Infocenter
ITSO Redbooks
Facts and Features
System Planning Tool
第1题:
What is the most important in the logistics information system? ()
第2题:
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第3题:
An electrician needs to know what type of receptacle is required. What is the most up-to-date resource to identify the plug type for the feature code ordered?()
第4题:
Select the IBM resource designed for small-to-medium business segments that helps identify System x server and storage for customers’ specific needs:()
第5题:
A Power 770 customer needs to add additional I/O adapters. There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()
第6题:
logical configuration
all configuration
full state
system configuration
第7题:
LPAR Planning Tool.
System Planning Tool.
LPAR Validation Tool.
System Validation Tool.
第8题:
IBM System Advisor Tool
IBM System x and BladeCenter Business Partner Guidebook
Standalone Solutions Configuration Tool (SSCT)
Configuration & Options Guide (COG)
第9题:
EDI
POS
GPS
Bar Code
第10题:
ITSO Redbooks
Facts and Features
System Planning Tool
Fix Level Recommendation Tool
第11题:
LPAR Planning Tool.
System Planning Tool.
LPAR Validation Tool.
System Validation Tool.
第12题:
GlassFish
iAS
WebLogic Server 11g
JBoss
第13题:
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第14题:
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
第15题:
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第16题:
What IBM resource will give you a picture of the possible plug types clearly labeled for those times your customer asks, "What plug type do I tell my electrician to use, and what does it look like? ()
第17题:
I/O Planning Guide
Power Systems data sheet
Power Systems Facts and Features
Run FLRT to recommend I/O features
第18题:
The bow type shackle provides a superior connection
The D-type shackle is weaker than the bow type
The bow type shackle is weaker than the D-type
The D-type shackle provides an inferior connection
第19题:
Infocenter
ITSO Redbooks
Facts and Features
System Planning Tool
第20题:
The system is waiting for user input to define console type lft0.
The system is waiting for user input to define console type tty0.
The system is waiting for user input to define console type vty0.
The system is waiting for user input to define console type vsa0.
第21题:
Infocenter
ITSO Redbooks
Facts and Features
System Planning Tool
第22题:
Techdocs
Process Guide
Product Checklists
Site Planning Guide
第23题:
IBM Power Configurator Tool
IBM xREF Sheets
IBM Configuration & Options Guide COG
IBM ServerProven
第24题:
IBM Standalone Solutions Configuration Tool (SSCT)
IBM Server Proven
IBM System x Reference Sheets (xREF)
IBM Sizing Guides