Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.
A.INTERNATIONAL LOADLINE CERTIFICATE
B.PASSENGER SHIP SAFETY CERTIFICATE
C.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE
D.GENERAL DECLARATION
第1题:
Common stock gets higher return than any other investment because of ______.
A.profits made from buying and reselling stocks
B.dividends received from holding the stocks
C.tax allowance provided from investing in the stocks
D.all of the above
第2题:
Prior to getting underway in fresh or brackish water,the Master must ______.
A.log the density of the water
B.secure all overboard discharges
C.take on fresh water ballast
D.clean the sides with fresh water
第3题:
______is the number of millimeters by which the mean draft changes when a ship passes from salt water to fresh water,or vice versa,whilst floating at the loaded draft.
A.TPC
B.The Fresh Water Allowance
C.Parallel sinking of the ship
D.UKC
第4题:
第5题:
水泥涂料用于淡水舱和双层底舱。()
第6题:
eliminate all water entering the hole
only plug holes in machinery or other vital spaces
reduce the entry of water as much as possible
plug the largest holes first
第7题:
engine
sea water pump
cylinder cooler
fresh water generator
第8题:
Distilled
Distilling
Boiling
Boiled
第9题:
The fuel oil
The lube oil
The sea water
The fresh water
第10题:
use lye or other mild detergent
wash it with fresh water,dry and store it
wash it with salt water
use cleaning fluid on nylon,dacron and other synthetic lines
第11题:
main bearings
sea water
cooling oil
lower temperature fresh water
第12题:
log the density of the water
secure all overboard discharges
take on fresh water ballast
clean the sides with fresh water
第13题:
do I have more than the duty-free allowance?
第14题:
______ is not a proper procedure for a lashing of the timber deck cargo.
A.to be efficiently attached to the deck stringer plate or other strengthened points
B.to pass over the timber deck cargo
C.to be shackled to eye plates
D.to be applied not contacting with the timber deck cargo
第15题:
第16题:
The ()is pumped onto the ship at the loading port by shore pumps.
第17题:
污水井盖()
第18题:
INTERNATIONAL LOADLINE CERTIFICATE
PASSENGER SHIP SAFETY CERTIFICATE
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE
GENERAL DECLARATION
第19题:
by cooling sea water
by heating sea water
by evaporation of sea water
by purifying sea water
第20题:
INTERNATIONAL LOAD LINE CERTIFICATE
PASSENGER SHIP SAFETY CERTIFICATE
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE
GENERAL DECLARATION
第21题:
sea water temperature must never be warmer than 40℃
jacket water pressure should always be greater than the sea water pressure
jacket water temperature must always be less than 60℃
jacket water pressure must always be less than the sea water pressure
第22题:
one salt water, one fresh water
one salt water, one fuel
one fresh water, one fuel
one steam, one fuel
第23题:
the provision to be provided when the vessel sails in fresh water area
the fresh water to be carried by a vessel
the allowance of fresh water for each crew member when in distress at sea
the amount of free board decreased when sailing in fresh water area