单选题A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  T

题目
单选题
A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  They are also concerned about the under-utilization of their IT resources.  What should the pSeries technical specialist recommend to address this challenge?()
A

Install a p615 per application.

B

Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.

C

Install the appropriate solution once the requirements are understood.

D

Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.


相似考题
参考答案和解析
正确答案: D
解析: 暂无解析
更多“单选题A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  T”相关问题
  • 第1题:

    A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()

    • A、One 7311-D20 drawer
    • B、Two 7311-D20 drawers
    • C、Two 7311-D10 drawers
    • D、One 7311-D10 drawers

    正确答案:B

  • 第2题:

    A customer’s SAN environment has undergone significant growth over the past two years. They have also suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus.  Which tool should the storage specialist suggest()

    • A、Tivoli Storage Productivity Center Fabric Manager
    • B、Tivoli Storage Productivity Center Basic Edition
    • C、IBM TivoliNetView
    • D、Disk Magic

    正确答案:B

  • 第3题:

    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()

    • A、A p650 running AIX v5.3
    • B、A p5-550 running AIX v5.3
    • C、A p5-570 running Advanced POWER Virtualization
    • D、Multiple rack-mounted p615s running dynamic LPAR

    正确答案:C

  • 第4题:

    A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()

    • A、The p5-570 would save rack space over a pair of p5-550 servers.
    • B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.
    • C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.
    • D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.

    正确答案:B

  • 第5题:

    A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()

    • A、Configure a 2 node x3950 X5 
    • B、Customer needs a System p server to support Oracle applications 
    • C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing 
    • D、Configure a system that meets the minimum requirements

    正确答案:C

  • 第6题:

    单选题
    A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
    A

    Configure a 2 node x3950 X5 

    B

    Customer needs a System p server to support Oracle applications 

    C

    Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing 

    D

    Configure a system that meets the minimum requirements


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
    A

    The technical support specialist has completed a UNIX course at college.

    B

    The technical specialist has supported several similar projects and has earned an IBM AIX certification.

    C

    The technical support specialist’s company sells $3M of UNIX computer systems every year.

    D

    The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    A customer wishes to replace 12 older small UNIX systems.  They are running out of floor space in their data center and any solution must take this into consideration.  Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()
    A

    A p650 running AIX v5.3

    B

    A p5-550 running AIX v5.3

    C

    A p5-570 running Advanced POWER Virtualization

    D

    Multiple rack-mounted p615s running dynamic LPAR


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer has Windows servers and applications that use block I/O. The customer cannot affordthe cost of a fibre channel infrastructure but still requires shared storage. Which configurationmeets these requirements at the lowest cost?()
    A

    iSCSI HBAs and N3400

    B

    MicrosoftiSCSI initiator and N3400

    C

    MicrosoftiSCSI initiator and DS3400

    D

    SAN04B-R multi-protocol router and DS3400


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications.  Each partition requires two of the following:  OS boot drives, fiber adapters, and gigabit Ethernet adapters.  The customer has an HMC with an available serial port.  In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()
    A

    One 7311-D20 drawer

    B

    Two 7311-D20 drawers

    C

    Two 7311-D10 drawers

    D

    One 7311-D10 drawers


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A new IBM x 3650 M3 customer has experienced support issues with problem resolution from their previous vendor. The biggest problem was with Microsoft applications failing intermittently. Which of the following IBM products covers this issue?()
    A

    IBM Hardware Standard Warranty

    B

    Techline

    C

    Tivoli Problem Resolution Manager(TPRM)

    D

    RTS


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  They are also concerned about the under-utilization of their IT resources.  What should the pSeries technical specialist recommend to address this challenge?()
    A

    Install a p615 per application.

    B

    Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.

    C

    Install the appropriate solution once the requirements are understood.

    D

    Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer has an 8-way p650 running an application for about 200 users.  In the past, the requiredamount of memory and processors has increased proportionally to the number of new users.  The customer plans to increase users by 10% each year for the next three years.  Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()

    • A、Disk usage will increase in proportion to memory.
    • B、The new database will demand much more memory.
    • C、Memory demand will increase 10% for the next year.
    • D、Processor demand will increase about 10% for the next year.

    正确答案:B

  • 第14题:

    A new IBM x 3650 M3 customer has experienced support issues with problem resolution from their previous vendor. The biggest problem was with Microsoft applications failing intermittently. Which of the following IBM products covers this issue?()

    • A、IBM Hardware Standard Warranty
    • B、Techline
    • C、Tivoli Problem Resolution Manager(TPRM)
    • D、RTS

    正确答案:D

  • 第15题:

    A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()

    • A、The technical support specialist has completed a UNIX course at college.
    • B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.
    • C、The technical support specialist’s company sells $3M of UNIX computer systems every year.
    • D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.

    正确答案:B

  • 第16题:

    A System x sales specialist is creating a proposal for a Unix-installed account. The customer is looking to migrate several business-critical applications onto Linux running on Intel.  Which of the following should help IBM meet the customer’s requirements?()

    • A、Propose VMware with Linux on Intel as a solution.
    • B、Provide a special bid on the System x servers.
    • C、Include migration services within the proposal.
    • D、Provide a warranty offering with guaranteed fix levels.

    正确答案:C

  • 第17题:

    A customer has several small AIX applications that are expected to grow over the next several years.  The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth.  They are also concerned about the under-utilization of their IT resources.  What should the pSeries technical specialist recommend to address this challenge?()

    • A、Install a p615 per application.
    • B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
    • C、Install the appropriate solution once the requirements are understood.
    • D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.

    正确答案:D

  • 第18题:

    单选题
    A customer’s SAN environment has undergone significant growth over the past two years. They have also suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus.  Which tool should the storage specialist suggest()
    A

    Tivoli Storage Productivity Center Fabric Manager

    B

    Tivoli Storage Productivity Center Basic Edition

    C

    IBM TivoliNetView

    D

    Disk Magic


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    A customer SAN environment has undergone significant growth over the past two years. They havealso suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus.    Which tool should the storage specialist suggest()
    A

    Visio

    B

    TPC Basic Edition

    C

    IBM Tivoli NetView

    D

    Fabric Manager


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is in the initial stages of implementing a server consolidation project.  The Information Technology staff has identified several Microsoft Windows servers that are running single applications on older hardware and averaging under 20% utilization.  Part of their server consolidation goal is to lower the number of servers, decrease the operating system license cost, and increase utilization per server.  Which of the following IBM Director extensions could be used to satisfy all of these requirements?()
    A

    Aurema Application Workload Manager

    B

    Remote Deployment Manager

    C

    Virtual Machine Manager

    D

    Capacity Manager


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A System x sales specialist is creating a proposal for a Unix-installed account. The customer is looking to migrate several business-critical applications onto Linux running on Intel.  Which of the following should help IBM meet the customer’s requirements?()
    A

    Propose VMware with Linux on Intel as a solution.

    B

    Provide a special bid on the System x servers.

    C

    Include migration services within the proposal.

    D

    Provide a warranty offering with guaranteed fix levels.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has many RS/6000s and POWER4 systems running different AIX applications.  What should the customer do to best position themselves for the migration to POWER5?()
    A

    Upgrade OS to AIX 5.2.

    B

    Implement Micro-Partitioning.

    C

    Upgrade HMC to support POWER5.

    D

    Install Partition Load Manager.


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs.  The current applications are certified on AIX 5.2 but not yet on AIX 5.3.  The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()
    A

    The p5-570 would save rack space over a pair of p5-550 servers.

    B

    The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.

    C

    The p5-570 can only be upgraded to 64GB of RAM without replacing memory.

    D

    The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A customer has implemented several IBM AIX systems over the past several years and feels comfortable with their AIX skills.  They are planning to implement their first HACMP cluster of two p5-570s.  Which of the following should be included in the IBM proposal?()
    A

    HACMP Hardware Services

    B

    p5-570 differences update

    C

    HACMP SmoothStart Services

    D

    AIX installation education


    正确答案: B
    解析: 暂无解析