None,everything can be done with the cluster active.
Minimal downtime will be required to import the volume groups.
Several hours are required for testing before final synchronization.
Minimal downtime will be required to connect and test the serial network.
第1题:
A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?()
第2题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第3题:
During a planning session, the customer indicates the need to provide high availability between a Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster. Which of the following HACMP options will provide this functionality?()
第4题:
During an HACMP migration,two nodes of a four-node cluster have been migrated. The existing hardware of the remaining two nodes do not meet the pre-requisites of the HACMP level that is being installed. Which of the following is the best method for resolving this issue?()
第5题:
Upgrade the unsupported hardware and continue with the migration.
Restore the two nodes that have been migrated with a cluster snapshot.
Restore the two nodes that have not been migrated with a cluster snapshot.
Synchronize the cluster to allow the nodes that didn’t migrate to join the cluster.
第6题:
Make changes and allows Lazy Update to sync the changes later.
Use the Cluster Single Point Of Control to manage LVM changes.
Use exportvg on the primary node and improtvg on the second node.
Set up a local NFS cross-mount, and use the local filesystem until the outage.
第7题:
GeoRM
HACMP/XD://PPRC
HACMP/XD://GPFS
HACMP/XD://HAGEO
第8题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第9题:
A single serial network between Node ’A’ and Node ’B’ and Node ’C’
A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’
A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’
A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’
第10题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第11题:
Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.
Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.
On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.
On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
第12题:
IBM eConfig
IBM Performance Monitor
IBM Workload Estimator (WLE)
IBM System Planning Tool (SPT)
第13题:
During Company.com planning session, the LVM requirements for HACMP are provided. The administrator explains that there are five volume groups in the current production environment because filesystems constantly change due to the nature of the business. Maintenance outages are limited to one Saturday per month. There is some concern about the amount of time that will be required for outages once HACMP is installed. With HACMP,what will be the simplest methods of managing LVM changes while minimizing required downtime.()
第14题:
During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups. A serial network for this cluster will require which connections?()
第15题:
During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?()
第16题:
During Company.com planning session, the discussion focuses on how the IP connections are Managed after a cluster node failure. This is critical for the business since their production application is a Lotus Domino solution requiring multiple IP addresses and recovery time is critical. What type of IPAT implementation would best address these requirements?()
第17题:
SAN switches
Fibre channel Hub(s)
IBM Storage Manager Agents
IBM Subsystem Device Driver
第18题:
LDAP Authentication Module
Smart Assist for Active Directory
C-SPOC for user and password management
File Collections designating one node as the primary authentication node
第19题:
4
5
6
8
第20题:
The resource group DNP has been configured.
The resource group option CWOF has been enabled.
The resource group option Inactive Takeover is set.
A resource group fallback timer has been configured.
第21题:
None,everything can be done with the cluster active.
Minimal downtime will be required to import the volume groups.
Several hours are required for testing before final synchronization.
Minimal downtime will be required to connect and test the serial network.
第22题:
IPAT via IP aliasing
IPAT via IP replacement
IPAT via IP aliasing using HWAT
IPAT via IP replacement using HWAT
第23题:
10.0.0.0/24
10.0.0.0/16
10.0.0.0/14
10.0.0.0/15
第24题:
vi
mkitab
telinit
startsrc