Who recommended the memory purchase?
Have more users been added since the memory purchase?
Why were additional CPUs not ordered at the same time as the memory?
Did a performance analysis of peak periods show a memory bottleneck?
第1题:
A customer is looking for a low-cost pSeries solution. The pSeries technical specialist is recommending several p650 Express Configurations. When reviewing the options with the customer, the pSeries technical specialist should emphasize which of the following limitations?()
第2题:
Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?()
第3题:
A customer has purchased a triple channel memory kit containing three DDR3 RAM modules. Theserver the RAM is intended for only has a dual channel capable motherboard. Which of the following is the BEST action to perform?()
第4题:
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()
第5题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第6题:
Who recommended the memory purchase?
Have more users been added since the memory purchase?
Why were additional CPUs not ordered at the same time as the memory?
Did a performance analysis of peak periods show a memory bottleneck?
第7题:
Service Processor
Service Director
Inventory Scout Services
Service Focal Point
第8题:
Double the number of processors.
Double the number of memory DIMMs.
Double the number of network adapters.
Double the number of SCSI buses and disks.
第9题:
Some Express Configurations limit the amount of maximum memory at order time.
The customer must meet minimum system requirements to obtain Express Configuration pricing.
The Express Configurations offer less than the maximum number of processors.
The Express Configurations are only offered through the QuickShip Program.
第10题:
Server forms condensation
Server will not POST
Server’s services will not start
Server response times are slow due to temperature change
第11题:
The technician should have asked the customer to slow down and allow for a response to a few of the matters brought up in discussion.
The technician should have allowed the customer to finish completely, and then return to the customer’s first point to build a structured discussion.
The technician should have transferred the call to a supervisor, as the supervisor is better trained to handle such customers.
The technician should have only asked closed-ended questions so the customer could not elaborate on the issues and the technician could troubleshoot the issue.
第12题:
HMC
DVD-ROM
Tape drive
Network switch
第13题:
The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()
第14题:
A customer calls in, talking constantly without allowing time for the technician to answer or ask questions. The technician decides to place the customer on hold to work on another issue and misses what the customer’s problem was. When the customer is finished explaining the issue, the technician asks the customer to summarize the problem again, which angers the customer. How could the technician have better handled the situation to avoid such a confrontation?()
第15题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第16题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第17题:
You work as a database administrator for Supportcenter.cn. In a production environment, users complain about the slow response time when accessing the database. You have not optimized the memory usage of the Oracle instance and you suspect the problem to be with the memory. To which type of object would you refer to determine the cause of the slow response?()
第18题:
Is there a need for a PKI Management System?
Is there a need for end-to-end encryption?
Do they currently have a Kerberos domain in place?
Which clients are installed on their desktops -- SSH, Telnet or both?
第19题:
IBM Techline
IBM Supportline
IBM Software Distribution
IBM Hardware Support
第20题:
Install only two modules as the RAM has to be installed in pairs
Purchase one additional RAM module to make it even. Three modules will function as triplechannel and the additional module will be for parity
Purchase dual channel memory. The triple channel memory may be incompatible with theserver motherboard
Install the RAM.Two modules will perform as dual channel and one as single channel
第21题:
TSM
PSSP
WebSM
LoadLeveler
第22题:
Request an extension because 48 hours will not be enough time to propose an appropriate solution.
Ask the customer for a call to learn more about their needs and respond to their request with a complete solution.
Use the configuration guide or spreadsheet configurator to assemble server configurations that meet the specification, and then look for the lowest price.
Contact the IBM Client Representative for this account and ask for assistance in setting up a meeting with the technical decision maker of the prospective customer.
第23题:
Recommend the customer call EMC.
Recommend the customer call IBM hardware support.
Recommend the customer contact SupportLine.
Recommend the customer re-creates the volume groups.
第24题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager