During which condition should the operator of a pedestal crane shutdown operations ________.
A.Bunkering barge alongside
B.Potable water spill on deck
C.Crane hydraulic hose bursts
D.Trim greater than 4 feet
第1题:
Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane ________.
A.Taglines are wire rope purchases that raise and lower the jib
B.Taglines are wire ropes for horizontal positioning of the rider block
C.Taglines can be fastened to corners of vehicles or containers
D.The crane might not have taglines installed in its rigging system
第2题:
Which statement comparing a shipboard crane to conventional gear is TRUE ________.
A.Cranes are more difficult to secure for sea
B.The spotting area of the conventional gear is larger
C.A crane operator requires more training than the winch operator of a yard and stay rig
D.The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes
第3题:
During which condition should be operator of a pedestal crane shutdown operations?
A.Bunkering
B.High winds
C.Potable water spill on deck
D.More than 3°list
第4题:
Cranes are more difficult to secure for sea
The spotting area of the conventional gear is larger
A crane operator requires more training than the winch operator of a yard and stay rig
The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes
第5题:
Lightning in the vicinity
An approaching squall line
A fire on the pier
All of the above
第6题:
The cranes may be operated independently
The cranes may be interconnected for twin operation
When twinned,the crane rotation on the foundation assembly is unlimited
All of the above
第7题:
Lightning
High winds
Fire aboard
All of the above
第8题:
Bunkering
High winds
Potable water spill on deck
第9题:
Let go of both control levers and return to neutral position
Press the emergency stop
Notify the mate on watch
All of the above
第10题:
foreman
operator
opener
stevedore
第11题:
berth operator
harbour supervisor
master of a ship
port authority
第12题:
All engines,motors,fans,etc. should be shut down when fueling
All windows,doors,hatches,etc. should be closed
A fire extinguisher should be kept nearby
Fuel tanks should be topped off with no room for expansion
第13题:
Which wire rope purchases may be used with a 30-ton pedestal crane ________.
A.Hoist
B.Luff
C.Rider block
D.All of the above
第14题:
Which of the following statements is TRUE regarding crane operations ________.
A.Radio communications allow the crane operator to disregard the use of hand signals
B.The crane operators and signalman must be familiar with the correct hand signals
C.The forward cranes can be operated from the bridge
D.The aft cranes can be operated from the aft steering station
第15题:
Which of the following can an operator use to shutdown a system into single-user mode?()
第16题:
Taglines are wire rope purchases that raise and lower the jib
Taglines are wire ropes for horizontal positioning of the rider block
Taglines can be fastened to corners of vehicles or containers
The crane might not have taglines installed in its rigging system
第17题:
Normal boom stowage and shutdown operations
Emergency shutdown operation
Removing booms from stowage
All of the above
第18题:
Radio communications allow the crane operator to disregard the use of hand signals
The crane operators and signalman must be familiar with the correct hand signals
The forward cranes can be operated from the bridge
The aft cranes can be operated from the aft steering station
第19题:
time
space
length
visibility
第20题:
The cranes may be operated independently
The cranes may be interconnected for twin operation
The cranes are powered by independent internal combustion power units
All of the above
第21题:
Bunkering barge alongside
Potable water spill on deck
Crane hydraulic hose bursts
Trim greater than 4 feet
第22题:
Close the valves at the transfer manifold
Notify the person in charge of the shore facility
Shut down the transfer operation
Sound the fire alarm
第23题:
expansion space to leave in a tank
flash point at which the fuel will burn
temperature to which the fuel must be heated
rate at which the fuel can be pumped during transfer operations