更多“What is the state of a process if a resource is not available? (Intel)”相关问题
  • 第1题:

    What are three traffic descriptors that are used by the classification process to categorize packets that require special OoS handling?()

    • A、Resource Reservation Protocol (RSVP)
    • B、IP precedence
    • C、traffic shaping
    • D、trust boundaries
    • E、DSCP
    • F、application

    正确答案:B,E,F

  • 第2题:

    An active PowerHA cluster was shutdown from C-SPOC with the "Unmanage Resource Groups" option. Afterthe operation successfully completes, what is the internal state of the cluster manager as shown by the lssrc -ls clstrmgrES command?()

    • A、ST_STABLE
    • B、ST_BARRIER
    • C、ST_CBARRIER
    • D、ST_UNMANAGED

    正确答案:A

  • 第3题:

    During OSPF adjacency formation, in what state is a router when it is negotiating to be in charge of the database synchronization process?()

    • A、Init
    • B、2Way
    • C、ExStart
    • D、Exchange

    正确答案:C

  • 第4题:

    The process of()schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.

    • A、estimating
    • B、defining
    • C、planning
    • D、sequencing

    正确答案:D

  • 第5题:

    A cluster administrator is trying to configure tmssa for the non-IP network. Having installed the devices.ssa.tm.rte fileset, what is the next step that must be performed to create the target mode devices?()  

    • A、 Reboot each cluster node.
    • B、 Change the ssa node number to a non-zero value.
    • C、 Change the SSAR device state from defined to available.
    • D、 Run the cfgmgr process on each node to create the target mode devices.

    正确答案:B

  • 第6题:

    What affect will a shutdown -Fr command have on the resource groups on a cluster node?()

    • A、 They will be placed in an error state.
    • B、 They will be released an not acquired by another node.
    • C、 They will migrate to the next node in the priority list.
    • D、 They will migrate to the next node and be reacquired by the first node on system restart.

    正确答案:B

  • 第7题:

    You recently created a complex resource plan named DB_PLAN that has two subplans named OLTP_PLAN and DSS_PLAN. The OLTP_PLAN and DSS_PLAN subplans are allotted 70 percent and 30 percent of the total CPU resources, respectively. The OLTP_PLAN subplan allocates 35 percent of the available CPU resources to a resource consumer group named ACCT_CLERKS. According to the OLTP_PLAN subplan, the remaining 65 percent of the available CPU resources is allocated to a second resource consumer group named MKT_CLERKS. The CPU resources available to the DSS_PLAN subplan are divided into two resource consumer groups named MKT_MANAGERS and FIN_MANAGERS. The MKT_MANAGERS group receives 65 percent of the available CPU resources, and the FIN_MANAGERS group receives 35 percent of the available CPU resources. What percentage of actual CPU resources will the resource consumer group, MKT_CLERKS, receive, if the DSS_PLAN subplan does NOT consume any CPU resources?()  

    • A、 45.5
    • B、 65
    • C、 70
    • D、 100

    正确答案:B

  • 第8题:

    You work as the IT professional in an international company which is named Wiikigo. You are experiencedin implementing and administering a network operating system. You are specialized in deploying servers,configuring Windows Server 2008 Terminal services and network application services,and configuring aweb services infrastructure. You are in charge of a server that runs Windows Server 2008. The TerminalServices server role is installed on the server. A Terminal Services application runs on the server. Now youreceive report from users saying that that the application stops responding. You monitor the memory usageon the server for a week and find that the application has a memory leak. A patch is not currently available.You create a new resource-allocation policy in Microsoft Windows System Resource Manager (WSRM).You configure a Process Matching Criteria named TrackShip and choose the application. You have toterminate the application when the application consumes more than half of the available memory on theserver. What action should you perform?()

    • A、The resource-allocation policy and the maximum working set limit option should be set to half the available memory on the server. The new policy should be set as a Managing Policy.
    • B、The resource-allocation policy and the maximum committed memory option should be set to half the available memory on the server. The new policy should be set as a Profiling Policy.
    • C、The resource-allocation policy and the maximum committed memory option should be set to half the available memory on the server. The new policy should be set as a Managing Policy.
    • D、The resource-allocation policy should be configured and the maximum working set limit option should be set to half the available memory on the server. The new policy should be set as a Profiling Policy.

    正确答案:C

  • 第9题:

    单选题
    A Cluster Administrator is implementing a custom resource group for a new web application. The  goal is to ensure the resource group is always active. Preference should be given to the priority node at startup time,but fallback to the priority node should be scheduled during a nonbusy time.  Using custom resource group options, what combination best achieve the desired resource group behavior?()
    A

     Online On All Available Nodes,using a setting timer

    B

     Online On Home Node Only,using a fallback timer

    C

     Online On Home Node Only,using both setting and fallback timers

    D

     Online On First Available Node,using both settling and fallback timers


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    What must be done to make a shared tape drive highly available?()
    A

     Ensure the rmt numbers are unique per node.

    B

     Nothing,because HACMP manages the state of the tape drive.

    C

     Nothing,because highly available tape devices are not supported.

    D

     Ensure that the tape device is in a defined state after system startup.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    Which agent will be selected when the Resource Selection Criteria is set to circular routing?()
    A

    the agent who has been in the Available state for the longest amount of time  

    B

    the next available agent with the highest priority, as determined by the agent order in the Resources list

    C

    the next available agent, based on the last agent selected and the agent order in the Resources list  

    D

    the agent assigned to the selected Resource Group and is thus qualified to be selected


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A cluster administrator is trying to configure tmssa for the non-IP network. Having installed the devices.ssa.tm.rte fileset, what is the next step that must be performed to create the target mode devices?()
    A

     Reboot each cluster node.

    B

     Change the ssa node number to a non-zero value.

    C

     Change the SSAR device state from defined to available.

    D

     Run the cfgmgr process on each node to create the target mode devices.


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Which agent will be selected when the Resource Selection Criteria is set to circular routing?()

    • A、the agent who has been in the Available state for the longest amount of time  
    • B、the next available agent with the highest priority, as determined by the agent order in the Resources list
    • C、the next available agent, based on the last agent selected and the agent order in the Resources list  
    • D、the agent assigned to the selected Resource Group and is thus qualified to be selected

    正确答案:C

  • 第14题:

    A Cluster Administrator is implementing a custom resource group for a new web application. The  goal is to ensure the resource group is always active. Preference should be given to the priority node at startup time,but fallback to the priority node should be scheduled during a nonbusy time.  Using custom resource group options, what combination best achieve the desired resource group behavior?()   

    • A、 Online On All Available Nodes,using a setting timer
    • B、 Online On Home Node Only,using a fallback timer
    • C、 Online On Home Node Only,using both setting and fallback timers
    • D、 Online On First Available Node,using both settling and fallback timers

    正确答案:D

  • 第15题:

    The process of()schedule activity durations uses information on schedule activityscope of work, required resource types, estimated resource quantities, and resource calendarswith resource availabilities.

    • A、estimating
    • B、defining
    • C、planning
    • D、sequencing

    正确答案:A

  • 第16题:

    A cluster using IPAT via IP aliasing has four adapters. Normally there are several resource  groups that have a total of four service IP labels. When two of the adapters fail, what happens?()  

    • A、 The resource group containing the IP labels changes to an "offline" state.
    • B、 The IP service labels of the failed adapters relocate the surviving adapters.
    • C、 Nothing because the resource groups wait for the adapters to become active again.
    • D、 The resource groups containing the IP labels of the failed adapters migrate to a backup node.

    正确答案:B

  • 第17题:

    Which command is used by the system boot process to determine what resources are available to the system?()

    • A、diag
    • B、lscfg
    • C、mpcfg
    • D、cfgmgr

    正确答案:D

  • 第18题:

    What must be done to make a shared tape drive highly available?()  

    • A、 Ensure the rmt numbers are unique per node.
    • B、 Nothing,because HACMP manages the state of the tape drive.
    • C、 Nothing,because highly available tape devices are not supported.
    • D、 Ensure that the tape device is in a defined state after system startup.

    正确答案:D

  • 第19题:

    You need to recommend a process for monitoring the servers. The process must meet the  company’s technical requirements.    What should you include in the recommendation?()

    • A、event subscriptions
    • B、Data Collector Sets (DCSs)
    • C、Resource Monitor
    • D、Microsoft System Center Operations Manager

    正确答案:A

  • 第20题:

    Terminal Services application runs on the server. Users report that the application stops responding. You monitor the memory usage on the server for a week. You discover that the application has a memory leak. A patch is not currently available.  You create a new resource-allocation policy in Microsoft Windows Server Resource Manager. You configure a Process Matching Criteria named TrackShip and select the application.  You need to terminate the application when the application consumes more than half of the available memory on the server. What should you do?()

    • A、Configure the resource-allocation policy and set the maximum working set limit option to half the available memory on the server. Set the new policy as a Profiling Policy.
    • B、Configure the resource-allocation policy and set the maximum working set limit option to half the available memory on the server. Set the new policy as a Managing Policy.
    • C、Configure the resource-allocation policy and set the maximum committed memory option to half the available memory on the server. Set the new policy as a Profiling Policy.
    • D、Configure the resource-allocation policy and set the maximum committed memory option to half the available memory on the server. Set the new policy as a Managing Policy.

    正确答案:D

  • 第21题:

    单选题
    During OSPF adjacency formation, in what state is a router when it is negotiating to be in charge of the database synchronization process?()
    A

    Init

    B

    2Way

    C

    ExStart

    D

    Exchange


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    An active PowerHA cluster was shutdown from C-SPOC with the "Unmanage Resource Groups" option. Afterthe operation successfully completes, what is the internal state of the cluster manager as shown by the lssrc -ls clstrmgrES command?()
    A

    ST_STABLE

    B

    ST_BARRIER

    C

    ST_CBARRIER

    D

    ST_UNMANAGED


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A cluster using IPAT via IP aliasing has four adapters. Normally there are several resource  groups that have a total of four service IP labels. When two of the adapters fail, what happens?()
    A

     The resource group containing the IP labels changes to an offline state.

    B

     The IP service labels of the failed adapters relocate the surviving adapters.

    C

     Nothing because the resource groups wait for the adapters to become active again.

    D

     The resource groups containing the IP labels of the failed adapters migrate to a backup node.


    正确答案: B
    解析: 暂无解析