The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.
The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.
The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.
The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.
第1题:
Which command should the administrator use to display the IPL progress/LED code of the partition?()
第2题:
A customer is in the process of testing their configuration prior to going live. The administrator discovers thatPowerHA is taking 31 seconds to deal with a standard NIC failure. What can the administrator do to speed upthe process of NIC failure detection and diagnosis?()
第3题:
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第4题:
What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()?
第5题:
After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()
第6题:
An administrator is installing AIX. The SMS panel lists the following network adapter: NIC Adapters DeviceLocation CodeHardware. 1.Interpartition Logical LANU9123.710.1008B1A-V4-C2-T15e5a00004002. The NIM server is running in another LPAR on the same managed system. What speed and duplex should be configured on this adapter?()
第7题:
Maxperm% is set too low on LPAR 2
Insufficient paging space on LPAR 1
Service IBM.DRM is unavailable on LPAR 1
Insufficient pinnable memory frames available on LPAR 2
第8题:
128MB
256MB
512MB
1024MB
第9题:
128M
256M
512M
1024M
第10题:
View debug logs on NIM master for errors or failures.
Boot the client machine to SMS, and view the POST Error log.
Boot the client machine to SMS, setup remote IPL, and execute a ping test.
Boot the client machine to diagnostics, and ping the client from the NIM master.
第11题:
100/Full
1000/Half
1000/Auto
Auto/Auto
第12题:
LPAR Planning Tool.
System Planning Tool.
LPAR Validation Tool.
System Validation Tool.
第13题:
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第14题:
An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()
第15题:
For NIM to install client machines located in a non-adjacent network, which routing must be defined?()
第16题:
An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()
第17题:
An administrator has installed 1 VIO Server and 5 client LPARs on a 16-core Power 570 with the following CPU requirements: Virtual Processors Processing Units Min Desired Max Min Desired Max VIOS1 1 2 4 0.1 1.0 2.0 LPAR1 4 4 4 4.0 4.0 4.0 LPAR2 2 5 8 1.0 5.0 6.0 LPAR3 1 3 4 0.1 0.3 1.0 LPAR4 3 6 9 0.5 3.0 6.0 LPAR5 1 3 6 1.0 3.0 .06 If the administrator activates the LPARs in the above order, what will be the result? ()
第18题:
Database server
NTP server
DHCP server
SQL server
DNS server
Domain name
第19题:
0
1
255
256
第20题:
The 'Ping Test' is a recommended step to verify the IP information entered into the RIPL SMS panel.
The 'Ping Test' is a mandatory step required to commit the IP information entered into the RIPL SMS panel.
The 'Ping Test' is an optional step to verify network configuration entered into the RIPL SMS panel on older copper-based networks.
The 'Ping Test' is an optional step to verify network connectivity between client and server, where ICMP traffic is allowed on the connecting network.
第21题:
The Power 550 is licensed for three LPARs only.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory to perform logical partition tasks.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.
第22题:
0
1
255
256
第23题:
128 MB
256 MB
512 MB
1024 MB