x445 with four Xeon MP processors and 8GB of memory
x445 with four Xeon MP processors and 16GB of memory in a single SMP module
x445 with four Xeon DP processors and 16GB of memory in a single SMP module
x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
第1题:
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()
第2题:
A customer needs a 2-way Xeon system today but plans on expanding to a 4-way early next year. The customer is looking to limit the initial costs as much as possible but may not be as budget constrained next year. Which of the following is the best solution to all the customer’s needs?()
第3题:
A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2. Which of the following virtualization technologies can be used?()
第4题:
A customer wants to implement a clustered database solution on their existing x445 servers. A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards. Which of the following best satisfies their requirements?()
第5题:
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
第6题:
x3850 X5
x3550 M3
HX5
x3650 M3
第7题:
Consider two servers for redundancy and failover
Web content static or dynamic information
Processor utilization of the existing web servers
SCSI orFibre Channel storage solution
第8题:
DS3500 with SAS Host Connection
DS3500 withiSCSI Host Connection
DS3500 with FC Connection
DS5020
第9题:
TSM
PSSP
WebSM
LoadLeveler
第10题:
An x445 with 2 Xeon DP processors. Plan on adding 2 more Xeon DP processors next year.
An x445 with 2 Xeon MP processors. Plan on adding 2 more Xeon MP processors next year.
An x366 with 2 Xeon MP processors. Plan on adding 2 more Xeon MP processors next year.
An x366 with 2 Xeon DP processors. Plan on adding 2 more Xeon DP processors next year.
第11题:
8-way x445 with Microsoft Windows Server 2003 Standard Edition
8-way x445 with Microsoft Windows Server 2003 Datacenter Edition
8-way x445 with Microsoft Windows Server 2003 Enterprise Edition
16-way x445 with VMWare ESX with SMP and Windows Server 2003 Standard Edition VMs
第12题:
x3655
x3950 M2
x3755
x3650 M3
第13题:
A customer needs a new database server. The database application has a high memory overhead but does not benefit from 8-way processing. They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory. Which of the following will satisfy the customer’s requirements?()
第14题:
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()
第15题:
A retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere. Which of the following should be discussed with this customer?()
第16题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第17题:
DLPAR
Micro-Partitioning
Virtual Storage
Virtual Ethernet
第18题:
Two p670 servers
Four p650 servers
Two p5-570 servers
Four p5-550 servers
第19题:
x445 with four Xeon DP processors and 16GB of memory in a single SMP module
x445 with four Xeon MP processors and 16GB of memory in a single SMP module
x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory
第20题:
SuSE Linux Enterprise 9
Red Hat Linux Advanced Server 3
Microsoft Windows 2003 Server Web Edition
Microsoft Windows 2003 Server Standard Edition
第21题:
What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第22题:
Is rack space an issue?
Is there a high cache-hit ratio?
Is this a mission-critical application?
Are there plans to expand the memory to 8GB in the future?
第23题:
Dynamic LPAR
Workload Manager
Partition Load Manager