单选题During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to on

题目
单选题
During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()
A

 None,everything can be done with the cluster active.

B

 Minimal downtime will be required to import the volume groups.

C

 Several hours are required for testing before final synchronization.

D

 Minimal downtime will be required to connect and test the serial network.


相似考题
参考答案和解析
正确答案: C
解析: 暂无解析
更多“单选题During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to on”相关问题
  • 第1题:

    A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’.  What type of configuration would cause this type of behavior?()  

    • A、 The resource group DNP has been configured.
    • B、 The resource group option CWOF has been enabled.
    • C、 The resource group option Inactive Takeover is set.
    • D、 A resource group fallback timer has been configured.

    正确答案:B

  • 第2题:

    A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()

    • A、 vmstat and iostat data from the older machines 
    • B、 The number of CPUs that were installed in the original machines 
    • C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) 
    • D、 Performance data that is collected from the new system after it has been put into production

    正确答案:C

  • 第3题:

    During a planning session, the customer indicates the need to provide high availability between a  Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster.  Which of the following HACMP options will provide this functionality?()  

    • A、 GeoRM
    • B、 HACMP/XD://PPRC
    • C、 HACMP/XD://GPFS
    • D、 HACMP/XD://HAGEO

    正确答案:D

  • 第4题:

    During an HACMP migration,two nodes of a four-node cluster have been migrated. The existing hardware of the remaining two nodes do not meet the pre-requisites of the HACMP level that is being installed.  Which of the following is the best method for resolving this issue?()

    • A、 Upgrade the unsupported hardware and continue with the migration.
    • B、 Restore the two nodes that have been migrated with a cluster snapshot.
    • C、 Restore the two nodes that have not been migrated with a cluster snapshot.
    • D、 Synchronize the cluster to allow the nodes that didn’t migrate to join the cluster.

    正确答案:B

  • 第5题:

    单选题
    During an HACMP migration,two nodes of a four-node cluster have been migrated. The existing hardware of the remaining two nodes do not meet the pre-requisites of the HACMP level that is being installed.  Which of the following is the best method for resolving this issue?()
    A

     Upgrade the unsupported hardware and continue with the migration.

    B

     Restore the two nodes that have been migrated with a cluster snapshot.

    C

     Restore the two nodes that have not been migrated with a cluster snapshot.

    D

     Synchronize the cluster to allow the nodes that didn’t migrate to join the cluster.


    正确答案: D
    解析: 暂无解析

  • 第6题:

    单选题
    During Company.com planning session, the LVM requirements for HACMP are provided. The administrator explains that there are five volume groups in the current production environment because filesystems constantly change due to the nature of the business. Maintenance outages are limited to one Saturday per month. There is some concern about the amount of time that will be required for outages once HACMP is installed.  With HACMP,what will be the simplest methods of managing LVM changes while minimizing required downtime.()
    A

     Make changes and allows Lazy Update to sync the changes later.

    B

     Use the Cluster Single Point Of Control to manage LVM changes.

    C

     Use exportvg on the primary node and improtvg on the second node.

    D

     Set up a local NFS cross-mount, and use the local filesystem until the outage.


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    During a planning session, the customer indicates the need to provide high availability between a  Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster.  Which of the following HACMP options will provide this functionality?()
    A

     GeoRM

    B

     HACMP/XD://PPRC

    C

     HACMP/XD://GPFS

    D

     HACMP/XD://HAGEO


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
    A

     vmstat and iostat data from the older machines

    B

     The number of CPUs that were installed in the original machines

    C

     Data from Workload Estimator (WLE) and IBM Performance Management (PM)

    D

     Performance data that is collected from the new system after it has been put into production


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups.  A serial network for this cluster will require which connections?()
    A

     A single serial network between Node ’A’ and Node ’B’ and Node ’C’

    B

     A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’

    C

     A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’

    D

     A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
    A

     vmstat and iostat data from the older machines 

    B

     The number of CPUs that were installed in the original machines 

    C

     Data from Workload Estimator (WLE) and IBM Performance Management (PM) 

    D

     Performance data that is collected from the new system after it has been put into production


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()
    A

    Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.

    B

    Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.

    C

    On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.

    D

    On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.  Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
    A

    IBM eConfig

    B

    IBM Performance Monitor

    C

    IBM Workload Estimator (WLE)

    D

    IBM System Planning Tool (SPT)


    正确答案: C
    解析: 暂无解析

  • 第13题:

    During Company.com planning session, the LVM requirements for HACMP are provided. The administrator explains that there are five volume groups in the current production environment because filesystems constantly change due to the nature of the business. Maintenance outages are limited to one Saturday per month. There is some concern about the amount of time that will be required for outages once HACMP is installed.  With HACMP,what will be the simplest methods of managing LVM changes while minimizing required downtime.()  

    • A、 Make changes and allows Lazy Update to sync the changes later.
    • B、 Use the Cluster Single Point Of Control to manage LVM changes.
    • C、 Use exportvg on the primary node and improtvg on the second node.
    • D、 Set up a local NFS cross-mount, and use the local filesystem until the outage.

    正确答案:B

  • 第14题:

    During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups.  A serial network for this cluster will require which connections?()  

    • A、 A single serial network between Node ’A’ and Node ’B’ and Node ’C’
    • B、 A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’
    • C、 A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’
    • D、 A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’

    正确答案:D

  • 第15题:

    During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()  

    • A、 None,everything can be done with the cluster active.
    • B、 Minimal downtime will be required to import the volume groups.
    • C、 Several hours are required for testing before final synchronization.
    • D、 Minimal downtime will be required to connect and test the serial network.

    正确答案:A

  • 第16题:

    During Company.com planning session, the discussion focuses on how the IP connections are  Managed after a cluster node failure. This is critical for the business since their production application is a Lotus Domino solution requiring multiple IP addresses and recovery time is critical.  What type of IPAT implementation would best address these requirements?()  

    • A、 IPAT via IP aliasing
    • B、 IPAT via IP replacement
    • C、 IPAT via IP aliasing using HWAT
    • D、 IPAT via IP replacement using HWAT

    正确答案:A

  • 第17题:

    单选题
    During a planning session, the customer indicates that they intend to build two independent two- Node clusters (cluster ’A’ and ’B’) that will be provided shared storage form an IBM TotalStorage FAStT900 server. The customer intends to present 2 LUNs to cluster ’A’, and 2 LUNs to cluster ’B’. All hosts will be dual attached via fibre.  What additional hardware or software is necessary to make this a valid configuration?()
    A

     SAN switches

    B

     Fibre channel Hub(s)

    C

     IBM Storage Manager Agents

    D

     IBM Subsystem Device Driver


    正确答案: C
    解析: 暂无解析

  • 第18题:

    单选题
    An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()
    A

    LDAP Authentication Module

    B

    Smart Assist for Active Directory

    C

    C-SPOC for user and password management

    D

    File Collections designating one node as the primary authentication node


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()
    A

     4

    B

     5

    C

     6

    D

     8


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’.  What type of configuration would cause this type of behavior?()
    A

     The resource group DNP has been configured.

    B

     The resource group option CWOF has been enabled.

    C

     The resource group option Inactive Takeover is set.

    D

     A resource group fallback timer has been configured.


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    During an internal IT organization planning session, it is decided that a new cluster node would  Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process.  How much cluster downtime will need to be allocated for adding a new node?()
    A

     None,everything can be done with the cluster active.

    B

     Minimal downtime will be required to import the volume groups.

    C

     Several hours are required for testing before final synchronization.

    D

     Minimal downtime will be required to connect and test the serial network.


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    During Company.com planning session, the discussion focuses on how the IP connections are  Managed after a cluster node failure. This is critical for the business since their production application is a Lotus Domino solution requiring multiple IP addresses and recovery time is critical.  What type of IPAT implementation would best address these requirements?()
    A

     IPAT via IP aliasing

    B

     IPAT via IP replacement

    C

     IPAT via IP aliasing using HWAT

    D

     IPAT via IP replacement using HWAT


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    You are planning to connect your three branch offices to the corporate site via Frame Relay. The first branch office has been assigned the network 10.1.0.0/16, the second 10.2.0.0/16, the third 10.3.0.0/16, and the corporate headquarters uses 10.0.0.0/16. You would like to summarize all branch and corporate networks into a single route at the corporate site. Which network address and subnet mask should you choose?()
    A

     10.0.0.0/24

    B

     10.0.0.0/16

    C

     10.0.0.0/14

    D

     10.0.0.0/15


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    A new application has been added to a system which needs to automatically be started at system startup. The system administrator has decided to accomplish this by using the /etc/inittab file. Which command would be used to accomplish this in a supported manner?()
    A

    vi

    B

    mkitab

    C

    telinit

    D

    startsrc


    正确答案: A
    解析: 暂无解析