x3200
x3455
x3550
x3650
第1题:
A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server. What would be the best strategy to win with an IBM solution?()
第2题:
A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio. Which IBM server will fit the best for this customer?()
第3题:
A customer has asked the System x Sales Specialist to provide a solution that meets the following requirements: -- 4U rack-dense server -- 4 quad-core processors -- 32 GB of memory -- 4 Internal SAS hard drives with RAID 5 support -- Redundant Power Supplies -- 7 PCI-E slots available A competitor presented the customer with a solution comparable to a Dell PowerEdge 4-socket server. Which of the following should the System x Sales Specialist present as an advantage over the competitor’s solution? ()
第4题:
A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack. Which IBM server will best fit this customers requirement? ()
第5题:
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()
第6题:
Name the new server File2. Create a new mirrored volume by using two 72-GB disks. Connect File2 to the network and copy the data from File1. When copying is complete, shut down the old File1.
Name the new server File1. Move both disks from the old File1 to the new File1. Scan the disks for changes. Import the disks. Connect the new File1 to the network.
Name the new server File1. Break the mirror on the old File1. Move one of the disks from the old File1 to the new File1. Scan the disk for changes. Initialize the disk. Select the spare disk and create the mirror. Connect the new File1 to the network.
Name the new server File1. Remove one of the disks in the mirror from the old File1. Move the disk to the new File1. Scan the disk for changes. Import the disk. Shut down the old File1 and connect the new File1 to the network.
第7题:
Suggest to the customer to send their administrator to IBM System x training class to learn more about IBM Intel based servers.
Propose a try and buy option and offer to help the customer in sizing the new Linux server. Engage the system Engineer on this opportunity.
Introduce the IBM pSeries Unix product specialist to the account because IBM operating system (AIX) offers an open Unix solution.
Direct the customer to the IBM Web site to help with sizing and System x server models and types. Follow-up with the customer to answer any sizing question.
第8题:
Have optional Fibre Channel and Ethernet switches been installed in the server?
What is the available kVA value of the UPS?
Are there sufficient empty socket outlets in the UPS?
What is the impact on the power consumption of the data center cooling system?
第9题:
x3105
x3200
x3400
x3455
第10题:
x3200
x3455
x3550
x3650
第11题:
Redundant Blowers
Availability of AMD and Intel Processors
Processor density
Advanced Management Module
第12题:
Tell the customer that IBM has the best scale-out server strategy.
Show the benefit of server consolidation with IBM and the return on investment.
Find out the mixture of server processor and application type.
Tell the customer to buy smaller servers.
第13题:
A customer is considering an Intel processor-based blade solution from a competitor. The customer is willing to share only the information that the competitor offers 96 Xeon processors per rack. Which of the following IBM BladeCenter E benefits should the Sales Specialist emphasize first?()
第14题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第15题:
You are speaking to an IT manager with 350 small servers. The IT manager is looking to reduce and consolidate systems. What strategy would you follow?()
第16题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第17题:
An administrator needs to install a 2U server into a rack. Which of the following shows how much space, in height, needs to be available for the server to fit in the rack?()
第18题:
Redundant power supplies on the servers
Redundant PDUs in the rack
edundant power supplies in the servers and redundant PDUs in the rack
Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
第19题:
IBM XIV Storage System
IBM System Storage DS8700
IBM System Storage N6070
IBM System Storage N6210
第20题:
Blade servers
Rackmount servers
Tower servers
Web servers
第21题:
the properties of the Print Spooler service
the Print Server Properties
the properties of each shared printer
the properties on the new volume
第22题:
Add CPU and memory COD so they have room to grow if required
Make the server configuration twice as large as the current requirement
Configure the server for the current capacity requirements
Make the server configuration a little larger than the current capacity requirements
第23题:
x3255
x3655
x3755
x3850 M2
第24题:
1.75 inches(4.45 cm)
2.5 inches(6.35 cm)
3.5 inches(8.89 cm)
4.25 inches(10.8 cm)