plan
design
prepare
operate
第1题:
A customer is involved in an IBM critical situation (CritSit). The customer recently installed iDATAPIex. The business partner has been assessed a significant penalty by IBM. Which of the following is the reason for this action by IBM?()
第2题:
Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()
第3题:
Which prepare phase service component involves providing a customer with a financial justification for adopting a technology? Select exactly 1 answer(s) from the following:()。
第4题:
In which of these phases is a customer’s current network infrastructure assessed?()
第5题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第6题:
Plan
design
operate
implement
第7题:
plan
design
prepare
operate
第8题:
7000 series routers
integrated services routers
small business pro routers
small business routers
第9题:
Call the IBM Client Representative and ask the rep to influence the company’s executives.
Develop a strategy to better understand and possibly influence the customer’s success criteria.
Using IBM’s opportunity management system, request a technical team be formed to design a solution.
Nominate the customer for a funded IBM Server Consolidation study.
第10题:
foundation
optimized
implemented
growth
finished
beginning
第11题:
aironet
small multi pro
small business pro
small business
第12题:
identifying what a customer requires from a proposed solution
analyzes the customer s business requirements and recommends the appropriate Cisco technologies to meet business requirements
determining what end-user training a customer requires
addressinga customer s physical requirements
第13题:
In which of these phases is a customer’s network assessed to determine its system readiness?()
第14题:
Which service component within the prepare phase recommends the appropriate technology strategy to address a business requirement of the customer? Select exactly 1 answer(s) from the following:()。
第15题:
What are two components of the Discovery Guide in the Cisco sales approach?()
第16题:
Which three are the phases of the Cisco Smart Business Roadmap?()
第17题:
A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()
第18题:
identifying and assessing customer business requirements
documenting and categorizing customer business requirements in terms of performance, availability, capacity and security
producing a documented technology strategy
creating a bill of materials
presenting documented business requirements to a customer and having the customer validate them
completing a site survey
第19题:
integrated services routers
small business routers
7000 series routers
small business pro routers
第20题:
Plan
design
implement
prepare
第21题:
The business partner was required to perform a TDA and failed to do so
The business partner recommended a nonworking configuration
The business partner did not support the customer correctly
The business partner failed to sell Remote Technical Support (RTS)
第22题:
small business
smallmultipro
aironet
small business pro
第23题:
finding out what a customer requires from a proposed solution
analyzes the customer’s business requirements and recommends the appropriate Cisco technologies to meet business requirements
finding out what end-user training a customer requires
finding out a customer’s physical requirements
第24题:
plan
design
prepare
operate