第1题:
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()
第2题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第3题:
A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers. What is the best document the Business Partner can suggest to accomplish this requirement()
第4题:
A customer has the need for performance monitoring of an IBM System Storage DS8000. Which product does the customer need()
第5题:
An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()
第6题:
A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()
第7题:
TS3500 Redbook
TS3500 Operators Manual
Solution Assurance Product Review (SAPR) Guide
TS3500 Product Installation and Planning Guide
第8题:
the IBM System Storage DS8000 Interoperability Matrix
the IBM System Storage DS8000 Introduction and Planning Guide
the IBM System Storage DS8000 Host System Attachment Guide
the IBM System Storage DS8000 User’s Guide
第9题:
The business partner was required to perform a TDA and failed to do so
The business partner recommended a nonworking configuration
The business partner did not support the customer correctly
The business partner failed to sell Remote Technical Support (RTS)
第10题:
a pre-sale TDA is mandatory
a pre-install TDA is mandatory
a pre-install TDA is not mandatory since it is not FirstIn Customer Location (FICL)
both pre-sale and pre-install TDAs are mandatory
第11题:
capacity above 500 TB
first in customer location
a new model has been released
sold without implementation service
第12题:
System Storage Productivity Center
Tivoli Storage Productivity Center for Data
Tivoli Storage Productivity Center for Disk
Tivoli Storage Productivity Center for Fabric
第13题:
A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()
第14题:
A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()
第15题:
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
第16题:
An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()
第17题:
An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()
第18题:
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
第19题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business partner then disengage
Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第20题:
purchasing customer
IBM Installation Readiness Team
IBM Customer Engineer
IBM Business Partner
第21题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business Partner then disengage
Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第22题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第23题:
the customer alone
the Business Partner
IBM and the customer
the Business Partner and IBM jointly
第24题:
disaster recovery strategy
the number of IOPS required
the capacity of each hard drive
how the database will be backed up