2个
4个
6个
8个
第1题:
与HPrx3600相比,哪一款POWER Systems服务器性能即可胜出?()
第2题:
A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()
第3题:
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()
第4题:
请问下列哪款IBM产品是由IBM负责免费安装的产品?()
第5题:
与Sun SPARC Enterprise M4000相比,哪一款POWER Systems服务器性能即可胜出?()
第6题:
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()
第7题:
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
第8题:
关于POWER Systems和x系列服务器,下列陈述错误的是()
第9题:
A desk, as it not rack mountable
Ethernet connections to the POWER5 systems
Serial connections to the POWER5 systems
USB connections for the keyboard and mouse
第10题:
POWER520即可
需要POWER550
需要POWER570
需要POWER595
第11题:
p520 是IBM POWER Systems 服务器一款入门级产品,可配置1核、2核、4核CPU
p520 采用power6芯片,支持4.2GHz主频
p520 支持AIX,LINUX操作系统
以上都正确
第12题:
POWER520即可
需要POWER550
需要POWER570
需要POWER595
第13题:
与HP的rx3600相对应的POWER 系列产品是()
第14题:
POWER 570是POWER Systems的高端主流产品,采用模块化的设计,请问最大支持几个CEC模块?()
第15题:
POWER 570采用模块化设计, 每个模块占用多少空间()
第16题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第17题:
有关IBM POWER 520 服务器,下面的哪些说法是合理的()
第18题:
由于TPC组织不对中低端机器进行测试,那么POWER Systems中低端产品的tpc-c 是如何计算的?()
第19题:
Which system provides redundant system clocks?()
第20题:
与HP rx8640相比,哪一款POWER Systems服务器性能即可胜出?()
第21题:
Identify which systems are the most critical and bring them up by level of importance.
Retrieve the latest backup tapes for immediate system restore using the GFS rotation.
Identify the least critical systems and then power those systems on first.
Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
第22题:
2个
4个
6个
8个
第23题:
POWER520即可
需要POWER550
需要POWER570
需要POWER595
第24题:
根据CPU个数估计
IBM自己测试结果
根据POWER 570测试值和相关rperf推算
以上都不对