195 Using the possible profit and loss outcomes shown in the Special window, find the expected profit (loss)
A. ($1000)
B. $1000
C. $2000
D. $1200
E. None of the above
第1题:
Using the situation stated in the Special window, which WBS element is behind schedule but under budget?
A . Element P
B . Element Q
C . Element R
D . Element S
E None of the above.
第2题:
Pure Risk differs from Business Risks because Pure Risk's _____ .
A include chances of both profit or loss associated with the business.
B include chances of loss and no chances for profit associated with the business.
C must incur personal loss with business liability.
D must incur business liability associated with loss of pure profit.
E B and C
第3题:
Using the possible loss outcomes shown in the Special window, find the expected (loss)
A ¥0
B ¥-1,300
C ¥-2,000
D ¥-3,000
E None of the above
第4题:
A contractor estimates that a project has a 0.5 probability of $200,000 profit and 0.3 probability of $50,000 loss. The expected monetary value of this project is:
A ¥200,000
B ¥150,000
C ¥85,000
D ¥50,000
E None of the above.
第5题:
100 Pure Risk differs from Business Risks because Pure Risk's _____ .
A. include chances of both profit or loss associated with the business.
B. include chances of loss and no chances for profit associated with the business.
C. must incur personal loss with business liability.
D. must incur business liability associated with loss of pure profit.
E. B and C
第6题:
102 Using the situation stated in the Special window, which WBS element has a favorable cost variance of $150?
A. Element P
B. Element Q
C. Element R
D. Element S
E. None of the above
第7题:
115 Using the possible loss outcomes shown in the Special window, find the expected (loss)
A. $0
B. ($1300)
C. ($2000)
D. ($ 3000)
E. None of the above
第8题:
124 Using the situation stated in the Special window, what is the total variable costs for producing one widget?
A. $1,020
B. $1,010
C. $1,015
D. $20.00
E. None of the above
第9题:
132 Using the situation stated in the Special window, what is the cost performance index for Case #9?
A. 1.10
B. 1.91
C. 0.83
D. 1.20
E. None of the above
第10题:
● Using the WBS shown in the Special window, a typical work package would be:
A Software development
B Systems design
C Coding
D A, B, and C
E None of the above.
第11题:
● () is most closely associated with business risk. ()A. profit and loss B. personnel turnoverC. workmen’s compensation D. liability insurance
第12题:
happy; loss
sorry; fortune
pleased; profit
sad; benefit
第13题:
Using the situation stated in the Special window, what is the cost performance index for Case #9?
A . 1.1
B . 1.91
C . 0.83
D . 1.2
E . None of the above
第14题:
Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:
A 1.4
B 0.8
C 0.2
D 0.12
E None of the above
第15题:
Using the possible profit and loss outcomes shown in the Special window, find the expected profit (loss)
A ¥-1,000
B ¥1,000
C ¥2,000
D ¥1,200
E None of the above
第16题:
52 A contractor estimates that a project has a 0.5 probability of $200,000 profit and 0.3 probability of $50,000 loss. The expected monetary value of this project is:
A. $200,000
B. $150,000
C. $85,000
D. $50,000
E. None of the above
第17题:
101 Using the situation stated in the Special window, which WBS element is behind schedule but under budget?
A. Element P
B. Element Q
C. Element R
D. Element S
E. None of the above
第18题:
113 Using the possible profit and loss outcomes shown in the Special window, find the expected profit (loss)
A. ($1000)
B. $1000
C. $2000
D. $1200
E. None of the above
第19题:
121 Using the WBS in the Special window, an instance of a work package is:
A. Build house
B. Excavate
C. Prepare Foundation
D. B and C
E. None of the above
第20题:
129 Using the situation stated in the Special window, what is the cost variance for Case #9?
A. -$1000
B. 1000
C. -2000
D. 2000
E. 0
第21题:
133 Using the WBS shown in the Special window, a typical work package would be:
A. Software development
B. Systems design
C. Coding
D. A, B, and C
E. None of the above
第22题:
● Using the WBS in the Special window, an instance of a work package is:
A Build house
B Excavate
C Prepare Foundation
D B and C
E None of the above
第23题:
(ii) Using the previous overhead allocation basis (as per note 4), calculate the budgeted profit/(loss)
attributable to each type of service for the year ending 31 December 2006 and comment on the results
obtained using the previous and revised methods of overhead allocation. (5 marks)