during abandon drill
during fire drill
weekly
when the rig is being moved
第1题:
A hydrostatic release mechanism for a liferaft ______.
A.must be wet before it will release
B.should be kept in a watertight cover except in an emergency
C.will inflate the raft in its cradle if operated manually
D.must be submerged to a certain depth to release automatically
第2题:
水手应该知道船上吊杆的安全工作负荷。()
第3题:
the load line becomes submerged
a non-watertight opening is at still water level
offset becomes excessive
reserve buoyancy is a maximum
第4题:
transferring drill water
dumping bulk materials
pumping out flooded compartments
evacuating the unit
第5题:
Soda acid
Carbon dioxide
Dry chemical
Cartridge-operated Foam
第6题:
dry chemical
foam
high-velocity fog
Water (cartridge-operated)
第7题:
tire control plan
fire drill
muster list
All of the above
第8题:
Emergency lighting at every embarkation station on deck and over sides
Emergency lighting at the storage positions for firemen’s outfits
Fire and gas detection and their alarm system
Power to operate the watertight doors and their indicators
第9题:
to windward should be opened and the ones to leeward should be closed
to leeward should be opened and the ones to windward should be closed
should be opened
should be closed
第10题:
force the warped,bulged,or deformed sections back into place
support and hold the area in the damaged position
withstand subsequent additional damage
make a watertight seal at the damaged area
第11题:
ISM
DOC
SMC
PSC
第12题:
the forepeak
messrooms
convenient protected topside locations
locked watertight containers
第13题:
CLOSE WATERTIGHT DOORS AND REPORT.的意思是:关闭水密门并报告。
第14题:
对
错
第15题:
transferring water ballast
jettisoning cargo
pumping out flooded compartments
abandoning ship
第16题:
also called GM
the void portion of the ship below the waterline which is enclosed and watertight
affected by the number of transverse watertight bulkheads
the watertight portion of a vessel above the waterline
第17题:
tank capacities
stability in the event of damage
towing speed
anchor holding ratio
第18题:
must be wet before it will release
should be kept in a watertight cover except in an emergency
will inflate the raft in its cradle if operated manually
must be submerged to a certain depth to release automatically
第19题:
continuous
watertight
transverse
non-watertight
第20题:
All watertight doors which are in use while the vessel is underway shall be operated
All lifeboat equipment shall be examined
Fire pumps shall be started and all exterior outlets opened
All of the above
第21题:
Maritime Safety Administration
Master of the vessel
Chief Engineer
Chief Mate
第22题:
structural bulkhead
exterior bulkhead
centerline bulkhead
joiner bulkhead
第23题:
open the watertight door and take a quick look
open the hatch dogs on the side away from the hinges
tap the bulkhead with a hammer to check for a water level
feel the bulkhead to see if it is hot