What is(are) standard operating procedure(s) used on a Ro-Ro vessel?
A.Periodic inspection and retensioning of lashings as required during voyage
B.Lashings may be completed after the vessel leaves port
C.One QMED assigned to oversee the initial loading and lashing
D.All of the above
第1题:
What may NOT be used when securing heavy vehicles aboard Ro-Ro vessels ________.
A.Chain lever
B.Turnbuckle
C.Webbing
D.Chain
第2题:
Which lashing device(s)would be used in securing heavy vehicles aboard Ro-Ro vessels ________.
A.Buckle or ratchet tensioner
B.Webbing
C.Chain
D.All of the above
第3题:
什么是标准操作规程(Standard Operating Procedure,SOP)?
第4题:
Periodic inspection and retensioning of lashings as required during voyage
Lashings may be completed after the vessel leaves port
One QMED assigned to oversee the initial loading and lashing
All of the above
第5题:
With the Cargo Gear Register on the ship
In the Official Log
At the Coast Guard Marine Safety Office with the vessel's inspection records
At the central records center of the agency testing the cargo gear
第6题:
Whether or not all of the vessel's control equipment is in working order
The vessel's draft in relation to the available depth of water
Whether the nature of the vessel's work limits maneuverability required by the Rules
Whether or not the vessel is the give-way vessel in a meeting situation
第7题:
for 1 year
for 2 years
until the next Coast Guard inspection
until the vessel's Certificate of Inspection expires
第8题:
noting the condition of the fairwater
inspection of the keyway
logging inspection results in the official deck log
all of above
第9题:
When was your vessel built
At what time is your vessel building
When is your vessel built
At what time you built your vessel
第10题:
The reinspection will be made between the fourteenth and sixteenth months
The inspector shall examine all accessible parts of the vessels's hull
The inspector shall examine the vessel's machinery as well as equipment
The scope of the reinspection shall be the same as for the inspection for certification,but in less detail
第11题:
when the declination and latitude are of different names
when the declination is greater than and the same name as the latitude
if the vessel is stopped or making bare steerageway
on a fast vessel on northerly or southerly headings
第12题:
第13题:
What should be done after putting down the ramp on a Ro-Ro vessel,prior to loading or discharging cargo ________.
A.Turn on red cargo light
B.Turn on ventilation for cargo holds
C.Call out the deck department for all hands
D.None of the above
第14题:
Which operating procedure(s)should be adhered to on a Ro-Ro vessel ________.
A.One officer assigned to oversee the initial loading and lashing
B.All lashings should be completed before leaving port
C.Periodic inspection and retensioning of lashings during the voyage
D.All of the above
第15题:
If a vessel subject to PSC inspection, PSC Officer shall give the inspection to the Captain, the given timeframe for rectification of each deficiency is commonly given in a coded form which called “action code”, which code listed below is used for indication of detention of the vessel?()
第16题:
10
30
17
16
第17题:
Notify the Captain of the Port (COTP) if you cannot repair it within 96 hours
Notify the Officer in Charge of Marine Inspection (OCMI) if you cannot repair it within 48 hours
Moor the vessel until it is repaired
Anchor the vessel until it is repaired
第18题:
consealed
detained
contained
kept
第19题:
Jacob's ladder
Manropes
Heaving lines
All of the above
第20题:
nonmagnetic
weatherproof
corrosion resistant
capable of being permanently affixed to the vessel
第21题:
align the vessel's tailshaft
determine the vessel's trim
determine the vessel's freeboard
locate the vessel's centerline
第22题:
when was your vessel built
at what time is your vessel building
when is your vessel built
at what time you built your vessel
第23题:
Manning requirements
Minimum freeboard permitted
Grade(s) of cargoes that the vessel may carry
Waters upon which the vessel may be operated