Microsoft's COM is a software(1)that allows applications to be built from binary software components. COM is the underlying architecture that forms the foundation for higher-level software services, like those provided by OLE. COM defines a binary standard for function calling between components,a way for components to dynarmically discover the interfaces implemented by other components, and amechanism to identify components and their interfaces uniquely. OLE is a compound(2)standard developed by Microsoft. OLE makes it possible to create(3)with one application and link or embed them in a second application.Embedded objects retain their original format and(4)to the application that created them. Support for OLE is builtinto the Windows and MacOS Operating Systems.A(5)compound document standard developed mainly by Apple and IBM is called OpenDoc. 空白(3)处应选择()
第10题:
An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()
第11题:
AppDomain.CurrentDomain.ShadowCopyFiles
AppDomain.CurrentDomain.CachePath
AppDomain.CurrentDomain.ConfigurationFile
AppDomain.CurrentDomain.Evidence
第12题:
Create a test environment for the new version.
Determine system requirements for the upgrade.
Request bids from other competing vendors in the product space.
Document the upgrade.
第13题:
第14题:
第15题:
第16题:
第17题:
第18题:
第19题:
第20题:
What are three components of Cisco Technical Support Services?()
第21题:
An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()
第22题:
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()
第23题:
Identify necessary operating system updates
Implement the change
Document the change
Schedule system down time