Add Rear Door HeateXchanger
Add fans to the top of the racks
Increase circulation from Data Center raised floor
Change to perforated doors
第1题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第2题:
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()
第3题:
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()
第4题:
A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis. The modules were configured identically. The Ethernet module in bay one was inadvertenly reset to factory defaults. Which solution returns the module to the customer-specific configuration?()
第5题:
A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following products will be used to get thedata from one location to the other?()
第6题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第7题:
Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface
Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module
Back up the configuration of the Ethernet module in bay one and restore it to the Ethernet module in bay two using the AMM
Restore the configuration from NVRAM using the Switch Module Web interface
第8题:
BladeCenter E
BladeCenter H
BladeCenter T
BladeCenter HT
第9题:
IBM SAN40-B4
Cisco MDS 9222i
Cisco MDS 9148
IBM SAN32B-E4 with encryption
第10题:
Add Rear Door Heat eXchanger
Add fans to the top of the racks
Increase circulation from Data Center raised floor
Change to perforated doors
第11题:
Because additional systems would require more power receptacles
Because the customer may need to do additional facilities planning
Because the customer needs additional funding to cover the services
Because postponing the eventual discussion will likely lead to customer dissatisfaction
第12题:
RSTP
root guard
BPDU guard
GLBP
第13题:
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()
第14题:
A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()
第15题:
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()
第16题:
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()
第17题:
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
第18题:
32U
21U
25U
22U
第19题:
Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
第20题:
the stand-on vessel may change course and speed at any time as it has the right of way
after the give-way vessel sounds one blast in a crossing situation
when action by the give-way vessel alone cannot prevent collision
when the two vessels become less than half a mile apart
第21题:
32U
25U
22U
21U
第22题:
Add Rear Door HeateXchanger
Add fans to the top of the racks
Increase circulation from Data Center raised floor
Change to perforated doors
第23题:
The room temperature has reached 23C (73.4F).
A Blade within the chassis has been shut down.
The ambient temperature in the data center has increased
One of the additional System X servers in the BladeCenter rack has failed.
第24题:
SAN Switch modules
Blowers
Power supplies
Battery backup units