During fueling,all doors,hatches,and ports ______.
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
第1题:
The Certificate of pratique shall only have effect in ______.
A.all ports of the issuing country
B.all ports of the world
C.all ports other than a issuing country
D.all ports of ship's arrival
第2题:
Upon completion of fueling a gasoline driven vessel it is necessary to ______.
A.keep ports,doors,windows,and hatches closed
B.start engines immediately
C.ventilate before starting engine
D.None of the above
第3题:
() fire doors, windows, hatches, accesses and ventilators.
第4题:
either all the way open or all the way closed
normally fully open
throttled depending on load
controlled by liquefied pressure
第5题:
all mooring lines have a different tension
the leeward lines have higher tension than the windward lines
the maximum tension of the most heavily loaded line does not exceed the safe working load
all horizontal tension forces on the windward lines are no greater than the vertical tension forces
第6题:
cleared
checked
removed
repaired
第7题:
keep ports,doors,windows,and hatches closed
start engines immediately
ventilate before starting engine
None of the above
第8题:
the trunking should be opened up
should the trunking be opened up
the trunking should not be opened up
should the trunking not be opened up
第9题:
All watertight doors which are in use while the vessel is underway shall be operated
All lifeboat equipment shall be examined
Fire pumps shall be started and all exterior outlets opened
All of the above
第10题:
to windward should be opened and the ones to leeward should be closed
to leeward should be opened and the ones to windward should be closed
should be opened
should be closed
第11题:
the fuel tank fill pipe should be left open to allow vapors to vent from the tank
the engine should be started immediately to prevent vapor lock in the fuel line
all hatches should be opened and all compartments should be ventilated
open the fuel line and drain a small amount of gasoline into the bilge to clear the line of sediment
第12题:
All engines,motors,fans,etc. should be shut down when fueling
All windows,doors,hatches,etc. should be closed
A fire extinguisher should be kept nearby
Fuel tanks should be topped off with no room for expansion
第13题:
During an abandonment or drill,the first person to arrive at the survival craft should ______.
A.pass out food and water to personnel
B.open the doors and start the sprinkler system
C.activate the emergency release handle
D.open the doors and prepare the craft for boarding
第14题:
In most cases involving spillage of dangerous goods,the most effective response will probably be to ______.
A.attempt to repack dangerous goods
B.close all hatches and doors
C.open all hatches and doors
D.wash the substance overboard or jettison it
第15题:
The DAI feature has been implemented in the Company switched LAN. Which three statements are true about the dynamic ARP inspection (DAI) feature? ()
第16题:
fuel supply valve should be closed
hatches,doors,and oar ports should be closed
air cylinder shut-off valve should be closed
engine should be shut off
第17题:
pass out food and water to personnel
open the doors and start the sprinkler system
activate the emergency release handle
open the doors and prepare the craft for boarding
第18题:
DAI can be performed on ingress ports only.
DAI can be performed on both ingress and egress ports.
DAI is supported on access ports, trunk ports, EtherChannel ports, and private VLAN ports.
DAI should be enabled on the root switch for particular VLANs only in order to secure the ARP caches of hosts in the domain.
DAI should be configured on all access switch ports as untrusted and on all switch ports connected to other switches as trusted.
DAI is supported on access and trunk ports only.
第19题:
Secure all engine room doors,hatches,and vents
Close the fuel line valve
Check the spread of the fire with foam
Cast the barge off the wharf
第20题:
Reduce the pumping rate by closing the deck filling valve
Close all overflow valves
Place 5 gallon containers under all flange connections in the fuel line
Reduce the pumping rate and sound tanks frequently as the level rises
第21题:
before
after
when
until
第22题:
to windward should be opened and the ones to leeward should be closed
to leeward should be opened and the ones to windward should be closed
should be opened
should be closed
第23题:
Closed
Close
Closing