Physically press the appropriate button on the system.
Physically disconnect and reconnect the power cable on the system.
Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
第1题:
What is the FIRST step in diagnosing a completely dead computer that was working fine the day before?()
第2题:
A server will not power on. Which of the following devices should the administrator use FIRST to determine the problem?()
第3题:
Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()
第4题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第5题:
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
第6题:
A system administrator’s daily monitoring has revealed a failing disk drive. The drive that is failing, hdisk0, is a lvm mirrored drive. What is the first step that should be taken in order to physically replace this drive?()
第7题:
Identify which systems are the most critical and bring them up by level of importance.
Retrieve the latest backup tapes for immediate system restore using the GFS rotation.
Identify the least critical systems and then power those systems on first.
Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
第8题:
What are the plans for Disaster Recovery?
What are the plans for data migration?
Would iSCSI meet your needs?
How much space is available in the current storage systems?
第9题:
back up the system data
gather information about the problem
try rebooting the system to see if that fixes the problem
check the System Error Log or Event Log
第10题:
Remove the physical volume from the system.
Remove the physical volume from the volume group.
Remove the physical partitions from the volume group.
Remove the logical volume copies from the failing drive.
第11题:
Loop back plugs
Power supply tester
System logs
TDR
第12题:
This is a uniprocessor system
The "prog" process has a nice value of 107
There are two active processors on this system
The "prog" process will only be scheduled to run on processor 0
第13题:
A computer boots up with the error "CMOS Checksum Failure." Which of the following components needs to be replaced?()
第14题:
A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()
第15题:
A technician needs to replace a computer’s hard drive. Which of the following should thetechnician do FIRST?()
第16题:
Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()
第17题:
A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()
第18题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()
第19题:
What are Disaster Recoveryplans
What are plans for datamigration
What storage system space isavailable
DoesiSCSI meet the needs
第20题:
Physically press the appropriate button on the system.
Physically disconnect and reconnect the power cable on the system.
Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
第21题:
remove all peripherals and reinstall them one at a time
replace the CMOS battery
check the AC power cord and verify the power source
back up the entire hard drive
第22题:
Identify which systems are the most critical and bring them up by level of importance.
Retrieve the latest backup tapes for immediate system restore using the GFS rotation.
Identify the least critical systems and then power those systems on first.
Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
第23题:
There is a fire hazard potential if a power outage occurs.
The last system plugged into the UPS will not be provided any power.
The UPS will draw more power from the circuit to compensate.
The runtime of the UPS will be insufficient if a power outage occurs.
第24题:
Backs up data
Less expensive than software RAID
Vendor neutral implementation
Accessible through a BIOS interface
More host CPU usage than software RAID
Accessible through a system utility after the OS has been loaded
May retain data in the event of a power outage