A DS4300 Turbo with Fibre Attached Tape Library
A DS4500 with EXP700’s and Fibre Attached Tape Library
A DS4500 with EXP710’s and Fibre Attached Tape Library
A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library
第1题:
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()
第2题:
A customer has a mixed Dell and IBM server environment. They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers. Which TWO features of IBM Director will be an advantage for this customer?()
第3题:
A medium-sized company with 500 employees has a rapidly growing storage infrastructure with clustered mail, database, and file and print core business applications running on six servers. Using current direct attached SCSI storage pools to each server leads to inefficient utilization of storage space.They also have a backup device attached to each server. They want to consolidate their storage and backup infrastructure into a scalable, high availability and high performance solution. The customer’s top priorities are performance, cost, and availability. Which of the following backup solutions best satisfies the customer requirements?()
第4题:
A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
第5题:
A customer wants to implement a clustered database solution on their existing x445 servers. A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards. Which of the following best satisfies their requirements?()
第6题:
A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers. The current environment is direct attached storage. The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms. The customer also needs a fibre attached backup solution. Which of the following solutions has the best combination of price and performance?()
第7题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第8题:
thereare no potential risks
the FCIDs of the servers must be changed
the SVC must be shut down during the migration
changing the FCIDs of storage resources will impact some servers
第9题:
A DS4300 Turbo with Fibre Attached Tape Library
A DS4500 with EXP700’s and Fibre Attached Tape Library
A DS4500 with EXP710’s and Fibre Attached Tape Library
A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library
第10题:
What are the plans for Disaster Recovery?
What are the plans for data migration?
Would iSCSI meet your needs?
How much space is available in the current storage systems?
第11题:
What is the planned backup solution?
How many people manage the storage system?
What is the total planned capacity?
Is a shared storage subsystem under consideration?
第12题:
Novell NetWare Cluster Services
Red Hat Enterprise Linux Cluster Suite
Microsoft Windows 2003 Server with MSCS
Microsoft Windows 2003 Enterprise Edition
第13题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第14题:
A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()
第15题:
A customer has Direct Attached Storage (DAS) storage for their Windows servers. They are allocating money in next year’s budget for additional storage. Which of the following questions should be asked first to determine the proper storage solution to propose?()
第16题:
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()
第17题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第18题:
RDAC
MPIO
SSPC
SDDPCM
第19题:
A DS4000 SAN with flash copy enabled for volume mirroring
An iSCSI solution with dedicated backup server with SCSI attached tape library
A NAS solution with SCSI direct attached tape library with dedicated backup network
A DS4000 SAN with fibre channel attached tape library solution with dedicated backup zone
第20题:
Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
第21题:
What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第22题:
PowerVM Lx86
PowerVM Express Edition
PowerVM Standard Edition
PowerVM Enterprise Edition
第23题:
PowerHA SystemMirror
Peer to Peer Remote Copy
General Parallel File Systems
Parallel Operating Environment
第24题:
Add redundant Fibre HBAs to each server and direct attach them to a DS4300 Turbo SAN solution
Add iSCSI cards to the servers and direct attach them to a DS300 dual controller model
Use clustered NAS solution with redundant gigabit network connections
Add redundant Fibre HBAs to each server and attach them to a DS400 dual controller model