during the Technical Delivery and Assessment
during installation of the equipment
prior to delivery of the XIV
during the solution proposal
第1题:
A Business Partner storage specialist is proposing an IBM System Storage DS5000 solution to aninstalled EMC customer. Which IBM resource should the Business Partner engage to assist withcompetitive sales strategies against EMC?()
第2题:
A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity. What must be verified by the Business Partner during the visit to the computer room()
第3题:
A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()
第4题:
An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()
第5题:
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
第6题:
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()
第7题:
verify configuration
conduct pre-install TDA
complete physical planning
verify the solution meets requirements
第8题:
LPAR capacity planning
logical volume configuration
data migration process
audit hosts for HBA worldwide port names
第9题:
two IBM System Storage DS8100 systems
one IBM System Storage DS8300 with LPAR
two IBM System Storage DS6800 systems in a single rack
one IBM System Storage DS6800
第10题:
purchasing customer
IBM Installation Readiness Team
IBM Customer Engineer
IBM Business Partner
第11题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第12题:
the space for the upgrade to a DS8700
the space on the left of the DS8000 for an expansion frame
the space on the right of the DS8000 for an expansion frame
the space to install additional DDMs in the base frame
第13题:
A customer recently installed new SAN with an IBM System Storage DS8300 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()
第14题:
A customer is considering the purchase of an XIV system to leverage thin provisioning. They are concerned that their application will use all available space during formatting, which will remove any thin provisioning benefits. What should the storage specialist discuss with the customer?()
第15题:
An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()
第16题:
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution best meets the specified requirements()
第17题:
A customer RFP requires installation of an open system SAN and migration of 40 TB currently residing on ten UNIX servers (on internal server disk). The Service Level Agreement (SLA) requires no more than five minutes per week of planned downtime for backup. Which IBM System Storage solution is the most cost effective()
第18题:
Tivoli Storage Manager
Total Productivity Productivity Center for Disk
Total Productivity Center Basic Edition
Total Storage Productivity Center Standard Edition
第19题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business partner then disengage
Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第20题:
the possibility of changing the application so this no longer happens
with the XIV system's SATA basedapproach, storage costs are so low that over-provisioning is not an issue
the XIV system has immediate zero page reclamation features that will immediately return the volume to its original size
the XIV system has a white space reclamation feature that will return the volume to its original thin provisioned size over time
第21题:
Competeline
Executive Briefing Center
Competitive Benchmark Center
Field Technical Support Specialist (FTSS)
第22题:
Turn over current design to Techline to create configurations
Perform knowledge transfer of design requirements to Business Partner then disengage
Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA)
Work with business partner to engage Techline to create configurations
第23题:
Tivoli Storage Manager
Tivoli Storage Productivity Center for Disk
Tivoli Storage Productivity Center Basic Edition
Tivoli Storage Productivity Center Standard Edition
第24题:
during the Technical Delivery and Assessment
during installation of the equipment
prior to delivery of the XIV
during the solution proposal