What is the state of a process if a resource is not
available?
#define a 365*24*60*60
第1题:
What is the state of a process if a resource is not available? (Intel)
第2题:
The Estimate Activity Resource process is closely coordinated with the (73)process.
(73)
A. Estimate Costs
B. Sequence Activities
C. Plan Communications
D. Conduct Procurements
第3题:
An active PowerHA cluster was shutdown from C-SPOC with the "Unmanage Resource Groups" option. Afterthe operation successfully completes, what is the internal state of the cluster manager as shown by the lssrc -ls clstrmgrES command?()
第4题:
甲醇在空气中的爆炸极限是()。
第5题:
设置作为主接口的逻辑通道呼叫8次仍未成功为切换到备份接口,每隔60秒检查一次主逻辑通道是否恢复Up,这样的配置应为()
第6题:
The process of()schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.
第7题:
A cluster using IPAT via IP aliasing has four adapters. Normally there are several resource groups that have a total of four service IP labels. When two of the adapters fail, what happens?()
第8题:
You are creating a resource consumer group using the DBMS_RESOURCE_MANAGER.CREATE_CONSUMER_GROUP procedure. Which parameter will you use to define the resource scheduling method used between sessions within the resource group?()
第9题:
You need to recommend a process for monitoring the servers. The process must meet the company’s technical requirements. What should you include in the recommendation?()
第10题:
An HACMP setting timer may used to allow:()
第11题:
ST_STABLE
ST_BARRIER
ST_CBARRIER
ST_UNMANAGED
第12题:
They will be placed in an error state.
They will be released an not acquired by another node.
They will migrate to the next node in the priority list.
They will migrate to the next node and be reacquired by the first node on system restart.
第13题:
A. Init
B. 2Way
C. ExStart
D. Exchange
第14题:
What are three traffic descriptors that are used by the classification process to categorize packets that require special OoS handling?()
第15题:
During OSPF adjacency formation, in what state is a router when it is negotiating to be in charge of the database synchronization process?()
第16题:
设置作为主接口的逻辑通道呼叫8次仍未成功为切换到备份接口,每隔60秒检查一次主逻辑通道是否恢复Up,这样的配置应为()
第17题:
The process of()schedule activity durations uses information on schedule activityscope of work, required resource types, estimated resource quantities, and resource calendarswith resource availabilities.
第18题:
Which of the following is NOT a phase of the troubleshooting process?()
第19题:
What affect will a shutdown -Fr command have on the resource groups on a cluster node?()
第20题:
John, a junior workflow developer, has approached you for advice on a workflow process that he is defining. He is unclear about the implications of selecting the Runnable checkbox while defining the Process Activity. What advice would you offer?()
第21题:
You use Microsoft Visual Studio 2010 and Microsoft .NET Framework 4 to create a Windows Presentation Framework (WPF) application. You have a company logo that must appear on multiple forms in the application. The logo design changes frequently. You need to ensure that when the logo image is changed, you only need to update a single location. What should you do?()
第22题:
Init
2Way
ExStart
Exchange
第23题:
The resource group containing the IP labels changes to an offline state.
The IP service labels of the failed adapters relocate the surviving adapters.
Nothing because the resource groups wait for the adapters to become active again.
The resource groups containing the IP labels of the failed adapters migrate to a backup node.