多选题A Site Administrator is preparing for disaster recovery.  In the case that a hard disk fails, which of the following would he need to do to have a complete backup?()AABBCCDDEE

题目
多选题
A Site Administrator is preparing for disaster recovery.  In the case that a hard disk fails, which of the following would he need to do to have a complete backup?()
A

A

B

B

C

C

D

D

E

E


相似考题
更多“多选题A Site Administrator is preparing for disaster recovery.  In the case that a hard disk fails, which of the following would he need to do to have a complete backup?()AABBCCDDEE”相关问题
  • 第1题:

    In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()

    • A、 logical configuration
    • B、 all configuration
    • C、 full state
    • D、 system configuration

    正确答案:C

  • 第2题:

    During a routine maintenance visit to a client, an administrator noticed that the last full backup did not complete. Which of the following should the administrator do FIRST?()

    • A、Schedule and perform an incremental backup as soon as possible.
    • B、Inspect backup report logs.
    • C、Schedule and perform a full backup as soon as possible.
    • D、Inspect alert notification settings.

    正确答案:B

  • 第3题:

    A natural disaster has occurred and the administrator must return the network to a healthy status.Which of the following should the administrator do in this case?()

    • A、Follow the emergency action plan.
    • B、Wait for an issue to be reported.
    • C、Establish a new baseline.
    • D、Determine if escalation is necessary.

    正确答案:A

  • 第4题:

    In which of the following locations would a technician set the LBA mode for a hard drive?()

    • A、Jumper Settings
    • B、Disk Manager
    • C、Device Manager
    • D、System BIOS

    正确答案:D

  • 第5题:

    An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()

    • A、 Hot site
    • B、 Warm site
    • C、 Cold site
    • D、 Active failover site

    正确答案:B

  • 第6题:

    A user states that whenever they try to launch a certain installed application, they hear unusual whirring/clicking sounds from their machine and the application never loads. Which of the following components would a technician MOST likely need to replace?()

    • A、Hard Disk Drive
    • B、Optical Drive
    • C、Power Supply Unit
    • D、Case Fan

    正确答案:A

  • 第7题:

    A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place.  They have an existing tape backup solution that meets their backup window.  In order to analyze potential disaster recovery plans, which of the following questions is the most important?()

    • A、What is the minimum critical backup window?
    • B、Which server is handling the most critical data?
    • C、How much data is stored on each server?
    • D、What is the throughput of the hard drives?

    正确答案:B

  • 第8题:

    Your network contains a server named Server1 that runs Windows Server 2008 R2. The disks on Server1 are configured as shown in the following table. Disk name Disk type Disk 0 Internal hard disk drive Disk 1 External hard disk drive Disk 2 Virtual hard disk You run the Backup Once wizard and discover that the option for Full Server backup is unavailable. You need to ensure that you can run a full server backup of Server1. What should you do?()

    • A、Take Disk 1 offline.
    • B、Take Disk 2 offline.
    • C、Run the Set-WBPolicy cmdlet.
    • D、Run Windows Server Backup as an Administrator.

    正确答案:B

  • 第9题:

    单选题
    In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()
    A

     logical configuration

    B

     all configuration

    C

     full state

    D

     system configuration


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    Which of the following backup media would be MOST appropriate for router configuration files?()
    A

    Optical

    B

    Tape

    C

    Flash drive

    D

    Hard disk


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    Your network contains a server named Server1 that runs Windows Server 2008 R2. The disks on Server1 are configured as shown in the following table. Disk name Disk type Disk 0 Internal hard disk drive Disk 1 External hard disk drive Disk 2 Virtual hard disk You run the Backup Once wizard and discover that the option for Full Server backup is unavailable. You need to ensure that you can run a full server backup of Server1. What should you do?()
    A

    Take Disk 1 offline.

    B

    Take Disk 2 offline.

    C

    Run the Set-WBPolicy cmdlet.

    D

    Run Windows Server Backup as an Administrator.


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place.  They have an existing tape backup solution that meets their backup window.  In order to analyze potential disaster recovery plans, which of the following questions is the most important?()
    A

    What is the minimum critical backup window?

    B

    Which server is handling the most critical data?

    C

    How much data is stored on each server?

    D

    What is the throughput of the hard drives?


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Which of the following is the MOST important data retention consideration when creating a backup system?()

    • A、Utilizing disk-to-disk clustering and hot site replication
    • B、If the GFS backup system will cover all potential data breaches
    • C、The process to move the data backup to an offsite location
    • D、The individual laws and legal requirements of the data

    正确答案:D

  • 第14题:

    Server1 contains a folder named D:/Salesdata, which contains important company data. The hardware-monitoring software reports that the disk that contains volume D is in danger of imminent disk failure. You order a replacement disk, but you must wait at least one day for the disk to be delivered. You discover that you do not have a backup of the D:/Salesdata folder because a recent backup was configured incorrectly. You need to back up the D:/Salesdata folder so that you can restore the data if the disk fails. You need to achieve this goal as quickly as possible. What should you do? ()

    • A、Perform a normal backup of the D:/Salesdata folder.
    • B、Perform an incremental backup of the D:/Salesdata folder.
    • C、Perform a differential backup of the D:/Salesdata folder.
    • D、Perform a daily backup of the D:/Salesdata folder.
    • E、Enable Shadow Copies on volume D:/Configure the shadow copy location as C:/.

    正确答案:A

  • 第15题:

    A server has five hot pluggable SCSI disk drives in a RAID 5 array.  The server OS crashed and the server will not boot.  The administrator noticed that all of the disk drives have gone offline.Which of the following components would MOST likely have caused the problem?()

    • A、Memory
    • B、SCSI backplane
    • C、SCSI drives
    • D、Motherboard

    正确答案:B

  • 第16题:

    Which of the following backup media would be MOST appropriate for router configuration files?()

    • A、Optical
    • B、Tape
    • C、Flash drive
    • D、Hard disk

    正确答案:C

  • 第17题:

    Which of the following is the MOST important step in preparing for disaster recovery?()

    • A、 Test the disaster recovery plan process
    • B、 Identify key disaster recovery personnel
    • C、 Ensure that all backup data is kept off-site
    • D、 Assist management with IT backup policy decisions

    正确答案:A

  • 第18题:

    A tape library can be defined as which of the following?()

    • A、 A way to catalog tapes after a tape backup to easily identify and retrieve data.
    • B、 A modular tape backup system containing multiple drives, tapes, and connections.
    • C、 A database consisting of all backups performed and the contents of each backup.
    • D、 An offsite storage facility to house tapes in case of a disaster for easy site recovery.

    正确答案:B

  • 第19题:

    You have a computer that runs Windows XP professional. The computer contains one partition and a floppy disk drive. You connect a new USB drive. You need to back up the computer to meet the following requirements: Enable a complete recovery if the hard disk fails. Enable an automatic restore of the operating systems. Automatically recreate the partitions during a restore process. What should you do?()

    • A、From System Restore, create a system restore point.
    • B、From the System Tools menu, run the Files and Settings Transfer Wizard.
    • C、From Windows Backup, run the Automated System Recovery (ASR) Wizard. 
    • D、From Windows Backup, run the Backup Wizard, and then select Only backup the System State data. 

    正确答案:C

  • 第20题:

    You need to ensure that you can recover system configuration and data if your computer hard disk fails.  What should you do? ()

    • A、Create a system restore point.
    • B、Create a backup of all file categories.
    • C、Create a Complete PC Backup and Restore image.
    • D、Perform an Automated System Recovery (ASR) backup.

    正确答案:C

  • 第21题:

    多选题
    You are the network administrator for All network servers run Windows Server 2003. A member server named TestKingA contains two volumes. You need to perform a complete backup of the data on TestKingA. You must ensure that TestKingA can be completely restored in case of hardware failure. Which two actions should you perform? ()(Each correct answer presents part of the solution. Choose two)
    A

    Create an Automated System Recovery (ASR) backup.

    B

    Create a backup of user data.

    C

    Create a Windows Server 2003 bootable floppy disk.

    D

    Create a DOS bootable floppy disk.

    E

    Copy all Windows Server 2003 boot files to the Windows Server 2003 bootable floppy disk.

    F

    Copy only Boot.ini to the Windows Server 2003 bootable floppy disk


    正确答案: A,B
    解析: 暂无解析

  • 第22题:

    单选题
    Which of the following is the MOST important step in preparing for disaster recovery?()
    A

     Test the disaster recovery plan process

    B

     Identify key disaster recovery personnel

    C

     Ensure that all backup data is kept off-site

    D

     Assist management with IT backup policy decisions


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A tape library can be defined as which of the following?()
    A

     A way to catalog tapes after a tape backup to easily identify and retrieve data.

    B

     A modular tape backup system containing multiple drives, tapes, and connections.

    C

     A database consisting of all backups performed and the contents of each backup.

    D

     An offsite storage facility to house tapes in case of a disaster for easy site recovery.


    正确答案: C
    解析: 暂无解析

  • 第24题:

    多选题
    A Site Administrator is preparing for disaster recovery.  In the case that a hard disk fails, which of the following would he need to do to have a complete backup?()
    A

    A

    B

    B

    C

    C

    D

    D

    E

    E


    正确答案: E,B
    解析: 暂无解析