An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第1题:
IBM电子商务解决方案为()
第2题:
Which of the following provides Fibre Channel over IP and FCIP Tunneling Service for distance extension, which can enable cost-effective and manageable metro and global business continuity solutions?()
第3题:
What aids IBM sales and business partners and facilitates technical collaborations in configuring eServer systems and rack cabinets? The tool is also capable of saving or exporting data in several different formats.()
第4题:
A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers. What is the best document the Business Partner can suggest to accomplish this requirement()
第5题:
Select the IBM resource designed for small-to-medium business segments that helps identify System x server and storage for customers’ specific needs:()
第6题:
An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()
第7题:
A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment. Which of the following will help with a successful implementation?()
第8题:
A customer is looking at an Oracle E-Business solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第9题:
the customer alone
the Business Partner
IBM and the customer
the Business Partner and IBM jointly
第10题:
IBM Standalone Solutions Configuration Tool (SSCT)
IBM Server Proven
IBM System x Reference Sheets (xREF)
IBM Sizing Guides
第11题:
The business partner was required to perform a TDA and failed to do so
The business partner recommended a nonworking configuration
The business partner did not support the customer correctly
The business partner failed to sell Remote Technical Support (RTS)
第12题:
IBM System Advisor Tool
IBM System x and BladeCenter Business Partner Guidebook
Standalone Solutions Configuration Tool (SSCT)
Configuration & Options Guide (COG)
第13题:
By default, who is responsible for firmware and software updates of an SVC solution? ()
第14题:
You have a junior sales representative working with your largest customer, who needs to build an entry System x Server hardware solution. Which IBM resource should the junior sales representative use? ()
第15题:
A Business Partner storage specialist is proposing an IBM System Storage DS5000 solution to aninstalled EMC customer. Which IBM resource should the Business Partner engage to assist withcompetitive sales strategies against EMC?()
第16题:
You have a request to put together IBM System x and blade servers attached to IBM DS4000 Storage: all in a rack. Your customer is also requesting services. What IBM resource will help you put these different products together?()
第17题:
An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()
第18题:
An administrator plans to attach an IBM DS6000 and needs to know if the fibre channel adapter is at the latest firmware level. Which of the following is the fastest way for the administrator to determine the atest supported microcode level ()
第19题:
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
第20题:
The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different LPARs. Who should the technical specialist contact to gain a definitive answer?()
第21题:
the customer
IBM customer engineer
certified IBM Business Partner
IBM Maintenance and Technology Support organization
第22题:
the IBM System Storage DS8000 Interoperability Matrix
the IBM System Storage DS8000 Introduction and Planning Guide
the IBM System Storage DS8000 Host System Attachment Guide
the IBM System Storage DS8000 User’s Guide
第23题:
purchasing customer
IBM Installation Readiness Team
IBM Customer Engineer
IBM Business Partner
第24题:
Because IBM has been brewing this sale for about 10 years.
Because IBM is going to produce mobile phones that have access to the Internet.
Because IBM can enlarge its PC sales with this merger.
Because IBM no longer enjoys any edges in PC making.