单选题A customer wants to run a Cluster 1600 configuration with multiple p655 servers.  They are using the new High Performance Switch for the high-speed interconnection between nodes.  Which of the following is the only supported cluster management software

题目
单选题
A customer wants to run a Cluster 1600 configuration with multiple p655 servers.  They are using the new High Performance Switch for the high-speed interconnection between nodes.  Which of the following is the only supported cluster management software?()
A

CSM

B

PSSP

C

GPFS

D

HACMP


相似考题
更多“单选题A customer wants to run a Cluster 1600 configuration with multiple p655 servers.  They are using the new High Performance Switch for the high-speed interconnection between nodes.  Which of the following is the only supported cluster management software”相关问题
  • 第1题:

    A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

    • A、operator training
    • B、cache size of the two clusters
    • C、fibre bandwidth capability between the sites
    • D、number of stacked tape drives attached to each cluster

    正确答案:C

  • 第2题:

    A customer is putting together a high-performance computing cluster of p655 nodes.  They need a total of 48 processors and want to get the best performance possible out of those systems.  They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf.  Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()

    • A、Twelve 4-way p655 nodes and add more as needed
    • B、Six 8-way p655 nodes and add more as needed
    • C、Six 4-way p655 nodes with four processors CoD on each node in case of growth
    • D、Three 8-way p655 nodes with eight processors CoD on each node in case of growth

    正确答案:A

  • 第3题:

    A customer wants to implement a clustered database solution on their existing x445 servers.  A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards.  Which of the following best satisfies their requirements?()

    • A、Novell NetWare Cluster Services
    • B、Red Hat Enterprise Linux Cluster Suite
    • C、Microsoft Windows 2003 Server with MSCS
    • D、Microsoft Windows 2003 Enterprise Edition

    正确答案:B

  • 第4题:

    You are the network administrator for your company. The network consists of a single Active Directory domain. All computers on the network are members of the domain.   You administer a four-node Network Load Balancing cluster. All nodes run Windows Server 2003. The cluster has converged successfully. You use Network Load Balancing Manager on the default host to configure all nodes of the cluster.   The nodes have a single network adapter and are connected to the same switching hub device.   Administrators of non-cluster servers that are connected to the same switching hub device report that their servers receive traffic that is destined for the cluster nodes. Receiving this additional network traffic impairs the network performance of the non-cluster servers.   You need to ensure that traffic destined for only the cluster nodes is not sent to all ports of the switching hub device.  You do not want to move the cluster to another switching hub device.   What should you do? ()

    • A、 On one node, run the nlb.exe reload command.
    • B、 On each node, run the wlbs.exe drainstop command.
    • C、 Use Network Load Balancing Manager to enable Internet Group Management Protocol (IGMP) support on the cluster.
    • D、 Use Network Load Balancing Manager to add a second cluster IP address.

    正确答案:C

  • 第5题:

    Certkiller .com boosts a two-node Network Load Balancing cluster which is called web. CK1 .com. The purpose of this cluster is to provide load balancing and high availability of the intranet website only. With monitoring the cluster, you discover that the users can view the Network Load Balancing cluster in their Network Neighborhood and they can use it to connect to various services by using the name web. CK1 .com.  You also discover that there is only one port rule configured for Network Load Balancing cluster.  You have to configure web. CK1 .com NLB cluster to accept HTTP traffic only.  Which two actions should you perform to achieve this objective()

    • A、Create a new rule for TCP port 80 by using the Network Load Balancing Cluster console
    • B、Run the wlbs disable command on the cluster nodes
    • C、Assign a unique port rule for NLB cluster by using the NLB Cluster console
    • D、Delete the default port rules through Network Load Balancing Cluster console

    正确答案:A,D

  • 第6题:

    单选题
    A customer is interested in using two Power 550 servers to implement a new two node cluster. The cluster willbe using SAN attached disk for shared storage and will be attached to one IP network. Which of the followingadapter configurations will meet the customer requirements while reducing single points of failure?()
    A

    A

    B

    B

    C

    C

    D

    D


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    An administrator has had a request from the data center for method to monitor the status of an  HACMP cluster. The monitoring software environment currently used is not compatible with SNM at this time, and there is not time to crate a new tool. There is also a restriction that the data center personnel not be allowed to login to the HACMP cluster nodes. What method will provide the solution for customer?()
    A

     The clstat.cgi program will provide a solution.

    B

     The customer must install Tivoli with the HACMP plugin for monitoring the cluster.

    C

     The clinfo program included in the HACMP distribution will solve the monitoring issues.

    D

     Customize the cluster to send error notifications for every event to an email at the network control center.


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    You add a Windows Server 2008 R2 server with the Hyper-V role installed to an existing Hyper-V failover cluster.  After you move a virtual machine (VM) to the new cluster node, Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 reports the status of the VM as Unsupported Cluster Configuration. You need to be able to manage the VM by using VMM. What should you do?()
    A

    Disable TCP Chimney Offload on the new cluster nodes network adapters

    B

    Disable the TCP/IP Offload Engine (TOE) on the new cluster nodes network adapters.

    C

    Move the VM configuration file to a local storage device, and update the pointer to the file.

    D

    Update the virtual networking configuration of the new cluster node to match the virtual networking configuration of the original cluster nodes.


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer is deploying a new Junos Pulse Access Control Service and has completed the initial boot configuration as prompted using a serial connection. The customer now wants to complete the rest of the configuration using the admin GUI.Into which port on the Junos Pulse Access Control Service should the customer plug the network cable to enable access to the admin GUI?()
    A

    the internal interface

    B

    the external interface

    C

    the management interface

    D

    the console interface


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A cluster administrator wants to create a snapshot backup of the cluster. Which smit menu can be used to dothis?()
    A

    Extended Configuration

    B

    System Management (C-SPOC)

    C

    Problem Determination Tools

    D

    Initialization and Standard Configuration


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    A customer wants to implement a clustered database solution on their existing x445 servers.  A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards.  Which of the following best satisfies their requirements?()
    A

    Novell NetWare Cluster Services

    B

    Red Hat Enterprise Linux Cluster Suite

    C

    Microsoft Windows 2003 Server with MSCS

    D

    Microsoft Windows 2003 Enterprise Edition


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    You have a Windows Server 2008 R2 Hyper-V failover cluster with a single iSCSI logical unit number (LUN) and one highly available virtual machine (HAVM). You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You monitor the environment by using Microsoft System Center Operations Manager 2007 R2. You configure a new virtual machine (VM) by deploying a VHD from the VMM library and placing the VHD on the existing iSCSI LUN. You create a HAVM configuration, and you attach the VHD to the configuration. VMM reports the status of the VMs as Unsupported Cluster Configuration. You need to be able to manage the VMs by using VMM. What should you do?()
    A

    Move the VHD of one HAVM to a new iSCSI LUN.

    B

    Move the VHD of one HAVM to the system volume of a cluster node.

    C

    Configure Performance and Resource Optimization (PRO) on the Windows Server 2008 R2 cluster nodes.

    D

    Configure Windows System Resource Manager (WSRM) on the Windows Server 2008 R2 cluster nodes.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A customer wants to run a Cluster 1600 configuration with multiple p655 servers.  They are using the new High Performance Switch for the high-speed interconnection between nodes.  Which of the following is the only supported cluster management software?()

    • A、CSM
    • B、PSSP
    • C、GPFS
    • D、HACMP

    正确答案:A

  • 第14题:

    A cluster administrator wants to create a snapshot backup of the cluster. Which smit menu can be used to dothis?()

    • A、Extended Configuration
    • B、System Management (C-SPOC)
    • C、Problem Determination Tools
    • D、Initialization and Standard Configuration

    正确答案:A

  • 第15题:

    Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()

    • A、ATM
    • B、Ethernet
    • C、SP Switch2
    • D、Fibre Channel

    正确答案:B

  • 第16题:

    You add a Windows Server 2008 R2 server with the Hyper-V role installed to an existing Hyper-V failover cluster.  After you move a virtual machine (VM) to the new cluster node, Microsoft System Center Virtual Machine Manager (VMM) 2008 R2 reports the status of the VM as Unsupported Cluster Configuration. You need to be able to manage the VM by using VMM. What should you do?()

    • A、Disable TCP Chimney Offload on the new cluster nodes network adapters
    • B、Disable the TCP/IP Offload Engine (TOE) on the new cluster nodes network adapters.
    • C、Move the VM configuration file to a local storage device, and update the pointer to the file.
    • D、Update the virtual networking configuration of the new cluster node to match the virtual networking configuration of the original cluster nodes.

    正确答案:D

  • 第17题:

    You have a Windows Server 2008 R2 Hyper-V failover cluster with a single iSCSI logical unit number (LUN) and one highly available virtual machine (HAVM). You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You monitor the environment by using Microsoft System Center Operations Manager 2007 R2. You configure a new virtual machine (VM) by deploying a VHD from the VMM library and placing the VHD on the existing iSCSI LUN. You create a HAVM configuration, and you attach the VHD to the configuration. VMM reports the status of the VMs as Unsupported Cluster Configuration. You need to be able to manage the VMs by using VMM. What should you do?()

    • A、Move the VHD of one HAVM to a new iSCSI LUN.
    • B、Move the VHD of one HAVM to the system volume of a cluster node.
    • C、Configure Performance and Resource Optimization (PRO) on the Windows Server 2008 R2 cluster nodes.
    • D、Configure Windows System Resource Manager (WSRM) on the Windows Server 2008 R2 cluster nodes.

    正确答案:A

  • 第18题:

    单选题
    A customer is putting together a high-performance computing cluster of p655 nodes.  They need a total of 48 processors and want to get the best performance possible out of those systems.  They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf.  Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()
    A

    Twelve 4-way p655 nodes and add more as needed

    B

    Six 8-way p655 nodes and add more as needed

    C

    Six 4-way p655 nodes with four processors CoD on each node in case of growth

    D

    Three 8-way p655 nodes with eight processors CoD on each node in case of growth


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    You are the network administrator for your company. The network consists of a single Active Directory domain. All computers on the network are members of the domain.   You administer a four-node Network Load Balancing cluster. All nodes run Windows Server 2003. The cluster has converged successfully. You use Network Load Balancing Manager on the default host to configure all nodes of the cluster.   The nodes have a single network adapter and are connected to the same switching hub device.   Administrators of non-cluster servers that are connected to the same switching hub device report that their servers receive traffic that is destined for the cluster nodes. Receiving this additional network traffic impairs the network performance of the non-cluster servers.   You need to ensure that traffic destined for only the cluster nodes is not sent to all ports of the switching hub device.  You do not want to move the cluster to another switching hub device.   What should you do? ()
    A

     On one node, run the nlb.exe reload command.

    B

     On each node, run the wlbs.exe drainstop command.

    C

     Use Network Load Balancing Manager to enable Internet Group Management Protocol (IGMP) support on the cluster.

    D

     Use Network Load Balancing Manager to add a second cluster IP address.


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A customer wants to run a Cluster 1600 configuration with multiple p655 servers.  They are using the new High Performance Switch for the high-speed interconnection between nodes.  Which of the following is the only supported cluster management software?()
    A

    CSM

    B

    PSSP

    C

    GPFS

    D

    HACMP


    正确答案: D
    解析: 暂无解析

  • 第21题:

    多选题
    Certkiller .com boosts a two-node Network Load Balancing cluster which is called web. CK1 .com. The purpose of this cluster is to provide load balancing and high availability of the intranet website only. With monitoring the cluster, you discover that the users can view the Network Load Balancing cluster in their Network Neighborhood and they can use it to connect to various services by using the name web. CK1 .com.  You also discover that there is only one port rule configured for Network Load Balancing cluster.  You have to configure web. CK1 .com NLB cluster to accept HTTP traffic only.  Which two actions should you perform to achieve this objective()
    A

    Create a new rule for TCP port 80 by using the Network Load Balancing Cluster console

    B

    Run the wlbs disable command on the cluster nodes

    C

    Assign a unique port rule for NLB cluster by using the NLB Cluster console

    D

    Delete the default port rules through Network Load Balancing Cluster console


    正确答案: A,B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
    A

    operator training

    B

    cache size of the two clusters

    C

    fibre bandwidth capability between the sites

    D

    number of stacked tape drives attached to each cluster


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()
    A

    Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the cluster

    B

    Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.

    C

    Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original cluster

    D

    Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()
    A

    ATM

    B

    Ethernet

    C

    SP Switch2

    D

    Fibre Channel


    正确答案: A
    解析: 暂无解析