The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result of this analysis and dialog is an(74)set of requiremen

题目

The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result of this analysis and dialog is an(74)set of requirements.

A.agreed-to

B.agree-to

C.agree-to-do

D.agree-with


相似考题
更多“The receiving activities conduct analyses of the requirements with the requirements provid ”相关问题
  • 第1题:

    ● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

    (73)

    A. Quality assurance (QA)

    B. Quality planning

    C. Quality control (QC)

    D. Quality costs


    正确答案:A

  • 第2题:

    ● The receiving activities conduct analyses of the requirements with therequirements provider to ensure that a compatible, shared understanding isreached on the meaning of the requirements. The result of this analysis and dialogis an (74) set of requirements.

    (74)

    A. agreed-to

    B. agree-to

    C. agree-to-do

    D. agree-with


    正确答案:A

  • 第3题:

    ● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs


    正确答案:A
    质量保证是一项有计划的、系统的质量活动,以确保项目的所有过程达到并符合要求。

  • 第4题:

    ● In requirements engineering,requirements elicitation is the practice of collecting the requirements of a system from users,customers and other stakeholder. In the following practices,__(73)__is rarely used in requirements elicitation.

    (73)A.brain storming B.interview

    C.questionnaire D.Monte Carlo analysis


    正确答案:D
    在需求工程,需求获取是从用户,客户和其他干系人收集一个系统的需求的做法。下列做法中,蒙特卡罗分析是很少用于需求获取。

  • 第5题:

    Is requirements engineering,requirements elietation is the practiceof collecting the requirements of a system frce users,customers and other stakeholders. Is the following practices ()is rarely used in requirements elicltation

    A.brain storning

    B.interview

    C.questionnaire

    D.monte carlo analysis


    正确答案:D

  • 第6题:

    The project maintains a current and approved set of requirements over the life of the project by doing the following: .(73)all changes to the requirements . Maintaining the relationships among the requirements, the project plans, and the work products . ……

    A.Monitoring

    B.Managing

    C.Gathering

    D.Reducing


    正确答案:B
    解析:在项目的生命周期里,项目通过如下措施维持一个最新的、经批准的需求集合:
      . 管理对需求的变更。
      . 维持需求、项目计划和工作产品之间的关联。
      . ……

  • 第7题:

    ()is the application of planned,systematic.quality activities to ensure that the project will employ all processes to meet requirements.

    A.Quality assurance
    B.Quality planning
    C.Quality control
    D.Quality cost

    答案:A
    解析:
    翻译:
    ()是计划的应用于系统的质量活动,确保该项目将采用所有流程来满足需求。
    A.质量保证B..质量计划C.质量控制D..质量成本

  • 第8题:

    ( )is the process of determining,documenting ,and managing stakeholder needs and requirements to meet project objectives.

    A.Collecting requirements
    B.Defining requirements
    C.Creating WBS
    D.Requirements analysis

    答案:A
    解析:
    翻译:收集需求是一个确定、记录、管理干系人需求以便满足项目需求的过程。A.收集需求 B.定义需求C.创建WBS D.需求分析

  • 第9题:

    Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()

    • A、 identifying and assessing customer business requirements
    • B、 documenting and categorizing customer business requirements in terms of performance, availability, capacity and security
    • C、 producing a documented technology strategy
    • D、 creating a bill of materials
    • E、 presenting documented business requirements to a customer and having the customer validate them
    • F、 completing a site survey

    正确答案:A,B,E

  • 第10题:

    A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()

    • A、verify configuration
    • B、conduct pre-install TDA
    • C、complete physical planning
    • D、verify the solution meets requirements

    正确答案:B

  • 第11题:

    多选题
    Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()
    A

    identifying and assessing customer business requirements

    B

    documenting and categorizing customer business requirements in terms of performance, availability, capacity and security

    C

    producing a documented technology strategy

    D

    creating a bill of materials

    E

    presenting documented business requirements to a customer and having the customer validate them

    F

    completing a site survey


    正确答案: F,D
    解析: 暂无解析

  • 第12题:

    单选题
    What is the primary objective of the plan phase()
    A

    Assess the existing environments to determine if it can support the proposed system.

    B

    Identify the activities for installing and configuring the equipment at the customer sites.

    C

    Gather high-level solution requirements, and understand the customer business needs an the opportunity.

    D

    Prepare the activities for day-to-day support, management, and monitoring of the newly implemented system.


    正确答案: A
    解析: 暂无解析

  • 第13题:

    ● The project maintains a current and approved set of requirements ovethe life of the project by doing the following:

    · (73) all changes to the requirements

    · Maintaining the relationships among the requirements, the project plansand the work products

    · ……

    (73)

    A. Monitoring

    B. Managing

    C. Gathering

    D. Reducin


    正确答案:B

  • 第14题:

    ______is the application of planned,systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

    A.euality assurance(QA)

    B.Quality planning

    C.Quality control(QC)

    D.Quality costs


    正确答案:A
    解析:质量计划是质量管理的一部分,致力于制定质量目标,并规定必要的运行过程和相关资源以实现项目质量目标。
      质量控制就是项目团队的管理人员采取有效措施,监督项目的具体实施结果,判断它们是否符合项目有关的质量标准,并消除产生不良结果原因的途径。
      质量成本是指为满足质量要求所付出的主要成本。
      质量保证是通过对质量计划的系统实施,确保项目需要的相关过程达到预期要求的质量活动。选项A是质量保证(QA),选项B是质量计划,选项C是质量控制(QC),选项D是质量成本。因此应选择A。

  • 第15题:

    The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the sofrware must perform. and each(72)that it must meet. The starting point is usually a set of high-level requirements from the(73)that describe the project or problem.In either case, the requirements definition team formulates an overall concept for the system and then defines(74)showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR).Following the SCR, the team derives(75)requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.

    A.function

    B.definition

    C.specification

    D.statement


    正确答案:C
    解析:需求定义阶段的作用就是为软件产品产生一个清晰的、完整的、一致的、可测试的技术需求规格说明。在需求定义阶段,需求定义团队通过迭代过程把有关节系统需求的宽泛的陈述扩展成系列化统必须实现的各个功能的、完整而详细的规格说明,以及系列化统应该满足的各种准则。这个过程的起点通常是由用户提供的描述项目或问题的一组高级需求。在任何情况下,需求定义团队应该阐明与系统有关的整体概念,并且设定一种能够显示系统如何运作的情景,发布有关系统和运行的概念文档,并进行系统概念的评审(SCR)。在SCR之后,团队应该根据高级需求和系统运行概念导出详细的系统需求。通过结构化的或面向对象的分析技术,团队可以规范系统功能,说明满足每一细节需求的算法。

  • 第16题:

    A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()

    A. verify configuration

    B. conduct pre-install TDA

    C. complete physical planning

    D. verify the solution meets requirements


    参考答案:B

  • 第17题:

    A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called( ). Requirements written from the developer&39;s perspective and describe how the system will be implemented are called( ). Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in which the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is( ). The requirement that the system should be able to work on any Web browser belongs to( ). That customer personal information is protected in compliance with the Data Protection Act is a requirement of( ).

    A.operational requirements B.business requirements C.technical requirements D.system requirements A.operational requirements B.business requirements C.technical requirements D.system requirements A.a functional requirements B.a technical requirements C.an operational requirements D.a service requirements A.functional requirements B.technical requirements C.operational requirements D.information requirements A.system constraint B.system performance C.secrity and control D.cultural and political


    正确答案:B,D,A,C,D

  • 第18题:

    ()is the application of planned,systematic quality activities to ensure thatthe project will employ all processes needed to meet requirements.

    A.Quality assurance(QA)
    B.Quality planning
    C.Quality control(QC)
    D.Quality costs

    答案:A
    解析:
    质量计划是质量管理的一部分,致力于制定质量目标,并规定必要的运行过程和相关资源以实现项目质量目标。质量控制就是项目团队的管理人员采取有效措施,监督项目的具体实施结果,判断它们是否符合项目有关的质量标准,并消除产生不良结果原因的途径。质量成本是指为满足质量要求所付出的主要成本。质量保证是通过对质量计划的系统实施,确保项目需要的相关过程达到预期要求的质量活动。选项 A 是质量保证(QA),选项B 是质量计划,选项 C 是质量控制(QC),选项 D 是质量成本。因此应选择 A。

  • 第19题:

    ( )is the process of determining,documenting ,and managing stakeholder needs and requirements to meet project objectives.

    A.Collecting requirements
    B.Defining requirements
    C.Creating WBS
    D.Requirements analysis

    答案:A
    解析:
    翻译:收集需求是一个确定、记录、管理干系人需求以便满足项目需求的过程。A.收集需求 B.定义需求C.创建WBS D.需求分析

  • 第20题:

    The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.

    • A、agreed-to
    • B、agree-to
    • C、agree-to-do
    • D、agree-with

    正确答案:A

  • 第21题:

    In requirements engineering, requirements elicitation is the practice of collecting the requirements of a system from users, customers and other stakeholders. In the following practices, ( ) is rarely used in requirements elicitation.

    • A、brain storming
    • B、interview
    • C、questionnaire
    • D、Monte Carlo analysis

    正确答案:D

  • 第22题:

    单选题
    A customer wants to install a pSeries system into an OEM rack.  What critical information is provided in the Site and Hardware Planning Information manual?()
    A

    System dimensions and weight, system power and cooling requirements, and list of supported OEM racks

    B

    System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks

    C

    System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks

    D

    System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    What is the key objective of the plan phase?()
    A

    Identify the activities involved in installing and configuring equipment at a customer’s site or sites

    B

    Describe the day-to-day activities required to support, manage, and monitor a newly implemented system

    C

    Access current network readiness, site readiness, and operational readiness in preparation for designing a solution proposal

    D

    Gain an understanding of high-level business and technical requirements


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.
    A

    agreed-to

    B

    agree-to

    C

    agree-to-do

    D

    agree-with


    正确答案: C
    解析: 该题的关键词为"compatible, shared understanding",其主要的语句结构为"The result of this analysis and dialog(主语)is(谓语)an____set of requirements(表语)",含义为"分析和讨论对应的结果为一组什么的需求",根据题意,应该是达成一致的需求集,所以从选项中识别短语,判断短语的正确形式,此处应该选择agreed-t0。agree with表示同意某人,agree to表示同意某事,此处的"同意"作为形容词性质出现,所以应该使用agreed to形式,其他都不对。