oil sump
oil separator
outlet pipe
inlet pipe
第1题:
broken inlet valves
broken discharge valves
pulsations in the air distribution system
overloading of the air distribution system
第2题:
to increase
to speed up
to prevent
to reduce
第3题:
Suez Canal searchlight, air compressor and air conditioning compressor
Air compressor, boiler blower and refrigeration plant
Boiler blower, Suez Canal searchlight and refrigeration plant
Suez canal searchlight, air compressor and boiler blower
第4题:
turned
oil level checked
filled with water
A and B
第5题:
expansion tank
combustion chamber
air receiver
evaporator
第6题:
removing all but the frictional load during starting
relieving intercoolers of high temperature buildups
providing high starting torque in the drive motor
seating valve plates during compressor shutdown
第7题:
engine cylinder
air bottle
evaporator
condenser
第8题:
overhaul
running
blowing down
All of the above are correct
第9题:
bypass the high pressure stage to the low pressure stage on 100% of the air compressors in service
prevent excessive inter-stage pressure buildup
control compressor discharge pressure
remove all but the frictional load during starting
第10题:
vary their speed according to temperature and load
start and come up to speed before air compression begins
change speed according to overload demands
reduce compressed air charge density
第11题:
changing the air filter
recharging the system
changing compressor lubricant
renewing container vacuum
第12题:
TDC
DTC
BDC
BCD
第13题:
increase compressor discharge pressure on demand
increase compressor operating speed as necessary
allow the motor to turn the compressor opposed only by friction
reduce the compressor frictional load when starting
第14题:
foreman
operator
opener
stevedore
第15题:
an immediate crankcase explosion
oil contamination in the compressed air
a decrease in compressor capacity
no immediate loss of the compressed air capacity
第16题:
unloaded
primed
filled with water
greased
第17题:
inter cooler
cylinder
outlet pipe
inlet pipe
第18题:
air cylinder
combustion chamber
steam drum
expansion tank
第19题:
inlet pipe
outlet pipe
inter cooler
after cooler
第20题:
combustion control air system
supply air system
ships service air system
low pressure deck air system
第21题:
admit only enough fresh outside air to provide proper ventilation
reduce the air reheating system load
lower the compressor head pressure
operate the purge recovery unit continuously
第22题:
yearly
quarterly
monthly
daily
第23题:
control air system
forced draft air system
supply air system
ships service air system