During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet

题目

During which condition should the operator of a pedestal crane shutdown operations ________.

A.Bunkering barge alongside

B.Potable water spill on deck

C.Crane hydraulic hose bursts

D.Trim greater than 4 feet


相似考题
参考答案和解析
正确答案:C
更多“During which condition should the operator of a pedestal crane shutdown operations _______ ”相关问题
  • 第1题:

    Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane ________.

    A.Taglines are wire rope purchases that raise and lower the jib

    B.Taglines are wire ropes for horizontal positioning of the rider block

    C.Taglines can be fastened to corners of vehicles or containers

    D.The crane might not have taglines installed in its rigging system


    正确答案:A

  • 第2题:

    Which statement comparing a shipboard crane to conventional gear is TRUE ________.

    A.Cranes are more difficult to secure for sea

    B.The spotting area of the conventional gear is larger

    C.A crane operator requires more training than the winch operator of a yard and stay rig

    D.The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes


    正确答案:D

  • 第3题:

    During which condition should be operator of a pedestal crane shutdown operations?

    A.Bunkering

    B.High winds

    C.Potable water spill on deck

    D.More than 3°list


    正确答案:B
    在那种情况下,应该关闭克令吊作业?大风。

  • 第4题:

    单选题
    Which statement comparing a shipboard crane to conventional gear is TRUE().
    A

    Cranes are more difficult to secure for sea

    B

    The spotting area of the conventional gear is larger

    C

    A crane operator requires more training than the winch operator of a yard and stay rig

    D

    The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes


    正确答案: D
    解析: 暂无解析

  • 第5题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Lightning in the vicinity

    B

    An approaching squall line

    C

    A fire on the pier

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第6题:

    单选题
    Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
    A

    The cranes may be operated independently

    B

    The cranes may be interconnected for twin operation

    C

    When twinned,the crane rotation on the foundation assembly is unlimited

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Lightning

    B

    High winds

    C

    Fire aboard

    D

    All of the above


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Bunkering

    B

    High winds

    C

    Potable water spill on deck


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    Which action(s) should the operator of a pedestal crane take if crane control is lost?()
    A

    Let go of both control levers and return to neutral position

    B

    Press the emergency stop

    C

    Notify the mate on watch

    D

    All of the above


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    During operation, the ()should check the working condition of the derrick.
    A

    foreman

    B

    operator

    C

    opener

    D

    stevedore


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    The()should ensure that the holds in which chemical packages are stowed are properly supervised during the loading operations and these packages are regularly inspected for leakage or damage on the voyage.
    A

    berth operator

    B

    harbour supervisor

    C

    master of a ship

    D

    port authority


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Which statement is FALSE concerning precautions during fueling operations?()
    A

    All engines,motors,fans,etc. should be shut down when fueling

    B

    All windows,doors,hatches,etc. should be closed

    C

    A fire extinguisher should be kept nearby

    D

    Fuel tanks should be topped off with no room for expansion


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Which wire rope purchases may be used with a 30-ton pedestal crane ________.

    A.Hoist

    B.Luff

    C.Rider block

    D.All of the above


    正确答案:D

  • 第14题:

    Which of the following statements is TRUE regarding crane operations ________.

    A.Radio communications allow the crane operator to disregard the use of hand signals

    B.The crane operators and signalman must be familiar with the correct hand signals

    C.The forward cranes can be operated from the bridge

    D.The aft cranes can be operated from the aft steering station


    正确答案:B

  • 第15题:

    Which of the following can an operator use to shutdown a system into single-user mode?()

    • A、shutdown -d
    • B、shutdown -s
    • C、shutdown -m
    • D、shutdown -Fr -s 1

    正确答案:C

  • 第16题:

    单选题
    Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane().
    A

    Taglines are wire rope purchases that raise and lower the jib

    B

    Taglines are wire ropes for horizontal positioning of the rider block

    C

    Taglines can be fastened to corners of vehicles or containers

    D

    The crane might not have taglines installed in its rigging system


    正确答案: D
    解析: 暂无解析

  • 第17题:

    单选题
    Which action(s) is/are included in crane operations?()
    A

    Normal boom stowage and shutdown operations

    B

    Emergency shutdown operation

    C

    Removing booms from stowage

    D

    All of the above


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    Which of the following statements is TRUE regarding crane operations().
    A

    Radio communications allow the crane operator to disregard the use of hand signals

    B

    The crane operators and signalman must be familiar with the correct hand signals

    C

    The forward cranes can be operated from the bridge

    D

    The aft cranes can be operated from the aft steering station


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    The crane is usually mounted on a pedestal to offer adequate () to the operator.
    A

    time

    B

    space

    C

    length

    D

    visibility


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
    A

    The cranes may be operated independently

    B

    The cranes may be interconnected for twin operation

    C

    The cranes are powered by independent internal combustion power units

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Bunkering barge alongside

    B

    Potable water spill on deck

    C

    Crane hydraulic hose bursts

    D

    Trim greater than 4 feet


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    If you observe any situation which presents a safety or pollution hazard during fuel transfer operations, which of the following actions should be taken FIRST?()
    A

    Close the valves at the transfer manifold

    B

    Notify the person in charge of the shore facility

    C

    Shut down the transfer operation

    D

    Sound the fire alarm


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    The temperature of the fuel oil received during bunkering operations is critical in determining the()
    A

    expansion space to leave in a tank

    B

    flash point at which the fuel will burn

    C

    temperature to which the fuel must be heated

    D

    rate at which the fuel can be pumped during transfer operations


    正确答案: C
    解析: 暂无解析