A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps

题目

A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.

A.lifts

B.collars

C.elevators

D.clamps


相似考题
更多“A set of clamps that are latched onto the drill pipe to allow the driller to raise or lowe ”相关问题
  • 第1题:

    In order to allow the establishment of a Telnet session with a router, which set of commands must be configured()。

    A.A

    B.B

    C.C

    D.D

    E.E

    F.F


    参考答案:F

  • 第2题:

    As oil pipe line connections were broken, _____ quantity of oil was caused to spill onto the wharf and into the dock water.

    A.a not knowing

    B.an unknowing

    C.an unknown

    D.a not know


    正确答案:C
    一个油管线的链接一旦损坏,不明数量的油漏到码头的水里。

  • 第3题:

    ()(除了) the fire drill, there are also boat drill and emergency drill on board.

    • A、Except
    • B、Although
    • C、In addition to
    • D、But

    正确答案:C

  • 第4题:

    Which of the following will allow a technician to extend a partition?()

    • A、Set the drive up as basic
    • B、Format the drive to FAT32
    • C、Install a second hard drive
    • D、Set the drive as dynamic

    正确答案:D

  • 第5题:

    Your company has two Active Directory forests named Forest1 and Forest2. The forest functional level and the domain functional level of Forest1 are set to Windows Server 2008. The forest functional levle of Forest2 is set to WIndows 2000, and the domain functional levels in Forest2 are set to Windows Server 2003. You need to set up a transitive forest trust between Frorest1 and Forest2. What should you do first()

    • A、Raise the forest functional level of Forest2 to Windows Server 2003 Interim mode.
    • B、Raise the forest functional level of Forest2 to Windows Server 2003.
    • C、Upgrade the domain controllers in Forest2 to Windows Server 2008.
    • D、Upgrade the domain controllers in Forest2 to Windows Server 2003.

    正确答案:B

  • 第6题:

    单选题
    In securing deck loads for an ocean tow,drill pipe should be().
    A

    galvanized to protect against corrosion

    B

    held in place with heavy materials such as spare pendant wire

    C

    limited to no more than five courses high

    D

    provided with bulwarks at both ends of their bays


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    Your company has a single Active Directory directory service forest named contoso.com. A partner organization has a forest named fabrikam.com. Both forests are set to the Windows 2000 forest functional  level. Domains named contoso.com and fabrikam.com are set to Windows 2000 Native Mode. You plan to create a forest trust relationship between contoso.com and fabrikam.com. You need to be able to configure selective authentication for the trust relationship. What should you do?()
    A

     Raise the forest functional level on contoso.com and fabrikam.com to Windows Server 2003.

    B

     Raise the domain functional level on contoso.com and fabrikam.com to Windows Server 2003.

    C

     Raise the domain functional level and the forest functional level on contoso.com to Windows Server 2003.

    D

     Raise the domain functional level and the forest functional level on fabrikam.com to Windows Server 2003.


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    () unit is mounted so as to raise and lower the cable from the spurling pipe, which is at the top and center of the chain or cable locker.
    A

    The cable lifter

    B

    The hoisting motor

    C

    The topping wire

    D

    The life-raft


    正确答案: D
    解析: 暂无解析

  • 第9题:

    多选题
    Which of the following will allow Karen, a technician, to determine if the correct voltages are reaching the computer components? (Select TWO).()
    A

    Power supply tester

    B

    Cable tester

    C

    Loopback plugs

    D

    Multimeter

    E

    Butt set


    正确答案: C,D
    解析: 暂无解析

  • 第10题:

    单选题
    A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().
    A

    lifts

    B

    collars

    C

    elevators

    D

    clamps


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    ()(除了) the fire drill, there are also boat drill and emergency drill on board.
    A

    Except

    B

    Although

    C

    In addition to

    D

    But


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    In order to prevent stress from being set up in the metal, expansion joints are fitted which _____ the stress by allowing the pipe to expand or contract freely.
    A

    reclaim

    B

    reconcile

    C

    rectify

    D

    relieve


    正确答案: B
    解析:
    句意:为了防止压力在金属中形成,伸缩缝安装其中,这样可以通过管的扩张或收缩自如来释放压力。relieve减轻;解除。reclaim开拓;回收再利用。reconcile使协调;使和解。rectify纠正。

  • 第13题:

    A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.

    A.heavy-walled drill pipe

    B.tool joint

    C.down hole tool

    D.drill collar


    正确答案:D

  • 第14题:

    ()are usually stowed both above and below deck.

    • A、Containers
    • B、Trucks
    • C、Machinery
    • D、Clamps

    正确答案:A

  • 第15题:

    Which of the following protocols allow the set up, teardown and streaming of VoIP traffic? ()(SelectTWO)

    • A、NTP
    • B、VNC
    • C、RTP
    • D、SIP
    • E、TLS

    正确答案:C,D

  • 第16题:

    You are creating a SQL Tuning Set to allow a group of SQL statements to be passed into the SQL Tuning Advisor. Which packages will you use to create the SQL Tuning Set?()

    • A、 DBMS_WORKLOAD_REPOSITORY
    • B、 DBMS_RESOURCE_MANAGER
    • C、 DBMS_SQLTUNE
    • D、 DBMS_ADVISOR

    正确答案:C

  • 第17题:

    单选题
    The main function of the drawworks on a ship is to().
    A

    transport tubulars from the pipe racks to the derrick floor

    B

    maintain constant tension on the marine riser

    C

    store and secure the excess drill line

    D

    lower and hoist the drill string into and out of the drilled hole


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().
    A

    heavy-walled drill pipe

    B

    tool joint

    C

    down hole tool

    D

    drill collar


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    The tool used in precision work to smooth or enlarge a slightly undersized hole, is called()
    A

    round out

    B

    round file

    C

    reamer

    D

    hole driller


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    Increased air () will raise scavenge efficiency and allow a greater mass of air to be compressed; more fuel may now be burned giving an increased power.
    A

    specific volume

    B

    density

    C

    viscosity

    D

    calorific value


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    As oil pipe line connections were broken,()quantity of oil was caused to spill onto the wharf and into the dock water.
    A

    a not knowing

    B

    an unknowing

    C

    an unknown

    D

    a not known


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    The shear rams of a ship blowout preventer stack are used in emergency well control to().
    A

    close and seal around the drill pipe

    B

    close and seal around casing

    C

    cut off pipe inside the preventer stack

    D

    close and seal around drill collars


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    An integral part of a blowout preventer that serves as the closing element on an open hole,and whose ends do not fit around the drill pipe but seal against each other and shut off the space below completely is the().
    A

    shear ram

    B

    blind ram

    C

    pipe ram

    D

    annular ram


    正确答案: B