Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partitio

题目

Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()

  • A、When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. 
  • B、V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. 
  • C、When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.  
  • D、V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.

相似考题
更多“Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition”相关问题
  • 第1题:

    One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()

    • A、Two p5 570 16 way 1.9 MHz machines
    • B、One p5 590 32 way 1.65 MHz machines
    • C、One p5 595 32 way 1.65 MHz machines
    • D、Two p5 570 16 way 1.65 MHz machines

    正确答案:D

  • 第2题:

    The technician is working on a system and has determined that the hard drive must be reimaged. However, the customer wants to retain all the data. Which of the following would take the LEAST amount of time to implement?()

    • A、Create a new partition on the hard drive, copy all data to the new partition, reimage the drive, and the old data will be on the new partition and accessible.
    • B、Install a new hard drive, slave the old drive, image the new drive, and show the customer how to access their data on the old drive.
    • C、Upload the data to an external FTP server, reimage the drive, and then restore the data to the newly imaged drive.
    • D、Copy data to a USB connected hard drive, reimage the drive, and then restore the data to the newly imaged drive.

    正确答案:D

  • 第3题:

    Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()

    • A、An administrative VLAN with port 1808
    • B、Port 657 which must remain open to TCP/IP and UDP traffic
    • C、Network addresses are provided by DHCP services on the network
    • D、DHCP on the HMC is required to be on to communicate between LPAR and HMC

    正确答案:B

  • 第4题:

    Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()

    • A、POWER5 runs in an SMP mode as default
    • B、POWER5 can run in a full system mode the same as the p690
    • C、POWER5 can run in full system mode with the purchase of PLM
    • D、POWER5 can run in a full system mode, but it is in LPAR mode

    正确答案:D

  • 第5题:

    Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer plans to use the Advanced Power Virtualization to share their storage, processors, and memory. What considerations and limitations should be reviewed with the customer before the purchase?()

    • A、Resources cannot be shared with an i5 partition when it is put on a pSeries. The i5 partition needs its own 9411-100 tower because of IOP. V5R3 OS or later is required. There is a maximum of two partitions in a 590.
    • B、Resources cannot be shared between partitions when i5/OS is put on a pSeries. The i5 partition needs its own 9411-100 tower because of IOP. i5/OS can be at V5R2 or a V5R3. Currently only one i5 partition is allowed. 
    • C、V5R3 is required for the i5 partitions. Virtual IO Server is not supported for the i5/OS partitions to share storage. Up to 10 i5 partitions per processor are allowed (a maximum of two processors for up to 20 partitions). 
    • D、Processor and memory resources can be shared between AIX 5L, Linux and i5/os partitions. i5/OS needs to be at V5R3, and Virtual IO Server is not supported for the i5/OS partition to share storage. On a 1.65 GHz POWER5 p5 590 there is a maximum of one partition.

    正确答案:C

  • 第6题:

    Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()

    • A、VIO Server
    • B、AIX 5.2 ML4
    • C、Shared Ethernet Adapter
    • D、AIX 5.3 with Advanced Power Virtualization

    正确答案:D

  • 第7题:

    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()

    • A、A public internet connection
    • B、All of the Logical Partitions need to be active
    • C、One partition must be configured with Service Authority
    • D、A local Repository must be configured prior to the update

    正确答案:C

  • 第8题:

    Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()

    • A、Utilize the integrated 10/100/1000 network interface
    • B、Implement Virtual Ethernet to enable inter-partition communication
    • C、Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
    • D、Implement a Point to Point protocol serial communication between the p5 595 serial ports

    正确答案:B

  • 第9题:

    单选题
    Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()
    A

    8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor 

    B

    4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor 

    C

    8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor 

    D

    16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    Which of the following BEST describes the initial process of setting up a new operating system from a CD-ROM? ()
    A

    Format a partition, install device drivers, and install the operating system.

    B

    Create a partition, format the partition, and install the operating system.

    C

    Install the operating system, create a partition, and install device drivers.

    D

    Install the operating system, install device drivers, and create a partition.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    Companycom wants to manage multiple partitions for a p5 590 server using Partition Load Manager (PLM). Some of the partitions are dedicated processors and some of them are shared processors. What information about PLM limitations should be expressed to the customer?()
    A

    All of the partitions can be managed in one group mixing dedicated and shared processors. PLM will move resources in the group as setup in the PLM profiles. 

    B

    PLM handles memory, dedicated and shared processor partitions. All the partitions in a group must be of the same processor type. PLM moves I/O resources between partitions based on PLM policy files. 

    C

    PLM handles memory, dedicated and shared processor partitions. The policy file, once loaded, is static and has no knowledge of workload on the managed partitions. PLM is supported for partitions that are running AIX 5.2 or i5OS. 

    D

    All of the partitions in a group must be the same type, either all dedicated processor partitions or shared processor partitions. One PLM Server can manage multiple groups of partitions. PLM does not move resources between groups.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    Company.com  with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()
    A

    Use alt_disk_install to install AIX on all logical partitions.

    B

    Configure the DVD as a desired resource on all partitions.

    C

    Configure all resources as shared resources between all partitions.

    D

    Create a separate NIM server to manage the installation of all partitions.


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()

    • A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
    • B、Use DLPAR to move resources from the test LPAR to training when training is active
    • C、Install Partition Load Manager to share resources between the test and training environments
    • D、Install Advanced Power Virtualization and then use micro-partitioning for both the test and  training LPARs

    正确答案:D

  • 第14题:

    A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()

    • A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
    • B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
    • C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
    • D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

    正确答案:D

  • 第15题:

    Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()

    • A、8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor 
    • B、4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor 
    • C、8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor 
    • D、16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor

    正确答案:C

  • 第16题:

    A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

    • A、 PowerVM Standard Edition on POWER6 hardware
    • B、 PowerVM Standard Edition with POWER5 hardware 
    • C、 PowerVM Enterprise Edition with POWER6 hardware
    • D、 PowerVM Enterprise Edition with POWER5 hardware

    正确答案:C

  • 第17题:

    Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()

    • A、Daisy chain the unsupported 3rd party storage subsystem devices with the local SCSI disk drive 
    • B、Assuming the 3rd party storage subsystem has AIX support, enable access through a Virtual IO Server 
    • C、Assuming the 3rd party storage subsystem has AIX support, implement the Linux partition within an AIX partition 
    • D、3rd party storage is not an option for p5 570 servers and therefore only IBM disk subsystems can be considered as a solution

    正确答案:B

  • 第18题:

    Companycom wants to manage multiple partitions for a p5 590 server using Partition Load Manager (PLM). Some of the partitions are dedicated processors and some of them are shared processors. What information about PLM limitations should be expressed to the customer?() 

    • A、All of the partitions can be managed in one group mixing dedicated and shared processors. PLM will move resources in the group as setup in the PLM profiles. 
    • B、PLM handles memory, dedicated and shared processor partitions. All the partitions in a group must be of the same processor type. PLM moves I/O resources between partitions based on PLM policy files. 
    • C、PLM handles memory, dedicated and shared processor partitions. The policy file, once loaded, is static and has no knowledge of workload on the managed partitions. PLM is supported for partitions that are running AIX 5.2 or i5OS. 
    • D、All of the partitions in a group must be the same type, either all dedicated processor partitions or shared processor partitions. One PLM Server can manage multiple groups of partitions. PLM does not move resources between groups.

    正确答案:D

  • 第19题:

    Your organization has 5 Mailbox servers and 5 Active directory servers.You need to install a new Mailbox server.During the installation you notice the mailbox database will not mount. What should you do to make sure you can install the mailbox server:()

    • A、Configure all domain controllers as Global Catalog Servers.
    • B、Install the Exchange Server 2010 Administration Tools on a domain controller.
    • C、Force the replication of the AD domain partition between all domain controllers.
    • D、Force the replication of the AD configuration partition between all domain controllers.

    正确答案:D

  • 第20题:

    Which of the following BEST describes the initial process of setting up a new operating system from a CD-ROM? ()

    • A、Format a partition, install device drivers, and install the operating system.
    • B、Create a partition, format the partition, and install the operating system.
    • C、Install the operating system, create a partition, and install device drivers.
    • D、Install the operating system, install device drivers, and create a partition.

    正确答案:B

  • 第21题:

    单选题
    Your organization has 5 Mailbox servers and 5 Active directory servers.You need to install a new Mailbox server.During the installation you notice the mailbox database will not mount. What should you do to make sure you can install the mailbox server:()
    A

    Configure all domain controllers as Global Catalog Servers.

    B

    Install the Exchange Server 2010 Administration Tools on a domain controller.

    C

    Force the replication of the AD domain partition between all domain controllers.

    D

    Force the replication of the AD configuration partition between all domain controllers.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
    A

    A public internet connection

    B

    All of the Logical Partitions need to be active

    C

    One partition must be configured with Service Authority

    D

    A local Repository must be configured prior to the update


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
    A

     Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.

    B

     Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.

    C

     Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.

    D

     Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.


    正确答案: D
    解析: 暂无解析