第1题:
Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()
第2题:
A large shipping company that is standardized on Fibre Channel storage has just acquired a regional shipping company that is using an IBM XIV system. The large company would like to integrate the XIV system into the environment and manage all data through a single management interface. Which product should be suggested so that all data can be managed?()
第3题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第4题:
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
第5题:
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()
第6题:
Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
Use smitty or smit interface to enter the Capacity on Demand enablement code.
Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.
第7题:
Microsoft Application Virtualization Sequencer
Microsoft Application Virtualization Desktop Client
Microsoft System Center Application Virtualization Streaming Server
Microsoft System Center Application Virtualization Management Server
第8题:
Workload Partitions Manager for AIX
Hardware Management Console (HMC) GUI
Integrated Virtualization Manager (IVM)
Advanced System Management Interface (ASMI)
第9题:
The LPAR Configuration backup is corrupt
The LPAR Configuration has been altered using DLPAR
The LPAR Configuration backup was performed on a different HMC
The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
第10题:
Create a system profile. Reconfigure the managed system by activating and deactivating the system profiles.
Create one partition profile for each client. Reconfigure the managed system by activating the partition profiles for that client.
Dynamically move processors and memory as needed into each logical partition. Reconfigure the managed system by activating and deactivating partition profiles.
Dynamically move processors and memory into each logical partition on the server if additional resources are needed. Reconfigure the managed system by activating and deactivating the system profiles.
第11题:
Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
Use smitty or smit interface to enter the Capacity on Demand enablement code.
Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.
第12题:
DS8800 system with three frames
DS8800 system with one frame
DS8700 system with two frames
DS8800 system with two frames
第13题:
A system administrator for a business recovery service center needs to test disaster recovery strategies for their clients running Linux. Each client has a different system configuration. Each time a client comes in, the system configuration of the managed system must change. What is the best way to handle this using LPAR?()
第14题:
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()
第15题:
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
第16题:
Company.com is ordering a new p5-570 and planning for the option of using Capacity on Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()
第17题:
Your company has an Active Directory Domain Services (AD DS) domain. You virtualize applications by using Microsoft Application Virtualization (App - V). You are creating an application virtualization package. Which sh ould you use?()
第18题:
The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).
The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).
第19题:
IBM DS8700
IBM XIV GUI
IBM System Storage N7600
IBM SAN Volume Controller (SVC)
第20题:
Add additional RAM to the user PC
Troubleshoot the user PC
Add additional RAM to the server
Add additional hard drive space to the server
第21题:
Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failure
Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occurs
Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHA
Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover
第22题:
It has a GUI interface for upgrading system firmware.
It creates and manages AIX/Linux and VIOS type LPARs.
It can be managed by the Hardware Management Console (HMC).
It supports Live Partition Mobility on POWER6 systems and above.
第23题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第24题:
In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.
In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.
In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.
In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.