Before the first solution design meeting with the customer
After the solution design proposal is submitted to manufacturing for review
Once the customer has supplied the solution design specifications to the sales team
After the solution design is completed and before the proposal is submitted to the customer
第1题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第2题:
The account team designed a p5-570 solution to strategically position the customer for future IBM announcements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()
第3题:
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()
第4题:
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
第5题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第6题:
Identify, assess, and mitigate technical risks.
Verify pricing and gather components for special bid submission.
Verify the proposed solution will fit within the customer's budget.
Review competitive offerings, system performance and delivery schedules.
第7题:
Verification of the expected performance of the new solution.
A document used by IBM manufacturing to build and ship the system solution.
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
A list of actions that are recommended to reduce risk and create a successful implementation.
第8题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第9题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business Partner then disengage
Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第10题:
The Delivery Leader
The Opportunity Owner
The Solution Designer
The Subject Matter Expert
第11题:
during the Technical Delivery and Assessment
during installation of the equipment
prior to delivery of the XIV
during the solution proposal
第12题:
An account team proposal review
An installation planning meeting
A solution design development methodology
A technical inspection of a completed solution design
第13题:
When performing an expert level pre-install Technical & Delivery Assessment (TDA), which team member has the responsibility for assigning, tracking and updating the completion of action items during the TDA process?()
第14题:
What is the primary purpose of the Technical and Delivery Assessment (TDA)?()
第15题:
An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()
第16题:
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()
第17题:
What is the correct stage in the sales process for a Pre-Sales Technical & Delivery Assessment (TDA)? ()
第18题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business partner then disengage
Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第19题:
Design Guide
Cisco Configuration Assistant
Implementation Guide
Small Business Product Guide
Solution Profile
Application Notes
第20题:
The need to involve solution experts is removed
Financial justification of the proposal is enhanced
Time required to design a solution is decreased
Complex solutions are simplified considerably
第21题:
Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570
Designed a p670 because it supports AIX 5.1 partitions
Initially designed a solution supporting AIX 5.1 partitions
Gained customer approval for the final design prior to ordering the system
第22题:
initiation planning analysis design development implementation operations and maintenance
project planning, site assessment risk assessment solution selection and acquisition, testing, and operations
prepare, plan, design, implement operate, and optimize
analysis, design, deployment testing, implementation, and production
presales, project planning, development implementation, operations testing, and operations sign- off
第23题:
Before the first solution design meeting with the customer
After the solution design proposal is submitted to manufacturing for review
Once the customer has supplied the solution design specifications to the sales team
After the solution design is completed and before the proposal is submitted to the customer
第24题:
Customer Engineer
Storage Sales Specialist
Competeline Representative
Field Technical Storage Specialist (pre-sales)