A co-worker is developing an implementation plan for a design that uses OSPF 2 and RIPv2 routing domains, with two routers redistributing between the two domains.The co- worker asks your help in choosing how to prevent domain loops by setting administrative distance.Assuming all other related settings use defaults, which of the following would solve the domain loop problem?()
A. The distance ospf intra - area 80 inter - area 80 OSPF subcommand
B. T he distance ospf external 80 OSPF subcommand
C. The distance ospf intra - area 180 inter - area 180 OSPF subcommand
D. The distance ospf external 180 OSPF subcommand
第1题:
Which definition best describes the implementation service component within the implement phase? Select exactly 1 answer(s) from the following:()。
第2题:
Which implement phase service component consists of preparing for migration,excuting a network migration plan,and completing migration test cases?()
第3题:
Which definition best describes the staging plan development service component within the design phase? Select exactly 1 answer(s) from the following:()。
第4题:
Which service components develops a plan that identifies the necessary steps to move from an existing system to the Cisco Unified Communications system()
第5题:
You are developing a verification plan for an upcoming OSPF implementation. Part of this plan is to verify the status of type 3 LSAs within the network. Which routers should you verify first to ensure that the configuration s are correct for generating type 3 LSAs?()
第6题:
Which service component in the design phase describes developing a detailed, site-specific plan for implementing the new technology system or solution()
第7题:
A co-worker is developing an implementation plan for a design that uses OSPF 2 and RIPv2 routing domains, with two routers redistributing between the two domains.The co- worker asks your help in choosing how to prevent domain loops by setting administrative distance. Assuming all other related settings use defaults, which of the following would solve the domain loop problem?()
第8题:
The distance ospf intra - area 80 inter - area 80 OSPF subcommand
T he distance ospf external 80 OSPF subcommand
The distance ospf intra - area 180 inter - area 180 OSPF subcommand
The distance ospf external 180 OSPF subcommand
第9题:
network management
improving QoS
determining budget
reducing costs
increasing competitiveness
improving customer support
第10题:
frame - relay map commands on R3 - R10 referencing the other routers in this group
Nine OSPF neighbor commands on each router
Nine OSPF neighbor commands on R1 and R2, with only two such commands on R3 - R10
R1 and R2 with ip ospf prio rity 1 commands to ensure they become DR and BDR
R3 - R10 with ip ospf priority 0 commands to ensure they do not become DR or BDR
第11题:
Detailed Design Development
Systems Acceptance Test Plan Development
Staging Plan
Implementation Plan Development
Project Kick-off
第12题:
staging and system migration
post implementation support handoff meeting
detailed design development
staff training
migration plan development
第13题:
Half of your network uses RIPv2 and the other half runs OSPF. The networks do not communicate with each other. Which two of these factors describe the impact of activating EIGRP over each separate part? ()
第14题:
Which statement about OSPF authentication is true?()
第15题:
Ten routers, R1 through R10, connect in a partial mesh over Frame Relay. For the mesh, R1 and R2 have PVCs connected to all other routers, but Routers R3 through R10 act as branch routers, with only two PVCs - one to R1 and one to R2. The routers u se IP subnet 10.1.1.0/24, with addresses 10.1.1.1, 10.1.1.2, and so on, through 10.1.1.10, respectively. The routers all use Inverse ARP to learn Frame Relay mapping information. All routers use a multipoint subinterface with network type point - tomultip oint nonbroadcast. A co - worker's implementation plan lists lots of configuration commands related to this design. The design states that all hosts should be able to ping all other hosts. Which commands are required for proper functioning of OSPF in this case?()
第16题:
Which design phase service component consists of developing a detailed, site-specific plan for implementing a new technology system or solution? Select exactly 1 answer(s) from the following:()。
第17题:
You have just completed an OSPF implementation. While executing your verification plan, you determine that R1 is not able to establish full OSPF adjacency with R2. The show ip ospf neighbor comman d output on R1 shows that R2 is stuck in the INIT state. What could be the cause of this problem?()
第18题:
Which three of the following are organizational objectives that should be addressed when developing a new VLAN implementation plan? ()
第19题:
Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。
第20题:
initiation planning analysis design development implementation operations and maintenance
project planning, site assessment risk assessment solution selection and acquisition, testing, and operations
prepare, plan, design, implement operate, and optimize
analysis, design, deployment testing, implementation, and production
presales, project planning, development implementation, operations testing, and operations sign- off
第21题:
Internal routers within the backbone area (area 0)
Internal routers within the NSSAs
Internal routers within the stubby areas
ASBRs
ABRs
DRs and BDRs
第22题:
Implementation Plan Development
Detailed Design Development
Systems Acceptance Test Plan Development
Staging Plan Development
第23题:
To enable OSPF authentication in a network, OSPF area 0 authentications must be enabled first
The payload of OSPF version 3 packets contains no authentication information
OSPF version 3 supports Advanced Encryption Standard
OSPF version 3 uses router ID as a key to encrypt OSPF hello packets
OSPF MD5 authentication uses TCP, and Plan Test authentication uses UDP
第24题:
providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer network
assessing the ability of site facilities to accommodate proposed infrastructure changes
developing and executing proof-of-concept tests, validating high-level infrastructure design, and identifying any design enhancements
installing, configuring, and integrating systems components based on an implementation plan developed in earlier phases
improving a customer’s infrastructure security system