第1题:
● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.
(73)
A. Quality assurance (QA)
B. Quality planning
C. Quality control (QC)
D. Quality costs
第2题:
● The receiving activities conduct analyses of the requirements with therequirements provider to ensure that a compatible, shared understanding isreached on the meaning of the requirements. The result of this analysis and dialogis an (74) set of requirements.
(74)
A. agreed-to
B. agree-to
C. agree-to-do
D. agree-with
第3题:
● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs
第4题:
● In requirements engineering,requirements elicitation is the practice of collecting the requirements of a system from users,customers and other stakeholder. In the following practices,__(73)__is rarely used in requirements elicitation.
(73)A.brain storming B.interview
C.questionnaire D.Monte Carlo analysis
第5题:
Is requirements engineering,requirements elietation is the practiceof collecting the requirements of a system frce users,customers and other stakeholders. Is the following practices ()is rarely used in requirements elicltation
A.brain storning
B.interview
C.questionnaire
D.monte carlo analysis
第6题:
The project maintains a current and approved set of requirements over the life of the project by doing the following: .(73)all changes to the requirements . Maintaining the relationships among the requirements, the project plans, and the work products . ……
A.Monitoring
B.Managing
C.Gathering
D.Reducing
第7题:
第8题:
第9题:
Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()
第10题:
A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()
第11题:
identifying and assessing customer business requirements
documenting and categorizing customer business requirements in terms of performance, availability, capacity and security
producing a documented technology strategy
creating a bill of materials
presenting documented business requirements to a customer and having the customer validate them
completing a site survey
第12题:
Assess the existing environments to determine if it can support the proposed system.
Identify the activities for installing and configuring the equipment at the customer sites.
Gather high-level solution requirements, and understand the customer business needs an the opportunity.
Prepare the activities for day-to-day support, management, and monitoring of the newly implemented system.
第13题:
● The project maintains a current and approved set of requirements ovethe life of the project by doing the following:
· (73) all changes to the requirements
· Maintaining the relationships among the requirements, the project plansand the work products
· ……
(73)
A. Monitoring
B. Managing
C. Gathering
D. Reducin
第14题:
______is the application of planned,systematic quality activities to ensure that the project will employ all processes needed to meet requirements.
A.euality assurance(QA)
B.Quality planning
C.Quality control(QC)
D.Quality costs
第15题:
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an iterative process to expand a broad statement of the system requirements into a complete and detailed specification of each function that the sofrware must perform. and each(72)that it must meet. The starting point is usually a set of high-level requirements from the(73)that describe the project or problem.In either case, the requirements definition team formulates an overall concept for the system and then defines(74)showing how the system will be operated, publishes the system and operations concept document, and conducts a system concept review(SCR).Following the SCR, the team derives(75)requirements for the system from the high level requirements and the system and operations concept. Using structured or object-oriented analysis, the team specifies the software functions and algorithms needed to satisfy each detailed requirement.
A.function
B.definition
C.specification
D.statement
第16题:
A. verify configuration
B. conduct pre-install TDA
C. complete physical planning
D. verify the solution meets requirements
第17题:
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called( ). Requirements written from the developer&39;s perspective and describe how the system will be implemented are called( ). Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in which the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is( ). The requirement that the system should be able to work on any Web browser belongs to( ). That customer personal information is protected in compliance with the Data Protection Act is a requirement of( ).
A.operational requirements B.business requirements C.technical requirements D.system requirements A.operational requirements B.business requirements C.technical requirements D.system requirements A.a functional requirements B.a technical requirements C.an operational requirements D.a service requirements A.functional requirements B.technical requirements C.operational requirements D.information requirements A.system constraint B.system performance C.secrity and control D.cultural and political
第18题:
第19题:
第20题:
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.
第21题:
In requirements engineering, requirements elicitation is the practice of collecting the requirements of a system from users, customers and other stakeholders. In the following practices, ( ) is rarely used in requirements elicitation.
第22题:
System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
第23题:
Identify the activities involved in installing and configuring equipment at a customer’s site or sites
Describe the day-to-day activities required to support, manage, and monitor a newly implemented system
Access current network readiness, site readiness, and operational readiness in preparation for designing a solution proposal
Gain an understanding of high-level business and technical requirements
第24题:
agreed-to
agree-to
agree-to-do
agree-with