Percent completion report.

    E. Earned value report


    正确答案:C

  • 第5题:

    23 Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the:

    A. Baseline costs

    B Budgeted costs.

    C. Estimates upon completion costs

    D. Scheduled costs

    E. None of the above


    正确答案:A

  • 第6题:

    105 A budget estimate should give the manager cost data accurate to within:

    A. -5 to +10 percent of actual cost

    B. -25 to +75 percent of actual cost

    C. -30 to +75 percent of actual cost

    D. -10 to +25 percent of actual cost

    E. None of the above


    正确答案:D

  • 第7题:

    100 The difference between the BCWS and the BCWP is referred to as the:

    A. Schedule variance

    B. Cost variance.

    C. Estimate of completion

    D. Actual cost of the work performed

    E. None of the above


    正确答案:A

  • 第8题:

    24 Activities with zero time duration are referred to as:

    A. Critical path activites.

    B. Noncritical path activities.

    C. Slack time activities.

    D. Dummies

    E. None of above


    正确答案:D

  • 第9题:

    48 The ability to achieve cost savings is inversely proportional to _____.

    A. the earned value achieved to date

    B. the estimated costs to complete

    C. empowerment to the P.M.

    D. productivity

    E. None of the above


    正确答案:A

  • 第10题:

    ● Configuration (baseline) control monitors performance against the

    A scope baseline

    B original schedule

    C original budget

    D All of the above.

    E None of the above.


    正确答案:A

  • 第11题:

    Which statement is true about the plan being loaded into the SQL baseline by the above command?()

    A. It is loaded with the FIXED status.

    B. It is loaded with the ACCEPTED status.

    C. It is not loaded with the ENABLED status.

    D.It is not loaded with the ACCEPTED status.


    参考答案:B

  • 第12题:

    Earned value management(EVM)integrates the scope baseline with the()baseline,along with schedule baseline,to form the performance,which helps the project management team assess and measure project performance and progress.

    A.qulity
    B.risk
    C.change
    D.cost

    答案:D
    解析:
    本题翻译:
    挣值管理(EVM)将范围基线与()基线以及进度基线结合起来,形成绩效基线,帮助项目管理团队评估和衡量项目绩效和进度。
    A.质量B.风险C.变更D.成本
    其实此题只需要知道两个英文词就可以做出题,第一个就是EVM,挣值管理,属于成本管理里面用到的工具与技术,那此题答案就出来了,成本的英文就是D选项。所以英文题不需要会翻译所有的单词,记住题眼也是可以答题的,所以日常复习中,背几个英文单词,也很有帮助。
    题干多读几遍,有个印象,也是一个知识点。

  • 第13题:

    Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the:

    A . Baseline costs

    B . Budgeted costs.

    C . Estimates upon completion costs

    D . Scheduled costs

    E . None of the above


    正确答案:A

  • 第14题:

    Using the situation stated in the Special window, a comparison of the cost schedule of August as compared to July shows that the magnitude ($ value) of the variance has _____ and the percentage change has _____.

    A . Become worse, become worse

    B . Become worse, improved

    C . Improved, increased

    D . Improved, become worse

    E . None of the above are correct


    正确答案:E

  • 第15题:

    142 Activities with zero time duration are referred to as:

    A. Critical path activites.

    B. Noncritical path activities.

    C. Slack time activities.

    D. Dummies

    E. None of above


    正确答案:D

  • 第16题:

    18 The difference between the BCWS and the BCWP is referred to as the:

    A. Schedule variance

    B Cost variance.

    C. Estimate of completion

    D. Actual cost of the work performed

    E. None of the above


    正确答案:A

  • 第17题:

    46 Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called: A. Variance reports

    B. S curves

    C. Trend analysis

    D. Earned value reporting

    E. Baseline control


    正确答案:B

  • 第18题:

    183 Configuration (baseline) control monitors performance against the

    A. scope baseline

    B. original schedule

    C. original budget

    D. All of the above.

    E. None of the above


    正确答案:A

  • 第19题:

    105 Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the:

    A. Baseline costs

    B. Budgeted costs.

    C. Estimates upon completion costs

    D. Scheduled costs

    E. None of the above


    正确答案:A

  • 第20题:

    106 A comparison of completion status to baseline is referred to as _____.

    A. Earned value measurement.

    B. Percent complete.

    C. ACWP.

    D. BCWS

    E. None of above


    正确答案:A

  • 第21题:

    106 Using the situation stated in the Special window, a comparison of the cost schedule of August as compared to July shows that the magnitude ($ value) of the variance has _____ and the percentage change has _____.

    A. Become worse, become worse

    B. Become worse, improved

    C. Improved, increased

    D. Improved, become worse

    E. None of the above are correct


    正确答案:E

  • 第22题:

    ● Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called:

    A Variance reports

    B S curves

    C Trend analysis

    D Earned value reporting

    E Baseline control


    正确答案:B

  • 第23题:

    Upon completion of fueling a gasoline driven vessel it is necessary to ______.

    A.keep ports,doors,windows,and hatches closed

    B.start engines immediately

    C.ventilate before starting engine

    D.None of the above


    正确答案:C