更多“Project success depends primarily on() 。”相关问题
  • 第1题:

    108 The way a project manager sends and receives information depends upon:

    A. How others relate to the project manager

    B. The project manager's level in the organizational hierarchy

    C. the size and nature of the project

    D. the project manager's salary and age

    E. the number of projects going on at one time in the company


    正确答案:A

  • 第2题:

    200 Using the figure in the Special Window, what is the probability of success for Project B?

    A. 0.30

    B. 0.20

    C. 0.35

    D.0.15

    E.0.12


    正确答案:C

  • 第3题:

    ● (74) is primarily concerned with defining and controlling what is and is not included in the project.

    (74)

    A. Project Time Management

    B. Project Cost Management

    C. Project Scope management

    D. Project Communications Management


    正确答案:C

  • 第4题:

    ● ()is primarily concerned with defining and concerning what is and is not included in the project.()A. Project Time ManagementB. Project Cost ManagementC. Project Scope ManagementD. Project Communications Management


    正确答案:C
    项目范围管理定义并关心哪些工作是项目应该做的哪些不是项目应该做的。

  • 第5题:

    The success of the project ____ on the support we get from our friends.

    A、hinges

    B、hints

    C、bars

    D、hinders


    正确答案:A

  • 第6题:

    In all projects,needs must be tempered by schedule,cost and resource constraints.Project success depends primarily on (74)

    A.the quality of the schedule and cost control analysis

    B.customer satisfaction

    C.customer compromise in defining its needs

    D.exceeding customer requirements through gold-plating


    正确答案:B
    所有项目中,客户的要求必须根据进度表、成本和有限的资源进行修改。项目的成功主要取决于:A进度表和成本控制分析的优劣B.客户满意程度C客户在确定要求时的折衷态度D通过漂亮的外包装超额满足客户的要求所以答案选B。

  • 第7题:

    ()includes the processes required to ensure that the project includes all the work required,and only the work required,to compete the project successfully.Managing the project scope is primarily concerned with defining and controlling what is not included in the project.

    A. Create scopE
    B. Project stakeholder management
    C. Project scope management
    D. Project cost management

    答案:C
    解析:

  • 第8题:

    单选题
    A vessel reduces speed without backing. The rate that her speed through the water decreases depends primarily on the().
    A

    vessel's horsepower

    B

    sea state

    C

    number of propellers

    D

    vessel's displacement


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    Success depends______ he efforts of the organization.
    A

    from

    B

    in

    C

    on

    D

    of


    正确答案: A
    解析:
    depend on为固定搭配,表示“取决与;依赖;依靠”,符合句子所要表达的意思,故为正确答案。depend from表示“从…悬挂,从…下垂”。

  • 第10题:

    单选题
    The rate of fuel injection in a diesel engine cylinder depends primarily on ().
    A

    the size of the holes in the fuel nozzle

    B

    timing of the pump

    C

    supply pressure to the pump

    D

    shape of the combustion chamber


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Extreme Programming (XP) is a discipline of sofiware development with (1) of simplicity,communication, feedback and cuurage. Successful software development is a team effort - not just the development team, but the larger team consisting of customer, management and developers. XP is a simple process that brings these people together and helps them to success together. XP is aimed primarily at object-oriented projects using teams of a dozen or fewer programmers in one location. The principles of XP apply to any (2) project that needs to deliver quality software rapidly and flexibly. An XP project needs a (3) customer to provide guidance. Customers, programmers, managers, are all working (4) to build the system that's needed, Customers - those who have software that needs to be developed - will learn simple, effective way to (5) what they need, to be sure that they are getting what they need, and to steer the project to success. 空白(2)处应选择()
    A

    small-sized

    B

    moderately-sized

    C

    large-sized

    D

    huge-sized


    正确答案: A
    解析: 参考译文:极限编程(XP)是一种软件开发方法,其价值观是简单、沟通、反馈和勇气。成功的软件开发是团队努力的结果,这里的团队不仅仅是开发团队,而是包括了客户、管理者和开发者在内的更大的团队。XP是一种将上述人员组织起来并帮助他们取得成功的简单的过程。XP主要针对那些由十几个或更少的在同一地点工作的程序员组成的团队所进行的面向对象的项目。XP原则适用于需要快速且灵活地交付高质量软件的中等规模项目组。一个XP项目需要一个全程参与的客户给予指导。客户、程序员和项目经理协同工作来构建需要的系统。客户,也就是需要软件的人,将学到简单而有效的沟通方法,来确保获得他们所需要的,从而引导项目走向成功。

  • 第12题:

    单选题
    The success of a training program depends on _____.
    A

    the places where the training takes place

    B

    the correct evaluation of the costs and savings of the program

    C

    the performance of the workers and technicians trained in the program

    D

    the training methods and the quality of the training staff


    正确答案: C
    解析:
    第四段第二句“The success of such a program depends not only on the methods used but also on the quality of the staff who do the training.”表明,成功的培训依赖于培训方法和参训员工的素质。

  • 第13题:

    197 Proper implementation of project management will guarantee that:

    A. Budgets will be met.

    B. Schedules will be adhered to. "

    C. Quality/performance will be met.

    D. The project will be a success.

    E. None of the above


    正确答案:E

  • 第14题:

    ● Proper implementation of project management will guarantee that:

    A Budgets will be met.

    B Schedules will be adhered to.

    C Quality/performance will be met.

    D The project will be a success.

    E None of the above.


    正确答案:E

  • 第15题:

    ______is primarily concerned with defining and controlling what is and is not included in the project.

    A.Project Time Management

    B.Project Cost Management

    C.Project Scope management

    D.Project Communications Management


    正确答案:C
    解析:项目范围管理是项目管理(包括时间、成本、沟通)的基础。
      项目范围管理是最先定义和决定项目中包含哪些内容和确定边界的。
      选项A是项目时间管理,选项B是项目成本管理,选项C是项目范围管理,选项D是项目沟通管理,因此应选择C。

  • 第16题:

    (), the success depends on the good marketing.

    A、Strangely

    B、Surprisingly

    C、Ultimately

    D、Oddly


    参考答案:C

  • 第17题:

    ●Extreme Programming (XP) is a discipline of software development with (71) of simplicity, communication,feedback and courage. Successful software development is a team effort-not just the development team, but the larger team consisting of customer, management and developers. XP is a simple process that brings these people together and helps them to succeed together. XP is aimed primarily at object-oriented projects using teams of a dozen or fewer programmers in one location. The principles of XP apply to any (72) project that needs to deliver quality software rapidly and flexibly.

    An XP project needs a (73) customer to provide guidance. Customers, programmers,managers, are all working (74) to build the system that's needed. Customers - those who have software that needs to be developed - willlearn simple, effective ways to (75) what they need, to be sure that they are getting what they need, and to steer the project to success.

    (71)

    A.importance

    B.keys

    C.roles

    D.values


    正确答案:D

  • 第18题:

    ()includes the processes required to ensure that the project includes all the work required,and only the work required,to compete the project successfully.Managing the project scope is primarily concerned with defining and controlling what is not included in the project.

    A:Create scopE
    B:Project stakeholder management
    C:Project scope management
    D:Project cost management

    答案:C
    解析:

  • 第19题:

    ( ) is primarily concerned with defining and controlling what is and is not included in the project.

    A.Project Time Management
    B.Project Cost Management
    C.Project Scope Management
    D.Project Communications Management

    答案:C
    解析:
    项目范围管理是项目管理(包括时间、成本、沟通)的基础。

    项目范围管理是最先定义和决定项目中包含哪些内容和确定边界的。

    选项A是项目时间管理,选项B是项目成本管理,选项C是项目范围管理,选项D是项目沟通管理。因此应选择C。

  • 第20题:

    单选题
    The success of an indirect attack on a fire depends on the().
    A

    size of the fire when initially observed

    B

    complete containment of the fire

    C

    cooling ability of the firefighting agent

    D

    class of the fire


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    If the project is a success, the office ______ more help.
    A

    would hire

    B

    hired

    C

    can hire

    D

    could have hired


    正确答案: A
    解析:
    在真实的条件句中,从句为一般现在时,则主句也可用一般现在时,因此C项符合题意。A、B、D都为虚拟语气。

  • 第22题:

    单选题
    Extreme Programming (XP) is a discipline of sofiware development with (1) of simplicity,communication, feedback and cuurage. Successful software development is a team effort - not just the development team, but the larger team consisting of customer, management and developers. XP is a simple process that brings these people together and helps them to success together. XP is aimed primarily at object-oriented projects using teams of a dozen or fewer programmers in one location. The principles of XP apply to any (2) project that needs to deliver quality software rapidly and flexibly. An XP project needs a (3) customer to provide guidance. Customers, programmers, managers, are all working (4) to build the system that's needed, Customers - those who have software that needs to be developed - will learn simple, effective way to (5) what they need, to be sure that they are getting what they need, and to steer the project to success. 空白(5)处应选择()
    A

    tell

    B

    know

    C

    communicate

    D

    feedback


    正确答案: D
    解析: 参考译文:极限编程(XP)是一种软件开发方法,其价值观是简单、沟通、反馈和勇气。成功的软件开发是团队努力的结果,这里的团队不仅仅是开发团队,而是包括了客户、管理者和开发者在内的更大的团队。XP是一种将上述人员组织起来并帮助他们取得成功的简单的过程。XP主要针对那些由十几个或更少的在同一地点工作的程序员组成的团队所进行的面向对象的项目。XP原则适用于需要快速且灵活地交付高质量软件的中等规模项目组。一个XP项目需要一个全程参与的客户给予指导。客户、程序员和项目经理协同工作来构建需要的系统。客户,也就是需要软件的人,将学到简单而有效的沟通方法,来确保获得他们所需要的,从而引导项目走向成功。

  • 第23题:

    单选题
    The minimum fuel oil delivery pressure required for diesel engine injection depends primarily on the()
    A

    degree of cylinder air turbulence

    B

    firing pressure in the engine

    C

    quality of fuel to be injected

    D

    duration of the ignition delay period


    正确答案: A
    解析: 暂无解析