A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.
A.heavy-walled drill pipe
B.tool joint
C.down hole tool
D.drill collar
第1题:
A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.
A.temporary guide base
B.permanent guide base
C.guide frame
D.foundation template
第2题:
第3题:
重吊杆用于吊大的重件。()
第4题:
regulate the fuel supply
maintain a constant fuel viscosity at the fuel valves
maintain efficient cooling
alter the fuel density
第5题:
It is used to determine which route should become active.
It is used to select which routing table to use for forwarding.
It is used to determine what routes to accept into the routing table.
It is used to select the best route between multiple equal cost paths.
第6题:
temporary guide base
permanent guide base
guide frame
foundation template
第7题:
string
stand
joint
standpipe
第8题:
Shrouds
King posts
Stays
Turnbuckles
第9题:
mallet used when splicing wire rope
sharp pointed crow bar used to unlay wire rope
tapered steel pin used to separate wire rope
tapered wooden pin used when splicing heavy rope
第10题:
It is used as a tiebreaker when the same prefix is available through multiple protocols.
It is used to determine the preferred path to a given destination.
It is used to select the best route between multiple equal-cost paths.
It is used to select which routing table to use for forwarding.
第11题:
cold corrosion of the nozzles
fuel viscosity for better atomization
carbon accumulation on the nozzles
fuel detonation in the cylinders
第12题:
as a connecting strap between the butted ends of plating
to stiffen areas under points of great stress between beams
to prevent the anchor from fouling when the brake is released
to provide an extra heavy fitting in a lift cargo released
第13题:
The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.
A.String
B.Stand
C.Joint
D.Standpipe
第14题:
测深管()
第15题:
as a connecting strap between the butted ends of plating
to stiffen areas under points of great stress between beams
to prevent the anchor from fouling when the brake is released
to provide an extra heavy fitting in a heavy lift cargo rig
第16题:
transport tubulars from the pipe racks to the derrick floor
maintain constant tension on the marine riser
store and secure the excess drill line
lower and hoist the drill string into and out of the drilled hole
第17题:
galvanized to protect against corrosion
held in place with heavy materials such as spare pendant wire
limited to no more than five courses high
provided with bulwarks at both ends of their bays
第18题:
annular blowout preventer
annulus
accumulator
automatic choke
第19题:
heavy-walled drill pipe
tool joint
down hole tool
drill collar
第20题:
drill stem guide
guide frame
drill string frame
casing guide
第21题:
lifts
collars
elevators
clamps
第22题:
the land could not be used for anything.
it was impossible to use the land to build on.
the land could then be built on.
the land could be used for any purpose.
第23题:
close and seal around the drill pipe
close and seal around casing
cut off pipe inside the preventer stack