The Delivery Leader
The Opportunity Owner
The Solution Designer
The Subject Matter Expert
第1题:
Where is specific information regarding height, width, depth, and weight of a Power Systems server located?()
第2题:
When performing an expert level pre-install Technical & Delivery Assessment (TDA), which team member has the responsibility for assigning, tracking and updating the completion of action items during the TDA process?()
第3题:
An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()
第4题:
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()
第5题:
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
第6题:
What is the correct stage in the sales process for a Pre-Sales Technical & Delivery Assessment (TDA)? ()
第7题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business partner then disengage
Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第8题:
The business partner was required to perform a TDA and failed to do so
The business partner recommended a nonworking configuration
The business partner did not support the customer correctly
The business partner failed to sell Remote Technical Support (RTS)
第9题:
Pre-sale
Post-sale
Pre-install
Post-install
第10题:
The Delivery Leader
The Opportunity Owner
The Solution Designer
The Subject Matter Expert
第11题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第12题:
Before the first solution design meeting with the customer
After the solution design proposal is submitted to manufacturing for review
Once the customer has supplied the solution design specifications to the sales team
After the solution design is completed and before the proposal is submitted to the customer
第13题:
After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()
第14题:
A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()
第15题:
What is the primary purpose of the Technical and Delivery Assessment (TDA)?()
第16题:
An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()
第17题:
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()
第18题:
Identify, assess, and mitigate technical risks.
Verify pricing and gather components for special bid submission.
Verify the proposed solution will fit within the customer's budget.
Review competitive offerings, system performance and delivery schedules.
第19题:
Verification of the expected performance of the new solution.
A document used by IBM manufacturing to build and ship the system solution.
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
A list of actions that are recommended to reduce risk and create a successful implementation.
第20题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business Partner then disengage
Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第21题:
a pre-sale TDA is mandatory
a pre-install TDA is mandatory
a pre-install TDA is not mandatory since it is not FirstIn Customer Location (FICL)
both pre-sale and pre-install TDAs are mandatory
第22题:
A TDA are recommended only for high end hardware and very large or complex business opportunities
A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirements
A TDA will guarantee that the hardware will work in customer’s environment at the volumes projected
A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software
第23题:
the customer alone
the Business Partner
IBM and the customer
the Business Partner and IBM jointly
第24题:
RMF Magic
Capacity Magic
Disk Magic
PerfMon