Each life jacket light that has a non-replaceable power source must be replaced ______.
A.every 6 months after initial installation
B.every 12 months after initial installation
C.every 24 months after initial installation
D.on or before the expiration date of the power source
第1题:
救生圈()
第2题:
A server has a single failed hard drive in an array that is accessed through a hot plug backplane to ease replacement of failed drives. After replacing the drive several times, each of the replacement drives failed to power up and rebuild as the failed drive. Which of the following is the MOST likely cause of the failures?()
第3题:
The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()
第4题:
A floppy drive is replaced in a computer and now when the computer is turned on the floppy drive light is constantly lit. Which of the following is the MOST likely cause?()
第5题:
A fusible link will automatically open after a fire is extinguished and reset the damper
Fusible links must be replaced at every inspection for certification
Fusible links are tested by applying a source of heat to them
Fusible links must be replaced if a damper is activated
第6题:
one category I 406 Mhz satellite EPIRB
at least one life buoy on each side of the vessel fitted with a buoyant life line
at least 12 rocket parachute flares
All of the above
第7题:
The backplane has failed and needs to be replaced.
The array must be disbanded and recreated from a backup source to recognize the replacement drive.
There is a conflict with the optical drive on the server.
The server power supply is failing and not providing enough power for all the drives.
第8题:
in series with the power source and load
in parallel with the power source and load
insuring correct polarity
using the lowest range possible to prevent instrument damage
第9题:
person aboard
person working on deck
crew member
None of the above are correct
第10题:
Proper timing
Accurate metering
Suitable injection rate
Suitable atomization rate
第11题:
every 6 months after initial installation
every 12 months after initial installation
every 24 months after initial installation
on or before the expiration date of the power source
第12题:
day
week
month
year
第13题:
A customer has a p650 on order and plans to put it in a current OEM rack. They are concerned that the p650 power supply may demand more current than the OEM PDU can provide. Which planning guide specification would provide the necessary requirements?()
第14题:
The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch.What must be done to ensure that this new switch becomes the root bridge on the network?()
第15题:
The technician has replaced a power supply with an identical power supply, and now the high end graphics card is not working. Which of the following should the technician check?()
第16题:
Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()
第17题:
8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor
4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor
8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
第18题:
The memory
The CMOS battery
The PCIe power jack
The processor for chip creep
第19题:
While the ship is at sea,there must be available at all times a supply of electrical energy sufficient to operate the radio installations and to charge any batteries used as part of a reserve source of energy
Both the VHF and MF/HF installations must be simultaneously supplied
A means of ensuring a continuous supply of electrical power must be provided to all GMDSS equipment that could be affected by an interruption in power
If a UPS or equivalent is used to supply power to the ship's GPS receiver or other source of positional information,a means must be provided to ensure the continuous supply of the information in the event of a failure to the ship's main or emergency source of power
第20题:
the light is characterized as alternately flashing
the lighthouse has lost power and has switched to emergency lighting
it is the identifying light characteristic of the lighthouse
you have entered an area of shoal water or other hazard
第21题:
The power supply has failed.
The drive cable is connected backwards.
The floppy drive has failed.
The proper drivers have not been loaded.
第22题:
when the power source is replaced
each year after installation
every six months
when it is no longer serviceable
第23题:
the mess room
each lifeboat
each industrial work site
each fire station