A customer has a p650 with a write-intensive database application. Recently the order entry team has complained about unusually slow response times. There have been no complaints from any other departments. Which of the following actions would most likely address the problem?()
第1题:
A storage specialist is assessing a customer’s tape backup environment. Which of the following questions would be the most appropriate question to identify the customer’s environment?()
第2题:
A System p administrator needs to document system changes that have occurred recently. The company has a policy of making all possible changes via the smit interface. Which of the following files would show the commands that have been performed from within smit and their resulting output()
第3题:
An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()
第4题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第5题:
When a staging server is used as an environment for testing new data in a default WebSphere Commerce installation, which of the following are true about the staging server?()
第6题:
A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
第7题:
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()
第8题:
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
第9题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第10题:
Which statement is correct about a Routing Policy term?()
第11题:
A term must contain a from statement.
A term acts like if and then statements.
The most specific term has precedence.
Terms can be written in any order to achieve the same behavior.
第12题:
A solution sizing questionnaire
Verify the customer has the proper racks
A Technical Delivery Assessment
Verify the customer has enough cooling in the computer room
第13题:
Due to slow response times, a customer purchased additional memory. After the memory was installed,response time was not improved. They complained to the pSeries technical specialist. Which of the following questions should be asked of this customer?()
第14题:
The system administrator has been getting complaints about slow performance from the server. After running vmstat the administrator notices average readings that show the free list (fre) approaching zero, as well as page-in (pi) and page-out (po) values to be high. Furthermore, the applications running are essential to daily business operations. Which of the following recommendations would provide the best overall improvement?()
第15题:
A company needs additional storage for a block I/O based database application. The application has low I/O bandwidth requirements across the campus. The customer has a TCP/IP infrastructure and is interested in low-cost products that are compatible with its environment. Which technology is most appropriate for this customer?()
第16题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第17题:
The client team tends to bring the pSeries technical specialist in very late in the process. This has caused several problems where the specialist has had to correct some misunderstandings about the technology. The specialist is getting very frustrated and would like to avoid these misunderstandings in future. What would be the most appropriate way to handle this?()
第18题:
Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()
第19题:
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
第20题:
A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()
第21题:
A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()
第22题:
Increase physical disk
Increase number of CPU’s
Increase physical memory
Increase number of servers
第23题:
/smit.log
/smit.script
/var/log/smit.log
/.history