    Total project risk can be defined as:

    A the sum of the probabilities of project risks events times the sum of consequences of those risks

    B the sum of the products of each project risk event times its consequences

    C the sum of the consequences of all project risk events

    D the sum of the probabilities of all project risk events

    E 1 - the sum of the probabilities of all project risk events.


    正确答案:B

  • 第2题:

    118 A common way by which executives provide the project manager with written authority is through:

    A. A common job description for all project managers

    B. An appointment letter

    C. A project charter

    D. All of the above

    E. B and C only


    正确答案:E

  • 第3题:

    66 A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

    A. Change the scope baseline

    B. Prepare a variance report

    C. Call a meeting of the configuration control board

    D. Change the project's objectives

    E. Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline


    正确答案:E

  • 第4题:

    18 Interfacing with the customer after project go-ahead is the responsibility of:

    A. Project sponsor

    B. Project team

    C. Project manager

    D. Functional manager

    E. All of the above are possible, based upon the size and complexity of the project


    正确答案:C

  • 第5题:

    ● Interfacing with the customer after project go-ahead is the responsibility of:

    A Project sponsor

    B Project team

    C Project manager

    D Functional manager

    E All of the above are possible, based upon the size and complexity of the project


    正确答案:C

  • 第6题:

    ● A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

    A Change the scope baseline

    B Prepare a variance report

    C Call a meeting of the configuration control board

    D Change the project's objectives

    E Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline


    正确答案:E

  • 第7题:

    A project manager believes that modifying the scope of the project may provide added value service for the customer.The project manager should______.

    A.assign change tasks to project members

    B.call a meeting of the configuration control board

    C.change the scope baseline

    D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline


    正确答案:D
    解析:项目经理认为调整项目范围可以给客户提供增值的服务,项曰经理应该怎么做。
      选项A是安排任务变更到项目成员,选项B是召集变更控制委员会会议,选项C是变更项目基线,选项D是按照原先的基线,在确定完成一项改进项目会得到客户的相应资金前,暂缓修改。
      由于是在原内容基础上增加增值服务内容,超出原先范围,应先确定客户认可和增加新资金,因此应选择D。

  • 第8题:

    A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should ( )

    A.assign change tasks to project members
    B.call a meeting of the configuration control board
    C.change the scope baseline
    D. postpone the modification until a separate enhancement project is fundedafter this project is completed according to the original baseline

    答案:D
    解析:
    项目经理认为调整项目范围可以给客户提供增值的服务,项目经理应该怎么做。
    选项A是安排任务变更到项目成员,选项B是召集变更控制委员会会议,选项C是变更项目基线,选项D是按照原先的基线,在确定完成一项改进项目会得到客户的相应资金前,暂缓修改。
    由于是在原内容基础上增加增值服务内容,超出原先范围,应先确定客户认可和增加新资金。因此应选择D。

  • 第9题:

    A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should ( ) .

    A.assign change tasks to project members
    B.call A.meeting of the configuration control board
    C.change the scope baseline
    D.postpone the modification until A.separate enhancement project is fundeD.after this project is completeD.according to the original baseline

    答案:D
    解析:
    项目经理认为调整项目范围可以给客户提供增值的服务,项目经理应该怎么做。

    选项A是安排任务变更到项目成员,选项B是召集变更控制委员会会议,选项C是变更项目基线,选项D是按照原先的基线,在确定完成一项改进项目会得到客户的相应资金前,暂缓修改。

    由于是在原内容基础上增加增值服务内容,超出原先范围,应先确定客户认可和增加新资金。因此应选择D。

  • 第10题:

    The engineer recommended()

    • A、 when we look at this question.
    • B、 that values his new ideas.
    • C、 that the process can be made simpler.
    • D、 which is the Mark 2 project.

    正确答案:C

  • 第11题:

    The intention of the()is to schedule, organize and control all activities to achieve the project goal eventually.no matter how difficult it is and what kind of risks are there.

    • A、project work breakdown
    • B、project security authentication
    • C、project management
    • D、project flowchart

    正确答案:C

  • 第12题:

    单选题
    The engineer recommended()
    A

     when we look at this question.

    B

     that values his new ideas.

    C

     that the process can be made simpler.

    D

     which is the Mark 2 project.


    正确答案: C
    解析: 暂无解析

  • 第13题:

    15 Total project risk can be defined as:

    A. the sum of the probabilities of project risks events times the sum of consequences of those risks

    B. the sum of the products of each project risk event times its consequences

    C. the sum of the consequences of all project risk events

    D. the sum of the probabilities of all project risk events

    E. 1 - the sum of the probabilities of all project risk events


    正确答案:B

  • 第14题:

    167 The project life-cycle can be described as:

    A. project concept, project planning, project execution, and project close-out.

    B. project planning, work authorization, and project reporting.

    C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

    E. All of the above


    正确答案:A

  • 第15题:

    142 Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:

    A. The project manager

    B. The functional manager

    C. The project sponsor

    D. The client

    E. All of the above


    正确答案:A

  • 第16题:

    ● Which of the following are included as part of a scope statement?

    A Project justification

    B Project deliverables

    C Project objectives

    D All of the above

    E B and C


    正确答案:D

  • 第17题:

    ● Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:

    A The project manager

    B The functional manager

    C The project sponsor

    D The client

    E All of the above


    正确答案:A

  • 第18题:

    ● A Work Breakdown Structure:

    A assures all work is identified

    B subdivides the project into manageable segments

    C provides the project sponsor with a time-phase task summary

    D both A and B

    E All of the above.


    正确答案:D

  • 第19题:

    It is recommended that the project _____ until 选择

    It is recommended that the project _____ until all the preparations have been made.

    (A) is not started                          (C) not be started

    (B) will not be started                   (D) is not to be started

     


    C.虚拟语气 recommended +that should+原形should可省        此题为被动

  • 第20题:

    A project is a[temporary]( )of unique,complex,and connected activities having one goal or purpose and that must be completed by a specific time,within budget,and according to( ).Project management is the process of scoping,planning,staffing,organizing,directing,and controlling the development of a(n)( )system at a minimum cost within a specified time frame.For any systems development project,effective project management is necessary to ensure that the project meets the( ),is developed within an acceptable budget,and fulfills customer expectations and specifications,Project management is a process that starts at the beginning of a project,extends through a project,and doesn't culminate until the project is completed.The prerequisite for good project management is a well-defined system development process.Process management is an ongoing activity that documents,manages the use of,and improves an organization s chosen methodology(the“process”)for system development,Process management is concerned with the activities,deliverables,and quality standards to be applied to(请作答此空)project(s).

    A.a single
    B.a particular
    C.some
    D.all

    答案:D
    解析:
    表示过程管理涉及应用于所有项目的活动。附(参考翻译):一个项目是一个独特的、复杂的、相互关联的活动的[临时]序列,有一个目标或目的,必须在特定的时间、预算内和根据规范完成。项目管理是一个范围界定、计划、人员配置、组织、指导和控制可接受系统开发的过程,在规定的时间内以最低的成本进行。对于任何系统开发项目,有效的项目管理都是必要的,以确保项目在截止日期前完成,在可接受的预算内开发,并满足客户的期望和规范,项目管理是从项目开始时开始的过程,延伸到一个项目中,直到项目完成才达到顶点。良好的项目管理的先决条件是定义良好的系统开发过程。过程管理是一项持续的活动,它记录、管理和改进组织为系统开发所选择的方法(“过程”),过程管理涉及应用于所有项目的活动、可交付成果和质量标准。

  • 第21题:

    The engineer recommended()

    A when we look at this question.

    B that values his new ideas.

    C that the process can be made simpler.

    D which is the Mark 2 project.


    C

  • 第22题:

    We can't tell you the results until we have looked at()

    • A、all the datum
    • B、the all data
    • C、all the data
    • D、the all datum

    正确答案:C

  • 第23题:

    单选题
    It is recommended that the project _____ until all the preparations have been made.
    A

    not be started

    B

    will not be started

    C

    is not started

    D

    is not to be started


    正确答案: C
    解析:
    句意:建议在所有的准备工作完成之前,这项工程不要开始。It is recommended后面的主语从句用虚拟语气,用“should+动词原形”的形式,should可省略,因此本题选择A项。

  • 第24题:

    单选题
    It is recommended that the project ______ until all the preparations have been made.
    A

    not be started  

    B

    will not be started

    C

    is not started  

    D

    is not to be started


    正确答案: B
    解析:
    建议在所有的准备工作完成之前,这项工程不要开始。It is recommended后面的主语从句用虚拟语气,用“should+动词原形”的形式,should可省略,因此本题选择A项。