单选题When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()A The 7042-CR4 is a rack

题目
单选题
When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
A

The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.

B

The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.

C

The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.

D

The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.


相似考题
更多“单选题When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()A The 7042-CR4 is a rack”相关问题
  • 第1题:

    A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.   The pSeries technical specialist should recommend purchasing which of the following?()

    • A、p5 hardware, AIX 5.2, Virtual I/O Server
    • B、POWER4 hardware, AIX 5.3, Virtual I/O Server,
    • C、p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
    • D、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature

    正确答案:C

  • 第2题:

    A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()

    • A、Higher rack density that reduces data center footprints
    • B、Internal upgrades that only IBM can offer
    • C、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches 
    • D、The Rear Door Heat eXchanger that only IBM can offer

    正确答案:C

  • 第3题:

    A customer has 12 x445s and 20 x365s in their datacenter that are dedicated to production workloads.  The customer wants to standardize on IBM Director as their Intel environment systems management platform.  Which server platform is supported as a Director server?()

    • A、zSeries
    • B、pSeries
    • C、iSeries
    • D、iSeries with IXA Adapter

    正确答案:C

  • 第4题:

    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

    • A、Direct the customer to the Installation Guide for each system to identify the power requirements.
    • B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
    • C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
    • D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

    正确答案:C

  • 第5题:

    A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()

    • A、compatibility of copy functions
    • B、difference in capacities in the two systems
    • C、cache size discrepancies between the two systems
    • D、the necessity of using two storage management products

    正确答案:A

  • 第6题:

    A customer is installing a new xSeries server into a Token-Ring environment.  Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()

    • A、IBM ServerProven hardware website
    • B、IEEE Proven website
    • C、IBM PartnerWorld website
    • D、3Com Support website

    正确答案:A

  • 第7题:

    单选题
    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()
    A

    Direct the customer to the Installation Guide for each system to identify the power requirements.

    B

    Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.

    C

    Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.

    D

    Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    You have successfully sold and installed your customer’s System x solution. Sometimes, the overall succeed of a sale depends on how well you have trained your customer to support their new hardware. Please consider the following tools. Which one would be the best for protectively determining a server outage, and contacting the system administrator about the outage?()
    A

    CDAT

    B

    Configuration and Options Guide (COG)

    C

    Physical Alarm Sounding in Data Center

    D

    IBM Systems Director


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio.  Which IBM server will fit the best for this customer?()
    A

    x3200

    B

    x3455

    C

    x3550

    D

    x3650


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A sales specialist is presented with a very large, complex opportunity. The customer is in the process of identifying business requirements.  Which of the following tasks is most important to position IBM as the leader to capture this opportunity?()
    A

    Call the IBM Client Representative and ask the rep to influence the company’s executives.

    B

    Develop a strategy to better understand and possibly influence the customer’s success criteria.

    C

    Using IBM’s opportunity management system, request a technical team be formed to design a solution.

    D

    Nominate the customer for a funded IBM Server Consolidation study.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
    A

    The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.

    B

    The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.

    C

    The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.

    D

    The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager.  They recently purchased an IBM x346 server for a remote office database project.  They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components.  Which of the following solutions would accomplish this?()
    A

    Install an RSA II Slimline card on the IBM server and configure to send email alerts

    B

    Enable the IBM management option in Insight Manager

    C

    Install and configure a Director agent on the IBM server

    D

    Configure the systems management processor on the IBM server


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio.  Which IBM server will fit the best for this customer?()

    • A、x3200
    • B、x3455
    • C、x3550
    • D、x3650

    正确答案:C

  • 第14题:

    A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()

    • A、Interconnect the service processors and use the IBM Director Agent
    • B、Install RSA II in each server and chain together the systems management processors
    • C、Install the RSA II in the top server and chain together the service processor interconnect
    • D、Install the IBM Director Agent on each server and use the remote control function to restart the servers

    正确答案:C

  • 第15题:

    A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager.  They recently purchased an IBM x346 server for a remote office database project.  They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components.  Which of the following solutions would accomplish this?()

    • A、Install an RSA II Slimline card on the IBM server and configure to send email alerts
    • B、Enable the IBM management option in Insight Manager
    • C、Install and configure a Director agent on the IBM server
    • D、Configure the systems management processor on the IBM server

    正确答案:A

  • 第16题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第17题:

    A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack.  Which IBM server will best fit this customers requirement? ()

    • A、x3105
    • B、x3200
    • C、x3400
    • D、x3455

    正确答案:A

  • 第18题:

    单选题
    When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
    A

    The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.

    B

    The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.

    C

    The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.

    D

    The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()
    A

    Higher rack density that reduces data center footprints

    B

    Internal upgrades that only IBM can offer

    C

    Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches 

    D

    The Rear Door Heat eXchanger that only IBM can offer


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack.  Which IBM server will best fit this customers requirement? ()
    A

    x3105

    B

    x3200

    C

    x3400

    D

    x3455


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()
    A

    Visual Media Key (VMK)

    B

    Integrated Management Module (IMM)

    C

    Remote Supervisor Adapter (RSA II)

    D

    Advanced Management Module (AMM)


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()
    A

    Because additional systems would require more power receptacles

    B

    Because the customer may need to do additional facilities planning

    C

    Because the customer needs additional funding to cover the services

    D

    Because postponing the eventual discussion will likely lead to customer dissatisfaction


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()
    A

    Interconnect the service processors and use the IBM Director Agent

    B

    Install RSA II in each server and chain together the systems management processors

    C

    Install the RSA II in the top server and chain together the service processor interconnect

    D

    Install the IBM Director Agent on each server and use the remote control function to restart the servers


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    A customer has 12 x445s and 20 x365s in their datacenter that are dedicated to production workloads.  The customer wants to standardize on IBM Director as their Intel environment systems management platform.  Which server platform is supported as a Director server?()
    A

    zSeries

    B

    pSeries

    C

    iSeries

    D

    iSeries with IXA Adapter


    正确答案: C
    解析: 暂无解析