Use the 60 Amp line cords
Change the 100 Amp connector to a 60 Amp circuit
Submit an RPQ to order the p5 590 with 100 Amp power cords
Change the configuration and order the p5 590 with the 100 Amp power cords
第1题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第2题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第3题:
A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()
第4题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第5题:
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()
第6题:
Implement a proxy server to provide multiple sources to one destination
Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two
Purchase a network hub or switch so both p5 570s can connect to the single HMC
Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used
第7题:
The server must be installed into a location with a raised floor for optimum system cooling and cable management.
The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.
The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.
The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.
第8题:
VIO Server
AIX 5.2 ML4
Shared Ethernet Adapter
AIX 5.3 with Advanced Power Virtualization
第9题:
Use the 60 Amp line cords
Change the 100 Amp connector to a 60 Amp circuit
Submit an RPQ to order the p5 590 with 100 Amp power cords
Change the configuration and order the p5 590 with the 100 Amp power cords
第10题:
edit
systeminfo
gpedit.msc
dxdiag
第11题:
The p5 595 would allow for COD
The p5 595 includes the Advanced Power Virtualization hardware and software
The p5 595 is priced the same as the p5 590 given the same number/type of CPUs
The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs
第12题:
A SAN device
First I/O drawer
Any I/O drawer within the main frame
First I/O drawer within the expansion frame
第13题:
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()
第14题:
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
第15题:
Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have just indicated that their large datacenter is already wired for 100 Amp power circuits in the location where the server will be installed. What would be the recommended action?()
第16题:
A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
第17题:
Increase memory
Add more adapters
Increase both processors and adapters
Increase the number of processors by 20 - 30%
第18题:
Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required.
Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required.
Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262.
Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
第19题:
Use the 60 Amp line cords
Change the 100 Amp connector to a 60 Amp circuit
Submit an RPQ to order the p5 590 with 100 Amp power cords
Change the configuration and order the p5 590 with the 100 Amp power cords
第20题:
Add CPU and memory COD so they have room to grow if required
Make the server configuration twice as large as the current requirement
Configure the server for the current capacity requirements
Make the server configuration a little larger than the current capacity requirements
第21题:
A public internet connection
All of the Logical Partitions need to be active
One partition must be configured with Service Authority
A local Repository must be configured prior to the update
第22题:
Upgrade the p690 to a p5 590 server running AIX 5.3
Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
第23题:
Use lquerypv to read the drive
Use lspv and look at PP Size value
Look on the outside of the drive itself
Use bootinfo to find the LTG on the drive
第24题:
New install of AIX
Migrate the 7040-61D
Utilize alt_disk_install
Use the enterprise back up strategy