A CD or DVD with installation media
An internal SCSI adapter in the target LPAR
An Ethernet adapter for access to an FTP server
Advanced Power Virtualization feature of the p5 590
第1题:
When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()
第2题:
A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the seventh LPAR boot device?()
第3题:
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()
第4题:
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
第5题:
A CD or DVD with installation media
An internal SCSI adapter in the target LPAR
An Ethernet adapter for access to an FTP server
Advanced Power Virtualization feature of the p5 590
第6题:
Assign the adapters to a Virtual IO partition
Use the MPIO function included in AIX 5.2
Migrate the application to AIX 5.3 and use the MPIO function
Set up two Virtual IO partitions and attach both partitions to the device
第7题:
A local DVD-ROM drive
A NFS mount on a NIM Master
A SSA disk array and mirror the data
A local tape drive and use DLPAR to move the tape to each LPAR
第8题:
One single port Ethernet adapter
Four dual port Ethernet adapters
Two single port Ethernet adapters
Eight single port Ethernet adapters
第9题:
Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
第10题:
Assign the adapter to an IO Hosting partition
Use AIX 5L affinity to move the application from SUSE to AIX
Use AIX 5.3 drivers to install the adapter in the Linux LPAR
Assign the adapter to an AIX 5.3 partition running Linux Affinity
第11题:
Use lquerypv to read the drive
Use lspv and look at PP Size value
Look on the outside of the drive itself
Use bootinfo to find the LTG on the drive
第12题:
Daisy chain the unsupported 3rd party storage subsystem devices with the local SCSI disk drive
Assuming the 3rd party storage subsystem has AIX support, enable access through a Virtual IO Server
Assuming the 3rd party storage subsystem has AIX support, implement the Linux partition within an AIX partition
3rd party storage is not an option for p5 570 servers and therefore only IBM disk subsystems can be considered as a solution
第13题:
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()
第14题:
A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()
第15题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第16题:
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()
第17题:
DLPAR functions are not available for cloned partitions
The new partition has the same node number as the original LPAR
Additional filesets need to be reinstalled after the alt_disk_install cloning
The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured
第18题:
An additional 7311-D10 drawer
An adapter to boot off a SAN device
An additional disk to the media bay
Two disks to the internal configuration
第19题:
The LPAR Configuration backup is corrupt
The LPAR Configuration has been altered using DLPAR
The LPAR Configuration backup was performed on a different HMC
The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
第20题:
Use shared memory and semaphores to transfer the data to the TSM LPAR
Provide gigabit Ethernet adapters in each LPAR and run a crossover cable
Create a Virtual Ethernet between the production server and the TSM LPARs
Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs
第21题:
Install the base AIX from 5.2 media and then install the mksysb overtop.
Mount the tape and use the tar command to install AIX and the rest of the contents of the rootvg.
Insert the mksysb tape and a 5.2 base media CD and then boot to maintenance mode and initiate the install.
Install AIX 5.2 from base media and then perform an update_all install from the mksysb tape of the original machine.
第22题:
POWER5 runs in an SMP mode as default
POWER5 can run in a full system mode the same as the p690
POWER5 can run in full system mode with the purchase of PLM
POWER5 can run in a full system mode, but it is in LPAR mode
第23题:
A CD or DVD with installation media
An internal SCSI adapter in the target LPAR
An Ethernet adapter for access to an FTP server
Advanced Power Virtualization feature of the p5 590
第24题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs