A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()
A. TCOnow!
B. Disk Magic
C. Batch Magic
D. Capacity Magic
第1题:
A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()
A. 8 drive sets of 300 GB drives
B. 4 drive sets of 300 GB drives
C. 14 drive sets of 146 GB drives
D. 18 drive sets of 146 GB drives
第2题:
The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()
第3题:
A frustrated and angry customer calls in with a system that does not work. Which of the following is the FIRST course of action for a technician to take?()
第4题:
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()
第5题:
A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage. Which of the following arguments can the Sales Specialist present to best position IBM? ()
第6题:
The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()
第7题:
You work as a network Exchange administrator at Company.com.The Company.com network currently consists of a single Active Directory forest containing a single domain named Company.com.The Company.com organization makes use of Microsoft Exchange Server 2010 as their messaging solution.During the course of the business week you receive instruction from Company.com to view the replication status of a mailbox database copy in the organization. What should you do?()
第8题:
and takes less time than it, but produces just as tasty a souffle as the old recipe
that take less time than the old recipe, producing just as tasty a souffle
and takes less time than the old recipe, but produces just as tasty a souffle
also taking less time than the old recipe, but produces just as tasty a souffle
but produces just as tasty a souffle as the old recipe, but takes less time
第9题:
Global Copy
Sync Mirror
Metro Mirror
TPC for Replication
第10题:
Ask another technician who has worked with this computer previously to learn about any other prior issues.
Ask the customer open-ended questions to attempt to narrow down the issue, then repeat the issue to the customer for validation.
Ask the customer close-ended questions to attempt to narrow down the issue while not using technical jargon to avoid overwhelming the customer.
Run preliminary diagnostic tests to narrow down the issue and update the status of the trouble ticket then ask the customer about any changes they have made to the computer.
第11题:
the time it takes for a Layer 3 switch or a router to switch a packet from an inbound interface to the queue of the outbound interface
the time it takes for a propagate from source to destination
the time it takes to place a frame on the physical medium for transport
the time a packet resides in the outbound queue of a router
第12题:
Power 770 servers
Power 750 servers
Power 755 servers
Power 720 servers
第13题:
What is the best description of serialization delay? ()
第14题:
A user reports it takes a long time to load all applications and the hard drive LED is showing constant activity. Which of the following is MOST likely the issue?()
第15题:
A customer calls in, talking constantly without allowing time for the technician to answer or ask questions. The technician decides to place the customer on hold to work on another issue and misses what the customer’s problem was. When the customer is finished explaining the issue, the technician asks the customer to summarize the problem again, which angers the customer. How could the technician have better handled the situation to avoid such a confrontation?()
第16题:
A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure. Which of the following tasks needs to be done to ensure that the solution will work properly?()
第17题:
A customer is currently using EMC disk. They are having an issue with the time it takes to complete a backup. What IBM tool can be used to show how much improvement can occur in the time it takes to backup the disk?()
第18题:
Your business has departmental reports that are generated every day. Each department must use the same set of queries, but access a different subset of data in the tables, depending on which department generates the report. The format of the reports is being developed; currently, the format changes daily. How would you configure the database to ensure that each department generates its report (based on its target data) using the most recent report format every day?()
第19题:
Deployment of Business Ready Teleworker with VoIP is not recommended.
The customer’s existing PBX must first be replaced with Cisco IP Telephony solution.
Business Ready Teleworker and Cisco IP Telephony can be deployed in parallel to the existing PBX, integrating the two with trunking.
Deployment is recommended only for full-time Teleworkers who have no other corporate phone.
第20题:
You should consider having the New Local Move Request wizard run from the Exchange Server 2010 Exchange Management Console (EMC).
You should consider having the Move Mailbox wizard run from the Exchange Server 2007 Exchange Management Console (EMC).
You should consider having the New-MoveRequest cmdlet run from the Exchange Server 2010 Exchange Management Shell.
You should consider having the Move-Mailbox cmdlet run from the Exchange Server 2007 Exchange Management Shell.
第21题:
you should consider having the properties of the mailbox database viewed using the exchange management console (emc).
you should consider running the get-mailbox cmdlet using the exchange management shell.
you should consider running the get-mail box statistics cmdlet using the exchange management shell.
you should consider having a send- and a recipient filter created using the exchange management console (emc).
第22题:
8 drive sets of 300 GB drives
4 drive sets of 300 GB drives
14 drive sets of 146 GB drives
18 drive sets of 146 GB drives
第23题:
DS3200
EXP3000
DS3300
DS3400