An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely caus

题目

An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause of the install failure?()

  • A、The bosinst_data has an incorrect console defined.
  • B、The bosinst_data is incompatible with the level of spot.
  • C、The bosinst_data has an incorrect disk location defined.
  • D、The bosinst_data has an incorrect language option defined.

相似考题
更多“An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause”相关问题
  • 第1题:

    During a NIM install, the system stops with the LED code 611.What is the cause of the issue?()

    • A、A failure to NFS mount filesystems from the NIM client
    • B、A failure to NFS mount filesystems from the NIM master
    • C、A failure to retrieve the tftp client info from the NIM master
    • D、A failure to retrieve the tftp server info from the NIM master

    正确答案:B

  • 第2题:

    An install of cluster .es software failed. Output from the failure indicates missing system  requisites. Every subsequent attempt to install the software abended.  In order for the cluster to install,the most likely way for the administrator to resolve this problem is to install the "bos.data" and which other fileset(s)?()  

    • A、 "rsct.*"
    • B、 "xIC*" and "rsct.*"
    • C、 "bos.adt.*" and "rsct.*"
    • D、 "csm.*.rte" and "rsct.*"

    正确答案:C

  • 第3题:

    A customer is in the process of testing their configuration prior to going live. The administrator discovers thatPowerHA is taking 31 seconds to deal with a standard NIC failure. What can the administrator do to speed upthe process of NIC failure detection and diagnosis?()

    • A、Tune the topsvcs NIM settings
    • B、Tune the grpsvcs NIM settings
    • C、Activate the fast failure detection (FFD) feature
    • D、Activate the Gigabit fast failover feature on the physical adapters

    正确答案:A

  • 第4题:

    An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data.  What is the most likely cause of the install failure?()

    • A、The bosinst_data has an incorrect console defined.
    • B、The bosinst_data is incompatible with the level of spot.
    • C、The bosinst_data has an incorrect disk location defined.
    • D、The bosinst_data has an incorrect language option defined.

    正确答案:C

  • 第5题:

    For NIM to install client machines located in a non-adjacent network, which routing must be defined?()  

    • A、Boot/install servers will be required on each intermediate network.
    • B、When an install is initiated by the client, routing is only required from the LPAR back to the NIM master.
    • C、When an install is initiated by the NIM master, routing is only required from the NIM master to the client.
    • D、Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.

    正确答案:D

  • 第6题:

    An administrator is defining an lpp_source calledlpp_AIX6 in NIM when the following warning message is displayed in the output:warning: 0042-267 c_mk_lpp_source: The defined lpp_source does not have the 'simages' attribute because one or more of the following packages are missing: Bos bos.net bos.diag bos.sysmgtbos.terminfo bos.terminfo.all.data bos.mp64 devices.common bos.64bit. What does this warning message mean?()

    • A、The lpp_AIX6 is not a valid lpp_source NIM resource.
    • B、The lpp_AIX6 can be used in NIM BOS operations to install AIX only on standalone clients.
    • C、The lpp_AIX6 can be used in NIM CUST operations to install software on SPOTs and running machines.
    • D、The lpp_AIX6 does not contain all of the required software packages for NIM CUST installation operations.WArialCourier NewTimes New RomanZ

    正确答案:C

  • 第7题:

    To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()

    • A、A mksysb resource, a SPOT resource, and an lpp_source resource
    • B、A SPOT resource, an lpp_source resource, and a machine definition
    • C、An lpp_source resource, a mksysb resource, and a machine definition
    • D、A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD

    正确答案:B

  • 第8题:

    单选题
    A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()
    A

    DLPAR functions are not available for cloned partitions

    B

    The new partition has the same node number as the original LPAR

    C

    Additional filesets need to be reinstalled after the alt_disk_install cloning

    D

    The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    An administrator is defining an lpp_source calledlpp_AIX6 in NIM when the following warning message is displayed in the output:warning: 0042-267 c_mk_lpp_source: The defined lpp_source does not have the 'simages' attribute because one or more of the following packages are missing: Bos bos.net bos.diag bos.sysmgtbos.terminfo bos.terminfo.all.data bos.mp64 devices.common bos.64bit. What does this warning message mean?()
    A

    The lpp_AIX6 is not a valid lpp_source NIM resource.

    B

    The lpp_AIX6 can be used in NIM BOS operations to install AIX only on standalone clients.

    C

    The lpp_AIX6 can be used in NIM CUST operations to install software on SPOTs and running machines.

    D

    The lpp_AIX6 does not contain all of the required software packages for NIM CUST installation operations.WArialCourier NewTimes New RomanZ


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server.  Which of the following provide post install diagnostics()
    A

    SPOT

    B

    lpp_source

    C

    mksysb

    D

    install CD


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    What are the minimal resources to perform a NIM BOS install?()
    A

    spot, lpp_source

    B

    mksysb, lpp_source

    C

    boot, bundle, nim_script

    D

    aix disks, spot, lpp_source


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()
    A

    A mksysb resource, a SPOT resource, and an lpp_source resource

    B

    A SPOT resource, an lpp_source resource, and a machine definition

    C

    An lpp_source resource, a mksysb resource, and a machine definition

    D

    A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD


    正确答案: C
    解析: 暂无解析

  • 第13题:

    After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()

    • A、The cfgmgr command was not run to reconfigure the devices
    • B、The machine was not booted into SMS MultiBoot mode after configuration
    • C、The machine was not in full system partition mode when the volume was created
    • D、The alt_disk_install command was not run with the -O option to remove references in the ODM

    正确答案:D

  • 第14题:

    To load the base operating system on a machine using NIM, what are the minimum NIM resources   that must be defined for the installation to succeed()

    • A、A mksysb resource, a SPOT resource, and an lpp_source resource
    • B、A SPOT resource, an lpp_source resource, and a machine definition
    • C、An lpp_source resource, a mksysb resource, and a machine definition
    • D、A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition

    正确答案:B

  • 第15题:

    An administrator has mirrored the root volume group to a second disk, but ’bootlist’ is failing to correctly add the second disk.  What is the likely cause of the problem?()  

    • A、The administrator has failed to run ’bosboot -ad <2nd disk>’ prior to the bootlist command.
    • B、The administrator has failed to run ’bootinfo -B <2nd disk>’ prior to the bootlist command.
    • C、The administrator has failed to run ’mirrorvg -m rootvg <2nd disk>’ prior to the bootlist command.
    • D、The administrator has failed to run ’bosboot -ad /dev/ipldevice <2nd disk>’ prior to the bootlist command.

    正确答案:A

  • 第16题:

    What are the minimal resources to perform a NIM BOS install?()

    • A、spot, lpp_source
    • B、mksysb, lpp_source
    • C、boot, bundle, nim_script
    • D、aix disks, spot, lpp_source

    正确答案:A

  • 第17题:

    If a restore from a NIM mksysb install hung on C54, which debug output would be best to investigate the problem?()

    • A、export INST_DEBUG =yes
    • B、bosboot -aID -d /dev/ipldevic
    • C、nim - to check -a debug =yes
    • D、 type 911 at -Welcome to BOS install- menu

    正确答案:D

  • 第18题:

    What are the steps required to perform a Preservation install on a server?()

    • A、Shutdown the server and boot it into SMS.Select SMS menu option OS Upgrade,Preservation install for the install type,and allow upgrade to run
    • B、Shut down the server and perform a network boot from a local NIM server.Select Presevation install for the install type,and allow upgrade to run
    • C、Shutdown the server and boot it into SMS.Select SMS menu option OS Upgrade,Presevation install for the install type,and allow for upgrade to run
    • D、Re-boot the server and NFS mount the bos images from a local NIM server.Run smit install.Select Presevation install for the install type,and allow upgrade to run

    正确答案:A

  • 第19题:

    While attempting to load a base operating system to a machine, an administrator is receiving bootp timeout error messages. What steps should be followed to troubleshoot communications between the NIM master and the client machine?()

    • A、View debug logs on NIM master for errors or failures.
    • B、Boot the client machine to SMS, and view the POST Error log.
    • C、Boot the client machine to SMS, setup remote IPL, and execute a ping test.
    • D、Boot the client machine to diagnostics, and ping the client from the NIM master.

    正确答案:C

  • 第20题:

    单选题
    To load the base operating system on a machine using NIM, what are the minimum NIM resources   that must be defined for the installation to succeed()
    A

    A mksysb resource, a SPOT resource, and an lpp_source resource

    B

    A SPOT resource, an lpp_source resource, and a machine definition

    C

    An lpp_source resource, a mksysb resource, and a machine definition

    D

    A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data.  What is the most likely cause of the install failure?()
    A

    The bosinst_data has an incorrect console defined.

    B

    The bosinst_data is incompatible with the level of spot.

    C

    The bosinst_data has an incorrect disk location defined.

    D

    The bosinst_data has an incorrect language option defined.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()
    A

    The cfgmgr command was not run to reconfigure the devices

    B

    The machine was not booted into SMS MultiBoot mode after configuration

    C

    The machine was not in full system partition mode when the volume was created

    D

    The alt_disk_install command was not run with the -O option to remove references in the ODM


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data.What is the most likely cause of the install failure?()
    A

    The bosinst_data has an incorrect console defined.

    B

    The bosinst_data is incompatible with the level of spot.

    C

    The bosinst_data has an incorrect disk location defined.

    D

    The bosinst_data has an incorrect language option defined.


    正确答案: B
    解析: 暂无解析