Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()
第1题:
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
第2题:
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
第3题:
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()
第4题:
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
第5题:
A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()
第6题:
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()
第7题:
A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()
第8题:
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped. What is the most probable cause?()
第9题:
Telnet into the machine and do a shutdown -Fr
Log into ASMI as Administrator and use ASMI menus
Log into the service processor using WebSM and use ASMI menus
Use the off button which is located to the left below the LEDs
第10题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第11题:
Run without recompiling on AIX 5.3
Relink to the 32-bit kernel in order to run the application
Recompile to run on AIX 5.3 because the libraries are in different locations
Recompile 32-bit applications because the compiler flags and versions have changed
第12题:
The cfgmgr command was not run to reconfigure the devices
The machine was not booted into SMS MultiBoot mode after configuration
The machine was not in full system partition mode when the volume was created
The alt_disk_install command was not run with the -O option to remove references in the ODM
第13题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第14题:
After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()
第15题:
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()
第16题:
A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()
第17题:
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()
第18题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第19题:
Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()
第20题:
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
第21题:
The cfgmgr command was not run to reconfigure the devices
The machine was not booted into SMS MultiBoot mode after configuration
The machine was not in full system partition mode when the volume was created
The alt_disk_install command was not run with the -O option to remove references in the ODM
第22题:
POWER5 runs in an SMP mode as default
POWER5 can run in a full system mode the same as the p690
POWER5 can run in full system mode with the purchase of PLM
POWER5 can run in a full system mode, but it is in LPAR mode
第23题:
A CD or DVD with installation media
An internal SCSI adapter in the target LPAR
An Ethernet adapter for access to an FTP server
Advanced Power Virtualization feature of the p5 590